CHECK LIST (Completion Team)

151010
S.No.: 1572 Dwg.No: Dwg.Name: Builder's Name
151000
DAMAGE CONTROL
Type of Vessel: 82BC Class: LR TSC
PLAN / BOOKLET
Std. Manhour: C1 spent for Preparation: C2 spent for Checking: Re-Work hours: Submission date:

Forms according to Owner's requirement. STAFF


C1 C2
Used the latest vessel as base ship.
1

Confirmed Tank Names and Tank Boundary lines to be the same in General
2 Arrangement Plan

Confirmed positions and types of valves to be the same in Piping Arrangement


3
Confirmed position of Ballast Control Valves to be the same in Piping
4
Arrangement on Upper Deck.
Positions of Weather or Water Tight Doors were confirmed from Arrangement
5 of Steel Doors.

Confirmed the number and position of Air Escape pipes and heads to be the same
6
in Piping Arrangement on Upper Deck.
Confirmed Type of Freeboard Mark from General Specifications.
7

Confirmed Central Remote Valve for Discharge System at Fore Part from Hull
8
Piping Diagram.
Confirmed effective date of contract of the vessel. (If after 2009-10-30, used A2
9
size)

10 Attached & checked Design Input List & Feedback List


Miscellaneous
Confirmed the following Information
Ship No. and Ship Name:
Drawing Name:
1
Drawing Number:
List Number:
Plan History:

Additional, Modifications, Revisions and Etc.

Comment Detail

LEGEND:
C1: DRAWER:  -- OK
X -- With comment
O -- Comment rectified
P -- Pending
C2: CHECKER:

C3: APPROVER:

You might also like