Professional Documents
Culture Documents
10
200 2235
CLEAR
NEW PARAPET
GIRL'S WASHROOM
W1 EX PARAPET
UPPER 225
NEW PARAPET
EX LANDING
1780
EX 10
201
EX
10
100
6 TYP
9
4
250
9
EX HR EX 2% SLOPE DN
W3 1
550
NEW BB
A-4
2
1245+/-
200
NEW
INSIDE
7 5
1830
8 UPPER
MODIFIED LANDING ELEVATOR LANDING
200 12
100
16 EX ROOF
W3
4 2% SLOPE DN
14 RISERS DN
195 +/- 1070 670 +/-
NEW PARAPET
W3
DOOR OPENING
1930 610
16 OPEN
CLEAR
1750
ELEVATOR SHAFT
AA
001 NEW PARAPET
A-4
CC
1 A-4 1
EX PARAPET
W3
10
1
4
HR
3
2540 TYP
PARTIAL ROOF PLAN
14 RISERS DN
CLEAR
11 11 11 11
EX RADIATOR
13
1525
NEW
PROJECT NORTH
NEW LANDING
202
W E
ELEVATOR LANDING
EX 100 14
S
PROJECT TITLE
DD NEW
15 Central School
A-5
Elevator
PARTIAL SECOND FLOOR PLAN NEW
811 Stanley Street
Nelson, BC
NOTES
PROJECT STATUS
1. NEW REINF. CONC. BLOCK WALLS. REFER TO STRUCTURAL .
2. CUT NEW ENTRY THROUGH EX WALL. (TO BE SITE DETERMINED .) ISSUED FOR TENDER: May. 01, 2018
3. NEW BRICK VENEER W/ AIR SPACE & RIGID INSULATION. REFER TO DETAILS, PAGE A-5.
4. CONTINUE CONC. BLOCK TO ADJOIN EX. REFER TO STRUCTURAL . SHEET TITLE
Copyright reserved. This drawing, as an instrument of service, is the property of FAIRBANK ARCHITECTS LTD. and may not be reproduced without their permission and unless the reproduction carries their name. All designs and other information shown on this drawing are for use on the specified project only and shall not be used without the written permission of FAIRBANK ARCHITECTS LTD.