Professional Documents
Culture Documents
For
MAY, 2018
PC-I
Rehabilitation / installation of Floodlight at Al-Hayat
1 Name of the Project
Stadium, Phoolnagar Kasur
4 Plan Provision
5 Project Objectives
Year-I Year-II
- Item
Provide year-wise estimates of
iii. physical activities by main 2017-18 2018-19
component Local FEC Local FEC
A Capital - - - -
B Revenue 50.335 - - -
Total 50.335 - - -
Annual operating and Maintenance cost for 01 year has been included in the
8 maintenance cost after completion estimate. Afterwards, Sports Board Punjab will take up the
of the Project operation & maintenance.
The youth of the city will avail the sports facilities in this
(a)(a Project Benefits
newly constructed ground.
i. Financial income to the project Although, this is a Social Sector Project which aims at
along with assumptions. provision of better Sports Facilities yet, at the same time,
some revenue shall also be generated through:
1. Membership fee
2. Day & night matches fee
3. Coaching fee
4. Income from PPP Mode projects
ii. Social benefits with indicators It is a Social Sector Project and the benefits cannot be
quantified but it will give pleasure, good health, positive time
pass and an activity for sports passionate fans.
iii. Environmental impact Grassy fields and horticulture in play grounds will give
positive/good impact on environment.
12 Implementation schedule
i. Indicate starting and completion The Project will take 1 Years (12 Months) for completion
dates of the project from the date of start.
ii. Item-wise/year-wise implementation
schedule in line chart co-related
with the phasing of physical N/A
activities.
iii. Mode of payment PMU-SBP consists of a lean Core Team which will
administer/ manage the project as a whole and channelize
payments only. Interim Payment Certificate (based on
Measurement Sheets duly verified by the Supervisory
Consultants) will be initiated by the Contractor and submitted
to the Supervisory Consultant who will re-verify all the
entries/ measurement sheets and forward the certified bill to
PMU-SBP for payment. Consultant verified/ certified
measurement sheets will be the only database for work done
and shall be treated as final for payment.
Additional projects/decisions
required to maximize socio-
14 N/A
economic benefits from the
proposed project
Certified that the project proposal has been prepared on the basis of instruction provided by
15
planning commission for the preparation of PC-1 for social sector projects.
i. The name, designation and phone # · Certified that PC-1 has been prepared as per instructions
of the officer responsible for, of Planning Commission of Pakistan for preparation of PC-1
preparing and checking be provided. for Social Sector Projects.
It may also be confirmed that PC-I
has been prepared as per
instructions for the preparation of
PC-I for social sector projects.
ii. The PC-I along with certificate must PC-1 has been signed by the Principal Accounting Officer.
be signed by the principal
accounting officer to ensure its
ownership.
D.A
D.A
D.A
D.A
D.A
Million
Providing/Fixing of
Flood Lights with
2 Sub Head No.2 Poles and 1 26,762,152 26,762,152
Construction of
Foundation for Poles
Providing/Fixing of Flood
Lights with Poles and 1 28,498,370 28,498,370 1,736,218 -
Construction of
Foundation for Poles
Same as Previous
4,232,800
4,656,080
ROUGH COST ESTIMATE FOR REHABILITATION / INSTALLATION OF
FLOODLIGHT AT AL-HAYAT STADIUM PHOOLNAGAR PATTOKI, KASUR
ABSTRACT OF COST
Renovation Of Cricket Ground
TOTAL
: 1 Cricket Ground
CT OF COST
Rs.5,744,551
Rs.5,744,551
Rs.2,690,089
Rs.88,590
Rs.1,819,544
Rs.80,214
Rs.540,934
Rs.500,000
Rs.5,719,370
Rs.25,181
Rs.5,744,551
ROUGH COST ESTIMATE FOR CONSTRUCTION OF SPORTS STADIUM AL- HAYAT STADIUM
KASUR
Total Rs:
M AL- HAYAT STADIUM
AMOUNT
22,933
717
10,060
46,561
145,545
286,875
28,243
540,934
ROUGH COST ESTIMATE FOR REHABILITATION / INSTALLATION OF
FLOODLIGHT AT AL-HAYAT STADIUM PHOOLNAGAR PATTOKI,
KASUR
ABSTRACT OF COST
Providing and Fixing of Flood Lights with Poles and Stair Rs.
Protection
Total Rs.
with Poles
4,706,190
23,792,180
28,498,370
2 Providing and Fixing Arena Vision MVF403 2000W 64 Nos Each 195,000 12,480,000
Complete with Impr. Ballast, Ignitor and 2000W
lamp complete in all respect.
Outgoing
3 Nos 250 Amp TP MCCB Adj
1 Nos Each
Feeder Pole Distribution Board
Outgoing
2 Nos 125 Amp TP MCCB Adj
Outgoing
36 Nos 20 Amp DP MCB
2 Nos Each
Earthing
Complete Earthing work as per drawing complete in all
10 aspects
5 Nos Each
T
RATE AMOUNT
9629.30 41,526.36
74.95 86,192.50
577.75 11,555.00
4173.75 509,197.50
504.90 429,165.00
69.65 557,200.00
265000.00 265,000.00
195000.00 390,000.00
155250.00 310,500.00
60000.00 300,000.00
Total RS 2,900,336.36
Say 2,900,000.00
1 x 2 = 2 No.
TOTAL: 2 No. 225000.00 Each Rs. 450000.00
ROUGH COST ESTIMATE FOR REHABILITATION / INSTALLATION
OF FLOODLIGHT AT AL-HAYAT STADIUM PHOOLNAGAR
PATTOKI, KASUR
ABSTRACT OF COST
Providing of Cricket Articles
Total
et Articles
OST
Rs.3,112,984
Rs.3,112,984
1 No Each 172,500
(Q/A) Supply of Manual Turf Roller 1000kg Fitted with
double action handle Both side ball bearings
6 complete. Round shape edges Smooth surface
especially for cricket pitches
1 No Each 270,000
(Q/A) Supply of Auto green & zero cutting Lawn Mover
20" 5 cutter blades. Tempered to 45H,R.C on
greaseable bearing. Main Roller in tow pieces Dia
7 8" made of aluminum chain gear & clutch system
Height of cutt2.4mm to 19mm (1/10" to 3/4") Fitted
with 5 H.P petrol Engine.
1 No Each 200,000
(Q/A) Supply of Ride on Lawn Mower size 36" Adjustable
height 2.5 to 44.5mm Fitted with 15 H.P Petrol
Engine. 6 cutters Blade Tempered at 45H.R.C.
Front roller all steel on sealed ball bearing. Main
8 roller diameter 10" mounted on grease able
bearing. Clutch and chan system with gear Handle
& with grass box.
1 No Each 350,000
(Q/A) Supplying manual lawn mowers 16"
9
(Q/A) Supplying Water Trolly
10
2 No Each 400000
Total Rs.
Amount
700,000
175,000
147,000
159,984
172,500
270,000
200,000
350,000
18,500
120,000
800,000
3,112,984
Providing of Cricket Articles
Analysis of Providing and Sitching of Canvas Cloth and Water Proof Polythene
Sheet Cricket Ground Pitch
Pitch 1x 40 x 90 = 3600 sf
@ Rs. 32.32 p.sf = 116,352
(M.R)
Add 17.5% GST on Rs. 116,352/- = 20,362
Add 20% Contractor profit and overhead charges on Rs. 116,352/- = 23,270
Total = 159,984
Say Rs. = 160,000
Rate per Sf 160000 = 44.44
3600
ROUGH COST ESTIMATE FOR REHABILITATION /
INSTALLATION OF FLOODLIGHT AT AL-HAYAT
STADIUM PHOOLNAGAR PATTOKI, KASUR
ABSTRACT OF COST
ABSTRACT OF COST
6,350,000
6,350,000
Anticipated Expenditure
Sr. Head
p.m (PKR)
A. Establishment
Watchman 1 No.
3 15000.00
(Player of relevant sport)
Malis 4 Nos.
4 60000.00
(Player of relevant sport)
B. Others
6 Repairs 10000.00
Total: 140000.00
Non-Scheduled Items
Foundation
MCU Box
P/F MCU box size 6'x5' having 16swg G.I sheet almera type openable double leave i/c
locking arrangement & painting complete Job 4 95400.00 381,600
As per comparative Statement, M/s is the lowest bidder with a total amount of Rs. 14,835,784/-
Rate (Rs) Amount (Rs) Rate (Rs) Amount (Rs) Rate (Rs) Amount (Rs)
4% Above 4,634,590.48
74464 74,464
Err:509 Err:509
Err:509 Err:509
2070166.8 8,280,667
3016000 3,016,000
99216 396,864
Err:509
Err:509