Professional Documents
Culture Documents
CIVIL - DOCUMENTATION
RESULT
PASS FAIL
Comment :
Note : Project Manager is required to scan & email this pages to Project Design, Asset Development Unit within 5
days of SCA completion date.
CIVIL - DOCUMENTATION
Category
Defect
MJ
Not Not Clearance
No. External (Compound) Available :Major
Available Applicable Verification
MN
(Sign. & Date)
:Minor
1 Contract Civil MJ
Document
Fire Fighting MJ
As Built Architectural
MJ
Drawing
As Built Drawing
MJ
(Water Supply)
CIVIL - DOCUMENTATION
Category
Defect
MJ
Not Not Clearance
No. External (Compound) Available :Major
Available Applicable Verification
MN
(Sign. & Date)
:Minor
As Built Drawing
MJ
(Sewerage)
As Built Drawing
MJ
(Earthing System)
As Built Drawing
MJ
(Lightning Arrestor)
As Built Drawing
MJ
(Mechanical Ventilation)
CIVIL - DOCUMENTATION
Category
Defect
MJ
Not Not Clearance
No. External (Compound) Available :Major
Available Applicable Verification
MN
(Sign. & Date)
:Minor
Schematic Drawing MJ
Component Functional
MJ
Test
LV 200amp
MN
CIVIL - DOCUMENTATION
Category
Defect
MJ
Not Not Clearance
No. External (Compound) Available :Major
Available Applicable Verification
MN
(Sign. & Date)
:Minor
Bomba Endorsement –
MJ
Fire Fighting System
Certificate of Completion
and Compliance (CCC)
MJ
(evidence CCC being
process)
CIVIL - DOCUMENTATION
1. TNBD – AD
2. TNBD – AD
3. TNBD – AD
4. TNBD – APP
5. TNBD – APP
6. TNBD – O&M
7. TNBD – O&M
8.
9.
10.
CIVIL - DOCUMENTATION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.