CALENDARIO DE ADQUISICIÓN DE MATERIAL

OBRA: “CREACIÓN DEL ÁREA DEPORTIVA EN LA LOCALIDAD DE CATUCANCHA, DISTRITO DE PUEBLO LIBRE – PROVINCIA DE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE PUEBLO LIBRE
DISTRITO: PUEBLO LIBRE PROV. HUAYLAS
CONSULTOR: DUEÑAS S.A.C.

semana 1
CODIGO RECURSO UNIDAD CANTIDAD PRECIO PARCIAL
CANTIDAD
MANO DE OBRA 109,128.14

1 TOPOGRAFO hh 5.6404 23.69 133.62 2.2562


2 SOLDADOR 3G hh 441.2640 26.20 11,561.12 176.5056
3 CAPATAZ hh 1.9019 17.03 32.39 0.7608
4 OPERARIO hh 1,968.9332 21.01 41,367.29 787.5733
5 OFICIAL hh 1,496.2784 17.03 25,481.62 598.5114
6 PEON hh 1,992.9616 15.33 30,552.10 797.1846

MATERIALES 191,066.25

1 CLAVOS PARA MADERA kg 72.3064 3.87 279.83 72.3064


2 C/C 3" CON CABEZA 3"
CLAVOS kg 0.2500 3.80 0.95 0.2500
3 CLAVOS CON CABEZA 4" kg 34.8628 3.87 134.92 34.8628
4 CLAVOS CON CABEZA 2" kg 0.2500 3.80 0.95 0.2500
5 ALAMBRE NEGRO N°16 kg 204.6018 3.87 791.81 204.6018
6 ALAMBRE NEGRO N°8 kg 61.7168 3.87 238.84 61.7168
7 PERNO pza 50.0000 29.25 1,462.50
8 AUTOPERFORANTE
PERNO N° pza 70.0000 32.50 2,275.00
12X7/8"
AUTOPERFORANTE N°
9 TIRAFONES 5" und 73.6500 0.35 25.78
10X3/4"
C/ARANDELA PLASTICA
10 PUERTA METALICA und 1.0000 655.40 655.40
P/TEJA ANDINA
2.50x2.35m
11 ALUCIN CURVO TIPO TR4 m2 1,134.1365 17.00 19,280.32
12 E=0.35MM
ALUCIN CURVO m2 55.1250 48.00 2,646.00
13 TRASLUCIDO
TUBO DE FIERROE=0.35MM
DE m 209.7900 19.49 4,088.81 209.7900
14 4"X4"X2.00MM
ACERO DE REFUERZO kg 3,648.7321 2.95 10,763.76 2432.4881
15 FY=4200 GRADO
ACERO LISO 60
DE 5/8" m 1,435.3600 4.66 6,688.78
16 ACERO LISO DE 3/8" m 2,940.6400 1.84 5,410.78
17 ACERO LISO DE 1/4" m 126.8800 2.57 326.08
18 PLANCHA DE ACERO DE pln 3.6000 330.50 1,189.80
19 1/4"X1.22X2.44M
PLANCHA DE ACERO DE pln 2.8000 508.47 1,423.72
20 3/8"X1.22X2.44M
ARENA FINA m3 9.0675 110.16 998.88
21 PIEDRA CHANCADA DE m3 18.7560 110.17 2,066.35 12.5040
22 1/2"
PIEDRA MEDIANA (MAX. m3 2.0832 84.74 176.53 1.3888
23 4")
ARENA GRUESA m3 32.9128 110.17 3,626.00 21.9419
24 PIEDRA GRANDE (MAX. m3 73.9634 84.75 6,268.40 49.3089
25 8")
ALAMBRE TW 2.5 MM2 m 48.5000 1.25 60.63
26 CABLE TW # 14 AWG m 188.1000 1.55 291.56
27 4MM2
CONDUCTOR TW SOLIDO m 22.5750 1.25 28.22
28 1x2.5 MM2
CONDUCTOR TW SOLIDO m 18.9000 1.85 34.97
29 1x4 MM2
INODORO TQUE. BAJO und 6.0000 142.37 854.22
30 NORMAL
LAVATORIOBLANCO
ARUBAC/A.
MAS pza 4.0000 63.38 253.52
31 PEDESTAL
URINARIO CADET und 2.0000 92.37 184.74
32 BLANCO
TUBO DEC/A.
ABASTO 1/2" x und 6.0000 10.17 61.02
33 1/2" PLOMOCROMADO DE
SUMIDERO und 2.0000 6.90 13.80
34 3"
LAVADERO DE pza 1.0000 745.00 745.00
35 CONCRETO ENCHAPADO
GRIFO DE BRONCE 1/2" und 2.0000 16.50 33.00
CON CERAMICA
36 GABINETE METALICO und 1.0000 45.50 45.50
37 CON
FOCOBARRA DE COBRE
AHORRADOR DE und 2.0000 16.50 33.00
38 23W
FOCO DE BOLA und 2.0000 44.50 89.00
39 REFLECTOR DE 400W und 12.0000 291.64 3,499.68
40 INTERRUPTOR und 1.0000 26.80 26.80
41 TERMOMAGNETICO
INTERRUPTOR -2x und 2.0000 32.50 65.00
15 A
TERMOMAGNETICO -2x
42 CAJA OCTOGONAL GALV. und 14.0000 3.39 47.46
25 X
4" A 2 1/8 "
43 CAJA RECTANGULAR und 4.0000 1.10 4.40
44 LIVIANA 100x50mm
CAJA RECTANGULAR und 14.0000 6.78 94.92
45 GALVANIZADO
INTERRUPTOR4X21/8" SIMPLE pza 1.0000 8.50 8.50
46 INTERRUPTOR DOBLE pza 1.0000 10.20 10.20
47 TOMACORRIENTE DOBLE pza 2.0000 6.90 13.80
48 CAJA DE MADERA pza 2.0000 35.40 70.80
49 P/VALVULA
ASFALTO LIQUIDO RC-250 gln 0.4644 11.35 5.26
50 LADRILLO K.K. 18 und 1,741.5400 0.67 1,166.83 1741.5400
51 HUECOS 9x13x24 CMDE
CAJA DE REGISTRO und 2.0000 55.60 111.20
52 DESAGUE
CEMENTO 12"X24"PORTLAND BOL 895.8246 20.75 18,588.36 597.2164
53 TIPO
PLANCHAI (42.5KG)
TEJA ANDINA pln 44.1900 26.45 1,168.83
54 FIBROCEMENTO
CERAMICA 40cm x1.14 40cmx m2 14.1120 26.80 378.20
0.72
RUGOSO
55 MAYOLICA BLANCA m2 44.2620 23.40 1,035.73
56 20X30CM
CERRADURA LGO DE und 2.0000 62.50 125.00
57 TRES
CERROJO GOLPES3" und 6.0000 6.90 41.40
58 BISAGRA DE 4" und 18.0000 2.20 39.60
59 FLUXOMETRO PARA und 2.0000 125.00 250.00
60 URINARIO
LLAVE LAVATORIO VAHIA und 4.0000 35.40 141.60
61 CINTA AISLANTE rll 15.0000 4.30 64.50
62 CINTA REFLECTIVA rll 3.0000 65.40 196.20 3.0000
63 MALLA FAENERA rll 2.0000 95.80 191.60 2.0000
64 SEÑALES PREVENTIVAS und 4.0000 225.00 900.00 4.0000
65 E INFORMATIVAS
WAYPE kg 5.0500 12.00 60.60 5.0500
66 CORDEL m 33.4894 0.20 6.70 33.4894
67 SOLDADURA kg 347.0690 13.55 4,702.78 173.5345
68 CELLOCORD
PEGAMENTO PVC gln 1.2411 95.40 118.40 1.2411
69 CINTA BUTIL pza 100.0000 25.40 2,540.00
70 YESO DE 28 Kg BOL 0.8814 4.00 3.53 0.8814
71 PINTURA ESMALTE gln 6.3125 29.66 187.23
72 EPOXICO
PORCELANA NEGRO
BLANCA kg 8.3606 5.60 46.82
73 PEGAMENTO PARA PVC gln 0.8882 95.40 84.73 0.8882
74 AGUA
PEGAMENTOFORDUIT PARA und 19.0150 11.86 225.52
75 LOSETAS
PEGAMENTO Y CERAMICAS
PARA gln 0.1000 95.40 9.54
76 TUBERIA
JUEGO PARA PVCNIÑOS
(ELECT.) GLB 1.0000 14,108.40 14,108.40
77 SEGUN DETALLES
IMPRESION EN und 1.0000 165.00 165.00 1.0000
78 GIGANOGRAFIA
MEDIDAS DE MITIGACIONDE GLB 1.0000 1,600.00 1,600.00 0.3333
3.00X4.00M
AMBIENTAL
79 IMPRIMANTE gln 9.6458 28.00 270.08
80 FLETE TERRESTRE GLB 1.0000 6,521.97 6,521.97 0.5000
81 MOVILIZACION Y GLB 2.0000 677.97 1,355.94 1.0000
82 DESMOVILIZACION
HORMIGON DE m3 68.3216 93.22 6,368.94 45.5477
EQUIPOS Y
83 HORMIGON
MAQUINARIAS (PUESTO EN m3 0.5000 93.22 46.61 0.3333
84 OBRA)
LIJA PARA MADERA und 5.5118 3.00 16.54 5.5118
85 AGUA m3 24.1226 25.00 603.06 16.0817
86 ALMACEN, OFICINA Y GLB 3.0000 255.00 765.00 1.0000
87 CASETA
MADERADE GUARDIANIA
TORNILLO p2 1,748.5287 5.50 9,616.91 1165.6858
88 PUERTA DE MELAMINA und 6.0000 145.00 870.00
89 0.65X1.50M
DIVISION DE MELAMINA m2 8.9454 75.80 678.06
90 ESTACAS DE MADERA p2 3.5252 2.00 7.05 3.5252
91 REGLA DE MADERA p2 4.0762 3.30 13.45 4.0762
92 ANDAMIO DE MADERA p2 88.5481 8.00 708.38 88.5481
93 ANDAMIO TIPO TORRE und 738.7500 3.00 2,216.25 738.7500
94 LISTONES DE 2"X2"X4.0 M pza 8.0000 35.00 280.00 8.0000
95 MADERA EUCALIPTO und 2.0000 22.00 44.00 2.0000
96 ROLLIZO
TRIPLAY DE DE 4'x8'x
6"x6M4 mm pln 5.0000 24.00 120.00 5.0000
97 TRANQUERA und 4.0000 225.00 900.00 4.0000
98 MALLA DE ALAMBRE m2 299.9800 22.45 6,734.55
99 GALV.
ANGULO # 101"x1"x1/8"
2" X 2" m 301.2800 4.24 1,277.43
100 TUBO CUADRADO DE m 713.2125 22.59 16,111.47
ACERO 40X60X1.8MM
101 ANGULO DE FIERRO 1 m 487.4000 4.09 1,993.47
102 1/4"
VENTANAX 1 1/4"
DEXFIERRO
1/8" und 2.0000 175.80 351.60
103 2.00x0.50M
THINER gln 26.4520 12.71 336.20
104 PINTURA LATEX gln 12.1259 29.66 359.65
105 PINTURA ESMALTE gln 38.0445 27.96 1,063.72
106 PINTURA gln 14.4620 29.66 428.94
107 ANTICORROSIVA
CANALETA DE FIERRO m 7.2450 22.50 163.01
EPOXICA
GALVANIZADO
108 PUERTA DE FIERRO und 2.0000 508.47 1,016.94
109 0.85x2.40M
CANALETA DE FIERRO m 74.2350 22.10 1,640.59
110 GALVANIZADO
ABRAZADERA DE F°F° DE pza 2.2400 3.50 7.84
111 3"
ABRAZADERA DE F°F° pza 1.3800 6.80 9.38
112 E=1/8"
TUBERIA PVC SAP 1/2" m 40.7550 2.20 89.66
113 TUBERIA PVC SAP 3/4" m 42.0000 19.07 800.94
114 INSTALACIONES
UNION UNIVERSAL PVC und 4.0000 2.50 10.00
ELECTRICAS
SAP DEPVC
1 1/2"
115 CODO - SAP 2" x 90º und 2.3980 1.20 2.88
116 TEE PVC SAP DE 1/2" C/R und 24.2905 1.25 30.36
117 PARA
CODOAGUA PVC SAP 1/2" und 13.0000 1.25 16.25
118 AGUA
TUB. PVC SAL m 0.9000 3.95 3.56
119 P/DESAGUE
TEE PVC SAPDE 2"
- CLASE 10 und 21.0000 1.25 26.25
120 -CODO
1/2" DE 90 PVC SAL DE und 22.0000 3.80 83.60
121 2"
CODO DE 90 PVC SAL DE und 2.0000 6.40 12.80
122 3"
CODO DE 90 PVC SAL DE und 14.5750 6.80 99.11
123 4"
TEE SANITARIA DOB und 6.0000 8.60 51.60
124 C/REDUC
NIPLE PVCPVC SAPSAL 4"A2"
3/4"X 1/2" pza 4.0000 1.30 5.20
125 ADAPTADOR PVC SAP und 4.0000 2.10 8.40
126 1/2"
YEE PVC SAL 4" und 7.0000 8.60 60.20
127 YEE PVC SAL 2" und 7.1940 6.80 48.92
128 YEE PVC SAL C/REDUCC. und 5.0000 8.60 43.00
129 4"
YEE- 2"PVC SAL C/REDUCC. und 2.0000 8.40 16.80
130 4" - 3" PVC SAP 1/2"
CODO und 16.0000 1.20 19.20
131 CODO PVC - SAL 2" X 45° und 7.0000 3.20 22.40
132 YEE PVC C/REDUCCION pza 7.0000 6.80 47.60
133 4" X 2" PVC SAL 2"
TUBERIA m 37.9790 3.95 150.02
134 TUBERIA PVC SAL 4" m 28.8375 6.21 179.08
135 TUBERIA PVC SEL m 40.9380 4.65 190.36
136 D=20mm
TUBERIA PVC SAL 3" m 30.1840 4.25 128.28
137 REDUCCION PVC SAL 4" pza 2.0000 8.60 17.20
138 X 2"
SOMBRERO DE pza 3.0000 3.80 11.40
139 VENTILACION
TRAMPA PVC SAL PVC2"SAL 2" pza 2.0000 12.50 25.00
140 CAJA GALV. OCTOGONAL und 3.0000 1.20 3.60
141 DE
CURVA4" PVC - SEL (ELEC.) und 61.1200 2.20 134.46
142 20MM
CURVA PVC SEL PARA und 56.0000 0.55 30.80
143 INSTALACIONES
VALVULA DE PASO DE und 2.0000 16.50 33.00
ELECTRICAS
BRONCE 13/4"
DEBRONCE
1/2" Ø 4"
144 REGISTRO und 2.0000 6.60 13.20
145 ROSCADO
VIDRIO TRANSPARENTE p2 31.4370 3.20 100.60
EQUIPOS INCOLORO e=3mm 19,304.46
1 HERRAMIENTAS %MO 5,093.74
2 MANUALES
2 BOTAS DE JEBE und 10.0000 25.60 256.00 10.0000
3 ZAPATO DE SEGURIDAD und 25.0000 45.20 1,130.00 25.0000
4 TECLE DE 1 TON. und 27.1700 35.00 950.95 27.1700
5 GUANTES DE JEBE pza 15.0000 12.20 183.00 15.0000
6 NIVEL TOPOGRAFICO HE 5.6404 9.50 53.58 5.6404
7 GUANTES DE CUERO pza 45.0000 9.85 443.25 45.0000
8 CASCOS ROJOS pza 10.0000 10.20 102.00 10.0000
9 CASCOS BLANCOS pza 10.0000 10.20 102.00 10.0000
10 CASCOS AMARILLOS pza 10.0000 10.20 102.00 10.0000
11 CHALECOS DE pza 30.0000 35.40 1,062.00 30.0000
12 SEGURIDAD
LENTES DE PROTECCION pza 30.0000 6.80 204.00 30.0000
13 MEZCLADORA DE hm 72.4414 25.42 1,841.46 36.2207
14 CONCRETO DE 9 -11P3
CAMION VOLQUETE 12 hm 3.0059 135.59 407.57 1.5030
M3.
15 EQUIPO DE SOLDAR hm 195.0698 12.50 2,438.37 78.0279
16 ESMERIL hm 85.3336 3.50 298.67 42.6668
17 COMPRESORA DE AIRE hm 55.0796 5.40 297.43 22.0318
18 2.5 HP
VIBRADOR DE hm 30.9777 15.25 472.41 15.4889
19 CONCRETO 4 HP 1.50"
MOTOSOLDADORA DE hm 101.0000 12.50 1,262.50 40.4000
20 250 AMP
PLANCHA hm 7.3118 15.80 115.53 7.3118
21 COMPACTADORA
GRUA VIBRAT. hm 16.0000 155.50 2,488.00
4.00 HP
CIÓN DE MATERIALES
O DE PUEBLO LIBRE – PROVINCIA DE HUAYLAS – ANCASH – SEGUNDA ETAPA”

semana 1 semana 2 semana 3


PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
43,651.25 43,651.25 21,825.63

53.45 2.2562 53.45 1.1281 26.72


4,624.45 176.5056 4,624.45 88.2528 2,312.22
12.96 0.7608 12.96 0.3804 6.48
16,546.91 787.5733 16,546.91 393.7866 8,273.46
10,192.65 598.5114 10,192.65 299.2557 5,096.32
12,220.84 797.1846 12,220.84 398.5923 6,110.42

58,564.00 103,259.14 29,243.11

279.83
0.95
134.92
0.95
791.81
238.84
50.0000 1,462.50
70.0000 2,275.00
73.6500 25.78
1.0000 655.40
1134.1365 19,280.32
55.1250 2,646.00
4,088.81
7,175.84 1216.2440 3,587.92
1435.3600 6,688.78
2940.6400 5,410.78
126.8800 326.08
3.6000 1,189.80
2.8000 1,423.72
9.0675 998.88
1,377.57 6.2520 688.78
117.69 0.6944 58.84
2,417.34 10.9709 1,208.67
4,178.93 24.6545 2,089.47
48.5000 60.63
188.1000 291.56
22.5750 28.22
18.9000 34.97
6.0000 854.22
4.0000 253.52
2.0000 184.74
6.0000 61.02
2.0000 13.80
1.0000 745.00
2.0000 33.00
1.0000 45.50
2.0000 33.00
2.0000 89.00
12.0000 3,499.68
1.0000 26.80
2.0000 65.00
14.0000 47.46
4.0000 4.40
14.0000 94.92
1.0000 8.50
1.0000 10.20
2.0000 13.80
2.0000 70.80
0.4644 5.26
1,166.83
2.0000 111.20
12,392.24 298.6082 6,196.12
44.1900 1,168.83
14.1120 378.20
44.2620 1,035.73
2.0000 125.00
6.0000 41.40
18.0000 39.60
2.0000 250.00
4.0000 141.60
15.0000 64.50
196.20
191.60
900.00
60.60
6.70
2,351.39 173.5345 2,351.39
118.40
100.0000 2,540.00
3.53
6.3125 187.23
8.3606 46.82
84.73
19.0150 225.52
0.1000 9.54
1.0000 14,108.40
165.00
533.33 0.3333 533.33 0.3333 533.33
9.6458 270.08
3,260.99 0.5000 3,260.99
677.97 1.0000 677.97
4,245.96 22.7739 2,122.98
31.07 0.1667 15.54
16.54
402.04 8.0409 201.02
255.00 1.0000 255.00 1.0000 255.00
6,411.27 582.8429 3,205.64
6.0000 870.00
8.9454 678.06
7.05
13.45
708.38
2,216.25
280.00
44.00
120.00
900.00
299.9800 6,734.55
301.2800 1,277.43
713.2125 16,111.47
487.4000 1,993.47
2.0000 351.60
26.4520 336.20
12.1259 359.65
38.0445 1,063.72
14.4620 428.94
7.2450 163.01
2.0000 1,016.94
74.2350 1,640.59
2.2400 7.84
1.3800 9.38
40.7550 89.66
42.0000 800.94
4.0000 10.00
2.3980 2.88
24.2905 30.36
13.0000 16.25
0.9000 3.56
21.0000 26.25
22.0000 83.60
2.0000 12.80
14.5750 99.11
6.0000 51.60
4.0000 5.20
4.0000 8.40
7.0000 60.20
7.1940 48.92
5.0000 43.00
2.0000 16.80
16.0000 19.20
7.0000 22.40
7.0000 47.60
37.9790 150.02
28.8375 179.08
40.9380 190.36
30.1840 128.28
2.0000 17.20
3.0000 11.40
2.0000 25.00
3.0000 3.60
61.1200 134.46
56.0000 30.80
2.0000 33.00
2.0000 13.20
31.4370 100.60
12,907.43 4,564.26 1,832.78
5,093.74

256.00
1,130.00
950.95
183.00
53.58
443.25
102.00
102.00
102.00
1,062.00
204.00
920.73 36.2207 920.73
203.78 1.5030 203.78
975.35 78.0279 975.35 39.0140 487.67
149.33 42.6668 149.33
118.97 22.0318 118.97 11.0159 59.49
236.20 15.4889 236.20
505.00 40.4000 505.00 20.2000 252.50
115.53
10.6667 1,658.67 5.3333 829.33
1 OBRAS PRELIMINARES 19.4
2 MOVILIZACION Y DESMOVILIZACION DE EQUIPO 1
3 MOVILIZACION Y DESMOVILIZACION DE EQUIPO 1 13%
4 CASETA DE ALMACEN, OFICINA Y GUARDIANIA 8
5 CASETA DE ALMACEN Y GUARDIANIA 8 100%
6 CARTEL DE OBRA DE 3.60 x 2.40 m. 10.4
7 CAPATAZ 0.4 5%
8 OPERARIO 4 50%
9 OFICIAL 4 50%
10 PEON 2 25%
11 CLAVOS CON CABEZA DE 2 1/2" 3" Y 4" 0 100%
12 PIEDRA MEDIANA MAX. 4" 0 20%
13 CEMENTO PORTLAND TIPO I (42.5KG) 0 120%
14 GRAPAS 0 56%
15 PEGAMENTO x 1/8 GAL. 0 100%
16 GIGANTOGRAFIA DE 3.60x2.40 m BANNER 0 100%
17 HORMIGON 0 35%
18 MADERA TORNILLO 0 5500%
19 MADERA ROLLIZO EUCALIPTO 6"x6.00M 0 200%
20 BADEN KM 1+318 1,275.87
21 MEDICION Y TOPOGRAFIA 19.52
22 CAPATAZ 0.8 10%
23 OPERARIO 8 100%
24 PEON 8 100%
25 YESO 20KG 0 100%
26 ESTACAS DE MADERA 0 1000%
27 PINTURA ESMALTE 0 25%
28 WINCHA DE 50M 0.15 2%
29 NIVEL TOPOGRAFICO 1.28 16%
30 MIRA TOPOGRÁFICA 1.28 16%
31 REPARACION DE BADEN 1,256.37
32 OPERADOR DE EQUIPO LIVIANO 37.12 116%
33 CAPATAZ 48.15 150%
34 OPERARIO 110.32 345%
35 OFICIAL 145.27 454%
36 PEON 843.85 2637%
37 CLAVOS CON CABEZA DE 2 1/2" 3" Y 4" 0 619%
38 ALAMBRE NEGRO N°8 0 619%
39 PIEDRA SELECCIONADA DE 30CM PUESTA EN OBRA 0 8339%
40 AFIRMADO 0 2823%
41 ARENA GRUESA (Puesta en Obra) 0 7%
42 PIEDRA GRANDE DE 10" 0 740%
43 ASFALTO RC-250 0 29%
44 CEMENTO PORTLAND TIPO I (42.5KG) 0 25698%
45 ADITIVO CURADOR 0 49%
46 AGUA PUESTA EN OBRA 0 2847%
47 FLETE TERRESTRE BADEN 0 100%
48 HORMIGON 0 3068%
49 MADERA TORNILLO 0 7860%
50 MEZCLADORA DE CONCRETO DE 9 -11P3 24.15 75%
51 CAMION CISTERNA 4x2 (AGUA) 145-165 HP 2 000 GAL. 0.1 0%
52 VIBRADOR DE CONCRETO 5HP 24.15 75%
53 CALENTADOR 0.65 2%
54 COMPACTADOR VIBRATORIO TIPO PLANCHA 7 HP 14.47 45%
55 PLANCHA COMPACTADORA VIBRATORIA 7 HP 8.15 25%
56 PONTON KM 8+700 338.47
57 MEDICION Y TOPOGRAFIA 19.52
58 CAPATAZ 0.8 10%
59 OPERARIO 8 100%
60 PEON 8 100%
61 YESO 20KG 0 100%
62 ESTACAS DE MADERA 0 1000%
63 PINTURA ESMALTE 0 25%
64 WINCHA DE 50M 0.15 2%
65 NIVEL TOPOGRAFICO 1.28 16%
66 MIRA TOPOGRÁFICA 1.28 16%
67 REPARACION SUPERESTRUCTURA PONTON 318.95
68 CAPATAZ 3.97 17%
69 OPERARIO 39.67 165%
70 OFICIAL 39.67 165%
71 PEON 195.98 817%
72 FLETE TERRESTRE PONTON 0 100%
73 TABLA DE MADERA EUCALIPTO 2"x10"x4M 0 11109%
74 TABLA DE MADERA EUCALIPTO 3"x10"x4M 0 67788%
75 VIGA LONGITUDINAL DE MADERA REDONDA EUCALIPTO 0 700%
DE 20" A 25"x6M
76 TALADRO CON BROCA 21 88%
77 TIRFOR 5 Ton. 18.67 78%
78 SEGURIDAD Y SALUD 412
79 EQUIPO DE PROTECCION PERSONAL 392
80 CASCO DE SEGURIDAD 64 800%
81 LENTES DE SEGURIDAD 64 800%
82 CHALECO DE SEGURIDAD 80 1000%
83 BOTA DE JEBE 64 800%
84 ZAPATO DE SEGURIDAD 16 200%
85 GUANTES DE CUERO 64 800%
86 GUANTES DE JEBE 40 500%
87 EQUIPO DE PROTECCION COLECTIVA 12
88 MALLA FAENERA 4 50%
89 CINTA DE REFLECTIVA 8 100%
90 SEÑALIZACION DE SEGURIDAD DURANTE LA EJECUCION 8
DE LA OBRA
91 SEÑAL PREVENTIVA 8 100%
92 LIMPIEZA GENERAL 0
93 LIMPIEZA GENERAL DE OBRA 0
94 CAPATAZ 0 0%
95 PEON 0 100%
DESCRIPCION UNIDAD DE UNIDAD DE FACTOR DE
TRABAJO ASIGNACION USO
OBRAS PRELIMINARES 19.4
MOVILIZACION Y DESMOVILIZACION DE EQUIPO 1
MOVILIZACION Y DESMOVILIZACION DE EQUIPO 1 0.13 0.13
CASETA DE ALMACEN, OFICINA Y GUARDIANIA 8
CASETA DE ALMACEN Y GUARDIANIA 8 1 1.00
CARTEL DE OBRA DE 3.60 x 2.40 m. 10.4
CAPATAZ 0.4 0.05 0.40
OPERARIO 4 0.5 4.00
OFICIAL 4 0.5 4.00
PEON 2 0.25 2.00
CLAVOS CON CABEZA DE 2 1/2" 3" Y 4" 0 1 1.00
PIEDRA MEDIANA MAX. 4" 0 0.2 0.20
CEMENTO PORTLAND TIPO I (42.5KG) 0 1.2 1.20
GRAPAS 0 0.56 0.56
PEGAMENTO x 1/8 GAL. 0 1 1.00
GIGANTOGRAFIA DE 3.60x2.40 m BANNER 0 1 1.00
HORMIGON 0 0.35 0.35
MADERA TORNILLO 0 55 55.00
MADERA ROLLIZO EUCALIPTO 6"x6.00M 0 2 2.00
BADEN KM 1+318 1275.87
MEDICION Y TOPOGRAFIA 19.52
CAPATAZ 0.8 0.1 0.80
OPERARIO 8 1 8.00
PEON 8 1 8.00
YESO 20KG 0 1 1.00
ESTACAS DE MADERA 0 10 10.00
PINTURA ESMALTE 0 0.25 0.25
WINCHA DE 50M 0.15 0.02 0.02
NIVEL TOPOGRAFICO 1.28 0.16 0.16
MIRA TOPOGRÁFICA 1.28 0.16 1.28
REPARACION DE BADEN 1256.37
OPERADOR DE EQUIPO LIVIANO 37.12 1.16 37.12
CAPATAZ 48.15 1.5 48.15
OPERARIO 110.32 3.45 110.32
OFICIAL 145.27 4.54 145.27
PEON 843.85 26.37 843.85
CLAVOS CON CABEZA DE 2 1/2" 3" Y 4" 0 6.19 6.19
ALAMBRE NEGRO N°8 0 6.19 6.19
PIEDRA SELECCIONADA DE 30CM PUESTA EN OBRA 0 83.39 83.39
AFIRMADO 0 28.23 28.23
ARENA GRUESA (Puesta en Obra) 0 0.07 0.07
PIEDRA GRANDE DE 10" 0 7.4 7.40
ASFALTO RC-250 0 0.29 0.29
CEMENTO PORTLAND TIPO I (42.5KG) 0 256.98 256.98
ADITIVO CURADOR 0 0.49 0.49
AGUA PUESTA EN OBRA 0 28.47 28.47
FLETE TERRESTRE BADEN 0 1 1.00
HORMIGON 0 30.68 30.68
MADERA TORNILLO 0 78.6 78.60
MEZCLADORA DE CONCRETO DE 9 -11P3 24.15 0.75 24.15
CAMION CISTERNA 4x2 (AGUA) 145-165 HP 2,000 GAL. 0.1 0 0.10
VIBRADOR DE CONCRETO 5HP 24.15 0.75 24.15
TALADRO CON BROCA 0.65 0.02 0.65
CALENTADOR 14.47 0.45 14.47
PLANCHA COMPACTADORA VIBRATORIA, 7 HP 8.15 0.25 8.15
PONTON KM 8+700 338.47
MEDICION Y TOPOGRAFIA 19.52
CAPATAZ 0.8 0.1 0.80
OPERARIO 8 1 8.00
PEON 8 1 8.00
YESO 20KG 0 1 1.00
ESTACAS DE MADERA 0 10 10.00
PINTURA ESMALTE 0 0.25 0.25
WINCHA DE 50M 0.15 0.02 0.02
NIVEL TOPOGRAFICO 1.28 0.16 1.28
MIRA TOPOGRÁFICA 1.28 0.16 1.28
REPARACION SUPERESTRUCTURA PONTON 318.95
CAPATAZ 3.97 0.17 3.97
OPERARIO 39.67 1.65 39.67
OFICIAL 39.67 1.65 39.67
PEON 195.98 8.17 195.98
FLETE TERRESTRE PONTON 0 1 1.00
TABLA DE MADERA EUCALIPTO 2"x10"x4M 0 111.09 111.09
TABLA DE MADERA EUCALIPTO 3"x10"x4M 0 677.88 677.88
VIGA LONGITUDINAL DE MADERA REDONDA 7.00
0 7
EUCALIPTO DE 20" A 25"x6M
TALADRO CON BROCA 21 0.88 21.00
TIRFOR 5 Ton. 18.67 0.78 18.67
SEGURIDAD Y SALUD 412
EQUIPO DE PROTECCION PERSONAL 392
CASCO DE SEGURIDAD 64 8 8.00
LENTES DE SEGURIDAD 64 8 8.00
CHALECO DE SEGURIDAD 80 10 10.00
BOTA DE JEBE 64 8 8.00
ZAPATO DE SEGURIDAD 16 2 2.00
GUANTES DE CUERO 64 8 8.00
GUANTES DE JEBE 40 5 5.00
EQUIPO DE PROTECCION COLECTIVA 12
MALLA FAENERA 4 0.5 0.50
CINTA DE REFLECTIVA 8 1 1.00
SEÑALIZACION DE SEGURIDAD DURANTE LA 8
EJECUCION DE LA OBRA
SEÑAL PREVENTIVA 8 1 1.00
LIMPIEZA GENERAL 0
LIMPIEZA GENERAL DE OBRA 0
CAPATAZ 0 0
PEON 0 1 0.00
CATEGORIA DE MANO DE OBRA Y EQUIPOS
OPERADOR DE EQUIPO LIVIANO
CAPATAZ
OPERARIO
OFICIAL
PEON
MEZCLADORA DE CONCRETO DE 9 -11P3
CAMION CISTERNA 4x2 (AGUA) 145-165 HP 2,000 GAL.
VIBRADOR DE CONCRETO 5HP
TALADRO CON BROCA
CALENTADOR
TIRFOR 5 Ton.
COMPACTADOR VIBRATORIO TIPO PLANCHA 7 HP
PLANCHA COMPACTADORA VIBRATORIA, 7 HP
NIVEL TOPOGRAFICO
MIRA TOPOGRÁFICA
CODIGO
RECURSOS UNIDAD CANTIDAD

1 OPERADOR DE EQUIPO LIVIANO hh 37.1134


2 CAPATAZ hh 54.1153
3 OPERARIO hh 169.9741
4 OFICIAL hh 188.9257
5 PEON hh 1081.8332
6 CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" kg 7.1887
7 ALAMBRE NEGRO N°8 kg 6.1887
8 PIEDRA MEDIANA MAX. 4" m3 0.2
9 PIEDRA SELECCIONADA DE 30CM PUESTA EN OBRA m3 83.3929
10 AFIRMADO m3 28.229
11 ARENA GRUESA (Puesta en Obra) m3 0.0667
12 PIEDRA GRANDE DE 10" m3 7.4049
13 ASFALTO RC-250 GLN 0.2892
14 CEMENTO PORTLAND TIPO I (42.5KG) BOL 258.1829
15 ADITIVO CURADOR GLN 0.4857
16 CASETA DE ALMACEN Y GUARDIANIA GLB 1
17 AGUA PUESTA EN OBRA m3 28.4663
18 GRAPAS cja 0.555
19 PEGAMENTO x 1/8 GAL. Und 1
20 GIGANTOGRAFIA DE 3.60x2.40 m BANNER Und 1
21 SEÑAL PREVENTIVA Und 1
22 FLETE TERRESTRE BADEN GLB 1.0012
23 FLETE TERRESTRE PONTON GLB 0.9996
24 HORMIGON m3 31.03
25 YESO 20KG bls 2
26 MALLA FAENERA rll 0.5
27 CASCO DE SEGURIDAD Und 8
28 LENTES DE SEGURIDAD Und 8
29 CHALECO DE SEGURIDAD Und 10
30 CINTA DE REFLECTIVA rll 1
31 BOTA DE JEBE PAR 8
32 ZAPATO DE SEGURIDAD PAR 2
33 GUANTES DE CUERO PAR 8
34 GUANTES DE JEBE PAR 5
35 TABLA DE MADERA EUCALIPTO 2"x10"x4M p2 111.09
36 TABLA DE MADERA EUCALIPTO 3"x10"x4M p2 677.88
37 MADERA TORNILLO p2 133.5948
38 ESTACAS DE MADERA Und 20
39 MADERA ROLLIZO EUCALIPTO 6"x6.00M Und 2
40 VIGA LONGITUDINAL DE MADERA REDONDA EUCALIPTO DE Und 6.9993
41 PINTURA ESMALTE GLN 0.5
42 HERRAMIENTAS MANUALES %MO
43 WINCHA DE 50M Und 0.3
44 MEZCLADORA DE CONCRETO DE 9 -11P3 hm 24.1539
45 CAMION CISTERNA 4x2 (AGUA) 145-165 HP 2,000 GAL. hm 0.0964
46 VIBRADOR DE CONCRETO 5HP hm 24.1539
47 TALADRO CON BROCA hm 21
48 CALENTADOR hm 0.6452
49 TIRFOR 5 Ton. hm 18.6648
50 COMPACTADOR VIBRATORIO TIPO PLANCHA 7 HP hm 14.4723
51 PLANCHA COMPACTADORA VIBRATORIA, 7 HP hm 8.1576
52 NIVEL TOPOGRAFICO hm 16
53 MIRA TOPOGRÁFICA hm 16
54 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1
SEMANA 01 SEMANA 02 SEMANA 03
PRECIO PARCIAL
CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL

10 371.13 0.94 9.40 20.38 203.80 15.80 158.00


12 649.38 2.94 35.28 30.18 362.16 22.00 264.00
10 1699.74 10.94 109.40 96.39 963.90 52.66 526.60
8.75 1653.1 1.94 16.98 116.05 1015.44 67.95 594.56
7.5 8113.75 10.94 82.05 645.77 4843.28 394.12 2955.90
3.81 27.39 1.94 7.39 2.98 11.35 2.27 8.65
3.81 23.58 0.94 3.58 2.98 11.35 2.27 8.65
60 12 0.20 12.00 0.00 0.00
60 5003.57 0.94 56.40 46.41 2784.60 36.05 2163.00
50 1411.45 0.94 47.00 15.38 769.00 11.91 595.50
110 7.34 0.07 7.70 0.00 0.00 0.00
60 444.29 0.94 56.40 3.66 219.60 2.80 168.00
16.95 4.9 0.27 4.58 0.02 0.34 0.00
21.19 5470.9 1.94 41.11 144.05 3052.42 111.99 2373.07
35 17 0.46 16.10 0.03 1.05 0.00
500 500 1.00 500.00 0.00 0.00
5 142.33 0.94 4.70 15.51 77.55 12.02 60.10
8.47 4.7 0.56 4.74 0.00 0.00
10.17 10.17 1.00 10.17 0.00 0.00
169.49 169.49 1.00 169.49 0.00 0.00
225 225 1.00 225.00 0.00 0.00
500 500.6 0.94 470.00 0.06 30.00 0.00
1000 999.6 0.00 1.00 1000.00 0.00
60 1861.8 1.29 77.40 16.76 1005.60 12.99 779.40
4.24 8.48 2.00 8.48 0.00 0.00
95.8 47.9 0.50 47.90 0.00 0.00
10.2 81.6 8.00 81.60 0.00 0.00
6.8 54.4 8.00 54.40 0.00 0.00
35.4 354 10.00 354.00 0.00 0.00
65.4 65.4 1.00 65.40 0.00 0.00
25.6 204.8 8.00 204.80 0.00 0.00
45.2 90.4 2.00 90.40 0.00 0.00
9.85 78.8 8.00 78.80 0.00 0.00
12.2 61 5.00 61.00 0.00 0.00
2.54 282.17 0.00 97.33 247.22 13.76 34.95
2.54 1721.82 0.00 593.27 1506.91 84.61 214.91
5.5 734.77 1.94 10.67 43.71 240.41 33.95 186.73
2 40 11.00 22.00 0.00 0.00
30 60 1.00 30.00 0.00 0.00
150 1049.9 0.00 6.25 937.50 0.75 112.50
25.42 12.71 0.50 12.71 0.00 0.00
449.53 0.00 0.00 0.00
25.42 7.63 0.04 1.02 0.00 0.00
25 603.85 0.94 23.50 13.08 327.00 10.13 253.25
100 9.64 0.09 9.00 0.01 1.00 0.00
10 241.54 0.94 9.40 13.08 130.80 10.13 101.30
5 105 0.00 18.50 92.50 2.50 12.50
5 3.23 0.61 3.05 0.04 0.20 0.00
5 93.32 0.00 16.46 82.30 2.21 11.05
20 289.45 0.94 18.80 7.64 152.80 5.89 117.80
20 163.15 0.94 18.80 4.08 81.60 3.13 62.60
15 240 1.16 17.40 0.00 0.00
5 80 2.28 11.40 0.00 0.00
500 500 0.13 65.00 0.00 0.00
3266.39 20151.67 11763.01
371.20 #REF!
661.44 #REF!
1599.90 #REF!
1626.98 #REF!
7881.23 #REF!
27.39 #REF!
23.58 #REF!
12.00 #REF!
5004.00 #REF!
1411.50 #REF!
7.70 #REF!
444.00 #REF!
4.92 #REF!
5466.60 #REF!
17.15 #REF!
500.00 #REF!
142.35 #REF!
4.74 #REF!
10.17 #REF!
169.49 #REF!
225.00 #REF!
500.00 #REF!
1000.00 #REF!
1862.40 #REF!
8.48 #REF!
47.90 #REF!
81.60 #REF!
54.40 #REF!
354.00 #REF!
65.40 #REF!
204.80 #REF!
90.40 #REF!
78.80 #REF!
61.00 #REF!
282.17 #REF!
1721.82 #REF!
437.80 #REF!
22.00 #REF!
30.00 #REF!
1050.00 #REF!
12.71 #REF!
449.53 #REF!
1.02 #REF!
603.75 #REF!
10.00 #REF!
241.50 #REF!
105.00 #REF!
3.25 #REF!
93.35 #REF!
289.40 #REF!
163.00 #REF!
17.40 #REF!
11.40 #REF!
65.00 #REF!
35630.60
35181.07