You are on page 1of 1

MATERIAL LIST

ITEM DESCRIPTION QTY


BY INSTRUMENTS HGP498 1/2"FNPT Hand Valve, 316 SS, Integral Metal Seat, 316 SS Stem, Grafoil Packing 4
BY PIPING PFT3 PFT28 1/2" X 3" Pipe Nipple S160 A312-TP316 SS SMLS TBE 4
PFT3 1/2" Hex Head Pipe Plug A182-F316 SS 4
HGP498

PFT28

PFT28
L

HGP498

PFT3

NOTE 6
VESSEL

PFT3

HGP498

PFT28

TIME: 09:16:05
PFT28
H

HGP498

GENERATED DATE: 08-Sep-10


BY PIPING
BY INSTRUMENTS PFT3

COIL EXCESS CAPILLARY AROUND HOLDER,


TAKING CARE NOT TO KINK OR CRUSH THE TUBING.
(SEE DETAIL # 166000-000-DG-IC04-0054)

CLASS 150, 300 & 600


NOTES
INSTRUMENT INSTALLATION DETAIL
1. SEE INSTRUMENT NOTES AND LEGEND DRAWING #166000-000-DG-IC04-0001.
2. FOR TAGS ASSIGNED TO THIS DETAIL SEE INSTRUMENT INDEX.
3 ISSUED FOR CONSTRUCTION GC DS GN 14-Sep-10 D/P LEVEL TRANSMITTER

HOOK-UP: LT-STD-002
3. INSTRUMENT CAPILLARY TO BE FIELD ROUTED AND SUPPORTED AS 2 ISSUED FOR CONSTRUCTION GC DS GN 25-Mar-10 CAPILLARY
REQUIRED.
4. NUTS, STUDS AND GASKETS FOR MOUNTING REMOTE SEAL ASSEMBLY 1 REVISED AS NOTED KRF PMB COMM 09-Feb-09 CARTAGENA EXPANSION PROJECT
SUPPLIED BY PIPING.
5. FLUSHING RING AND ASSOCIATED HARDWARE TO BE SUPPLIED WITH 0 ISSUED FOR DESIGN KRF PMB COMM 24-Aug-09
© CBI AMERICAS LTD. 2008. ALL RIGHTS RESERVED. CONTAINS CONFIDENTIAL INFORMATION PROPRIETARY TO CB&I, OR ITS FOR: Refineria de Cartagena S.A.
REMOTE SEAL. AFFILIATES, CLIENTS OR SUPPLIERS AND MAY NOT TO BE USED, REPRODUCED OR DISCLOSED WITHOUT CB&I'S WRITTEN
PERMISSION.

6. MOUNTING BRACKET SUPPLIED WITH TRANSMITTER. DRAWN: CK'D: APPD: DATE: SCALE:
NO. REVISION DRAWN CK'D APPD DATE
PMB RSB COMM 18-Aug-08 N/A PROJ NO: 166000 DWG NO: 000-DG-IC04-0020 REV: 3

You might also like