You are on page 1of 18

6/29/18

BUILDING TECHNOLOGY 5 (BT-5)


ALTERNATIVE BUILDING
CONSTRUCTION SYSTEM
Prepared by:
Ar. REYNALDO C. VENTURA, JR.
MSCM, UAP, Int’l Assoc. AIA, PEM, ACP

BT5 – Alternative Building


Construction System
Construction methods and techniques
for different types of buildings using
any appropriate alternative building
construction system.

1
6/29/18

Number of Units
3 Units
Number of
Meeting Hours
5 Hours / Week

Project Design Stages


• Concept/ Schematic
• Design Development
• Construction Documents
• Construction

2
6/29/18

BT-5 Course Outline


1. Cast-In-Place and Pre-cast
2. Pre-stressed Concrete
3. Composite Construction Method
4. Pre-Engineered Materials &
Structures
5. Wall Construction
6. Skylight Construction
7. Cable Structures
8. Membrane Structures
9. Shell Structures

BT5 MAIN ACTIVITIES


• Group Dynamics
(Reporting)
• Individual Work &
Presentation
• Quizzes & Exam

3
6/29/18

Group Dynamics

Group Report Presentation Guide


Discuss:
– INTRODUCTION &
DEFINITION
– ADVANTAGES &
DIS-ADVANTAGES
– DETAILS
– SAMPLE IMAGE
– VIDEO
PRESENTATION (IF
POSSIBLE)

4
6/29/18

Group Report Slide Guide


Should be:
– WHITE BACKGROUND
– 4:3 (STANDARD) PAGE RATIO
– MINIMUM FONTS SIZES IS 30 PT.
– FONT STYLE TO USE = ARIAL, TIMES
ROMAN, CALIBRI OR HELVETICA

Group Reporting Topic


Group 1
Cast-In-Place and Pre-cast
• Floor System and Roof Slab System
Ø Flat Slab
Ø Flat Plate
Ø Ribbed Floor Slab
Ø Waffle Slab
Ø Lift Slab
Ø Spanstress Floor System
Ø Slipform Method

5
6/29/18

Group Reporting Topic


Group 2
Cast-In-Place and Pre-cast
• Wall Panel System
Ø Flat Type
Ø Ribbed Type
Ø Window Type
Ø Wall Type
Ø Tilt-up Wall Panel System

Group Reporting Topic


Group 3
Pre-stressed Concrete
• Pre-tensioning
• Post-tensioning

6
6/29/18

Group Reporting Topic


Group 4
Composite Construction
Method
• Light Frame
• Composite Deck/Slab
• Composite Column
• Shear Connections
• Cambering

Group Reporting Topic


Group 5
Pre-Engineered Materials &
Structures
• Engineered Wood
• Wood Composite &
Building Boards
• Engineered Steel
Construction
• Other Structure (example:
Pre-engineered Green
house, Toilets, etc.)

7
6/29/18

Group Reporting Topic


Group 6
Wall Construction
• Curtain Walls
• Window Wall
• Metal Cladding
• Tilt-Up Construction
• Materials
• Stick System
• Ladder System
• Unitized System
• Rainscreen System

Group Reporting Topic


Group 7
Skylight Construction
• Skylight for Light
• Skylight for View
• Skylight for Ventilation
• Sizes Consideration
• Styles
• Materials

8
6/29/18

Group Reporting Topic


Group 8
Cable Structures
• Steels (Mild, High
Strength, Stainless,
etc.)
• Cable Nets
• Pneumatic
• Equilibrium Forces
• Deformations
• Materials

Group Reporting Topic


Group 9
Membrane Structures
• Structural Principle
• Basic Forms
• Tensile Membrane

9
6/29/18

Group Reporting Topic


Group 10
Shell Structures
• Concrete Shell
• Gridshell
• Thin-Shell
• Monocoque Shell
• Steel Framing

Individual Work
&
Presentation

10
6/29/18

Individual Work Project


Part 1 - PROJECT DESIGN DEVELOPMENT
– DIFFERENT VIEWS (MINIMUM 4 RENDERED
VIEWS; 2 EXTERIOR & 2 INTERIOR )
– FLOOR PLANS (WITH FURNITURE, FIXTURE &
EQUIPMENT LAYOUT)
– ELEVATIONS & SECTIONS
– MATERIALS SCHEDULE WITH IMAGE AND
INSTALLATION DETAILS

Individual Work Project


Design Development Submission Guide
– DOCUMENT SIZE/S = A3 OR 11”X17”
– SHOULD BE BINDED (COVER CODE = BLUE)
– INFORMATION PAGE
– ALL DRAWINGS SHOULD BE RENDERED
– MATERIAL SCHEDULES SHOULD INCLUDE
SUPPLIER OR MANUFACTURER CONTACT
INFORMATION
– MATERIALS SHOULD BE SCANNED OR
PICTURED AND INCLUDE IN THE BINDED SET.

11
6/29/18

Design Development
Example Submission

Individual Work Project


Part 2 – CONSTRUCTION DOCUMENTS
– CONSTRUCTION DOCUMENT
– BILL OF QUANTITY (ESTIMATE)
– SPECIFICATIONS

12
6/29/18

Individual Work Project


Construction Document Submission Guide
– SUBMISSION SIZES = AS PER BUILDING CODE
– SHOULD BE BINDED
– DRAWING/S INCLUDES: COVER PAGE
(Perspective, Site Development, Table Of
Contents, Information of the Project, Area
Calculation), PLANS (Partition, RCPs, Finishes,
Furniture, Power & Communication),
ELEVATIONS, SECTIONS, WALL/BAY SECTIONS,
ENLARGED PLANS & DETAILS, TYPICAL DETAILS,
SCHEDULES (Doors & Windows, Finishes, FFE)

Individual Work Project


Construction Document Submission Guide
– ALL DRAWING/S SHOULD HAVE: DRAFTING
SYSMBOLS (Column Grid, Tags, Dimensions,
Cross reference, etc.)
– DOCUMENT/S INCLUDES: PROBABLE
CONSTRUCTION COST (ESTIMATE) &
MATERIAL SPECIFICATIONS
– DOCUMENT/S CAN BE SUBMITTED IN A4 OR
LETTER SIZE PAPER

13
6/29/18

Construction Document
Example Submission

Individual Work Project


Title :
PROPOSED 3 STOREY, 4 BEDROOM RES.
Façade Design:
MODERN and/or CONTEMPORARY
Space Requirements:
3 CARS GARAGE, LIVING, DINING, KITCHEN,
SERVICE KITCHEN, MASTER’S BEDROOM,
BEDROOMS, GUEST ROOM, FAMILY AREA,
LIBRARY/STUDY ROOM, MINI GYM, TERRACE,
LANAI, TOILET & BATH, FATHER’S HOBBY AREA,
MAIDS QUARTER

14
6/29/18

Individual Work Project


Lot : 8.00 meters
Set Back:
FRONT 3.00
SIDE 1.50
REAR 1.50
14.00 meters

Height:
LIMIT 12.00
Note:
FIREWALL CAN
ROAD INTRODUCE

BT5 SCHEDULE (FY2018-19, 1ST SEM)


JUN 29
Ø MODULE INTRODUCTION & ORIENTATION
Ø GROUP & INDIVIDUAL ASSIGNMENT PRESENTATION
JUL 06
Ø GROUP 1 REPORTING
Ø STUDIO WORKS (INDIVIDUAL PROJECT)
JUL 13
Ø GROUP 2 REPORTING
Ø STUDIO WORKS (INDIVIDUAL PROJECT)

15
6/29/18

BT5 SCHEDULE (FY2018-19, 1ST SEM)


JUL 20
Ø GROUP 3 REPORTING
Ø STUDIO WORKS (INDIVIDUAL PROJECT)
JUL 27
Ø GROUP 4 REPORTING
Ø STUDIO WORKS (INDIVIDUAL PROJECT)
AUG 03
Ø GROUP 5 REPORTING
Ø STUDIO WORKS (INDIVIDUAL PROJECT)
AUG 10
Ø STUDIO WORKS (INDIVIDUAL PROJECT)

BT5 SCHEDULE (FY2018-19, 1ST SEM)


AUG 17
Ø SUBMISSION OF INDIVIDUAL WORK - PART 1
AUG 24
Ø MID-TERM EXAM
AUG 31
Ø GROUP 6 REPORTING
Ø STUDIO WORKS (INDIVIDUAL PROJECT)
SEP 07
Ø GROUP 7 REPORTING
Ø STUDIO WORKS (INDIVIDUAL PROJECT)

16
6/29/18

BT5 SCHEDULE (FY2018-19, 1ST SEM)


SEP 14
Ø GROUP 8 REPORTING
Ø STUDIO WORKS (INDIVIDUAL PROJECT)
SEP 21
Ø GROUP 9 REPORTING
Ø STUDIO WORKS (INDIVIDUAL PROJECT)
SEP 28
Ø GROUP 10 REPORTING
Ø STUDIO WORKS (INDIVIDUAL PROJECT)
OCT 05
Ø STUDIO WORKS (INDIVIDUAL PROJECT)

BT5 SCHEDULE (FY2018-19, 1ST SEM)


OCT 12
Ø SUBMISSION OF INDIVIDUAL WORK – PART 2
OCT 19
Ø FINAL EXAMINATION

17
6/29/18

IMPORTANT!!

Ø SUBMITTED LATE OF 1 WEEK = -5


Ø SUBMITTED LATE OF 2 WEEKS = -10
Ø SUBMITTED LATE OF 3 WEEKS ++ = -15

18

You might also like