You are on page 1of 4

CONSTRUCTION OF FLOWLINES AND WELLHEAD

TIE-IN INSTALLATIONS AT ADCO’s FIELD (PACKAGE-"C")


(Project No:12335 & Contract No:16392.03 )
WELDING INSPECTION REPORT (PIPE LINE)
REPORT No: BQ 42-WIR-97 DATE: 1/4/2019 LOCATION : BQ 42
DRAWING No:12/78/07/0627/REV B CHAINAGE : FROM:09+10 TO:09+040
WELDING PROCESS: SMAW SERVICE : OIL Filler Metal Batch :
Pipe Dia & Thickness: 6" x 18.26 mm (API 5L GR.B) Accp Criteria: ISO 13847:2013, DEP 61.40.20.30 GEN FEB 2017&

Length of Type of Welders


Date of Fitup Pre-Heat Inter Pass
Pipe No. Heat No. Material Pipe in Bend - Weld No. WPS
Inspection Temp (°C) Temp (°C)
meters Degree
R&H F

1164 TD7852V 1 11.52 SP


PL-WPS-048
KP-09-MJ-760 04.01.2019 150°C <250 76/124 76/124
1162 TD7848V 1 11.43 SP

131 TD7848V 1 11.41 SP


PL-WPS-048
KP-09-MJ-762 04.01.2019 150°C <250 76/124 76/124
126 1375-1V 1 11.32 SP

181 1375-1V 1 11.4 SP


PL-WPS-048
KP-09-MJ-764 04.01.2019 150°C <250 76/124 76/124
121 1328-2V 1 11.2 SP
Legend: SP- Straight Pipe,HB-Horizontal Bend, SB-Sag Bend,OB-Over Bend R-Root Pass, H-Hot Pass ,F-Filling, C - Capping
1-Pipe (API 5L X 52), 2-ELBOW (A234 WPB), 3- TEE (A234 WPB), 4-FLANGE(A105N)
CONTRACTOR COMPA
NAME

SIGNATURE

DATE

RS-QA-F-FLM-007-Rev.A
E6010 - 2135058 &
E7010P1 - 2141385
ISO 13847:2013, DEP 61.40.20.30 GEN FEB 2017& ADCO SPEC 30.99.00.0041-2 Rev.0

Welders Date Of Visual


Remarks
Welding Inspection
C

C
76/124 04.01.2019 ACC
C

C
76/124 04.01.2019 ACC
C

C
76/124 04.01.2019 ACC
C
COMPANY