Address:………………………… …………………………………………..
Divisional Engineer
Date:…………………………..
Vidyalaya
Repair of Building
BILL OF QUANTITIES
Prepared By : Checked By :
Name : Name :
Designation: Designation:
Date : Date :
Total
Discount (if any)
Total after Discount
Add 15% for Vat
Grand Total
Vat No.
Total amount (without vat) in word Rupees: …………………………………………………………………………
……………………………………………………………………………………………..
Signature of Contractor
Witness (2)
Total amount of Contract in wards Rupees Six hundred fifty Four Thousand five
Hundred fifty nine and cents fifty Only (With out VAT )
……………………………… ……………………………
Signature of D/E Colombo Signature of Contractor
Date : ……………………..
Witness (1)
Witness (2)
This estimate provides for Estimate for Construction of Boundary wall (Balance work - 120 L.ft.)
the expenses necessary to at Thanninayagam Tamil Vidyalaya. draw
Estimate for Construction 1 (A) No: ....................................... and as per BOQ No. ...................
of Boundary wall (Balance The increase in cost between the date of preparation of estimate
work - 120 L.ft.) at and date of preparation of rates applied to the engineer's estimate.
Thanninayagam Tamil
Vidyalaya draw Direct Construction Cost (DCC) = -
No : ............................. ...... Procurement preparedness activities
........................................
2 (B) Preparation of contour, Local authority approval 1% of DCC;
3 (C) Design documentation
If A › Rs. 300m 2.5% DCC
If 300m › A › Rs. 100m 3.0% DCC
If 100m › A 3.5% DCC
Post Contract - award activities
4 (D) Cost of resident supervision 1.5%
Administrative cost (Travelling, stationery, photocopy charges.) 0.5 -
5 (E) 1% DCC 3%
6 (F) Departmental Charges
Provision for the payment for water supply connection to NWS & DB
7 (G) including VAT 15%
8 (H) Provision for physical contingencies 10% of (D.C.C.) 216.60
9 (I) Provision for price escallation 1.5% to 10% of (D.C.C.)
10 (J) VAT 12% (A) + (I) + (H)
Total Cost Estimate 216.60
(A+B+C+D+E+F+G+H+I+J)
I certify the rates adopted in pricing the BOQ are fair and reasonable and the Quantities are in commensurate with the Drawings.
This estimate covers all the expenses of labour Size of the building:
material, tools,transport and overheads etc. for Floor area :
Roof repair of Commerce section at St. Pauls Balika Number of floors:
Vidyalaya Drawing Number.
including water supply, electricity and other internal and BOQ Number :
external services.
Amount in words: One million Eight hundred and Fifty thousand rupees only
Checked by :
(special grade) ………………………………………..
(Name and Designation) Name :
Divisional Engineer
…………………………………………
Approved
NCOE/TTC
of the building:
ber of floors:
ing Number.
Sub Total
…………………………………..
ional Engineer