Professional Documents
Culture Documents
Homework 1
Discussion
There was a generalized disappointment, due to the conditions of access to the facilities, so the
number of visits that were expected in the facilities was drastically reduced by half.
The situation reflected in the financial statements was of losses for the year, so it was not
convenient to keep the building empty, due to the high cost of maintaining the facilities in that
way.
Task 2
RE LAUNGE
In view of the request of the planning department of the Municipality, I proceed to present my
study in order to convert the disused facility, after the last exhibition of the previous year,
completely remodeling the facilities, to function as a Theme Park.
Overall objective:
That the capital city reaches levels of revenue collection, managing to strengthen the finances of
the municipal government, generating sources of employment for the neighboring citizens of this
city, presenting an option so that the living conditions of the residents are acceptable.
Specific goal:
Sources of employment for the construction and maintenance of the theme park facilities in the
city.
Strengthening of municipal finances, through achieving a better collection with tickets to the
theme park.
Costs:
Taking into consideration that there is already a structured structure, the costs of remodeling and
adapting the theme park do not have significant relevance costs, giving a plus to the remodeled
project.
Benefits
Construction jobs will be generated for the remodeling of the facilities, business opportunities will
be generated for citizens interested in investing in the theme park, the finances of the municipality
will be strengthened.
Reasons:
A shopping center is chosen because the city lacks a place where families can share an ice cream,
eat or consume products for the home.
The main reason is that there is not a thematic park, which is of benefit and utility, for the
relaxation and recreation of the neighbors in general, where they can have an accessible place,
with safety, cleanliness and conditions. all, where you can promote good human relations
between residents of the municipality.
The plans of the already built facility were reviewed, a plan was drawn up of how the theme park
will be, with the help of architects, civil engineers and road planners, the budget was elaborated of
how much is spent for the remodeling, which will be 250,000 euros .
Surveys, interviews, opinion polls were conducted, the population was consulted, which they
would like to have in the municipality and this is the result.
• an aquarium 8827