You are on page 1of 7

APDV-5002-PSI SPECIFICATION COMPLIANCE AUDIT (SCA) CHECKLIST

CIVIL - DOCUMENTATION

GENERAL INFORMATION OF THE PROJECT

1. Project Name – PMU/PPU/SSU


2. SCA File Reference No.
3. Date of SCA
4. Scope of Audit 󠇯 External 󠇯 Transformer Bay
󠇯 Cable Cellar 󠇯 Switchgear Room
󠇯 Control Relay Panel Room 󠇯 Battery Room
󠇯 Meter Room
󠇯 Toilet, Guard House, Roofing & Others

RESULT

 PASS  FAIL
Comment :

Name (Lead Auditor) : Signature :

Note : Project Manager is required to scan & email this pages to Project Design, Asset Development Unit within 5
days of SCA completion date.

Approval Date: ASSET DEVELOPMENT , DISTRIBUTION NETWORK


Page 1 of 7
27th October 2017 DISTRIBUTION DIVISION, TNB
APDV-5002-PSI SPECIFICATION COMPLIANCE AUDIT (SCA) CHECKLIST

CIVIL - DOCUMENTATION

DOCUMENTATIONS INSPECTION CHECKLIST

Category
Defect
MJ
Not Not Clearance
No. External (Compound) Available :Major
Available Applicable Verification
MN
(Sign. & Date)
:Minor

1 Contract Civil MJ
Document
Fire Fighting MJ

2 Architectural Pre-Comp Plan/Layout


approved by Local MJ
Authorities

As Built Architectural
MJ
Drawing

Warranty for painting MJ

3 Civil & As Built C&S Drawing MJ


Structural
Roof Trusses Drawing MJ

Warranty for Roof Sheet MJ

Warranty for Anti Termite MJ

Summary Piling Records MJ

Soil Investigation Report MJ

Load Test or PDA for Pile MJ

4 Mechanical As Built Drawing


MJ
(Air-Condition)

As Built Drawing
MJ
(Water Supply)

Approval Date: ASSET DEVELOPMENT , DISTRIBUTION NETWORK


Page 2 of 7
27th October 2017 DISTRIBUTION DIVISION, TNB
APDV-5002-PSI SPECIFICATION COMPLIANCE AUDIT (SCA) CHECKLIST

CIVIL - DOCUMENTATION

Category
Defect
MJ
Not Not Clearance
No. External (Compound) Available :Major
Available Applicable Verification
MN
(Sign. & Date)
:Minor

As Built Drawing
MJ
(Sewerage)

As Built Drawing
MJ
(Earthing System)

As Built Drawing
MJ
(Lightning Arrestor)

As Built Drawing
MJ
(Mechanical Ventilation)

Operation Manual &


MN
Brochures (Air Condition)

Operation Manual &


MN
Brochures (Exhaust Fan)

Operation Manual &


Brochures MN
(Submersible Pump)

Warranty for Air


MJ
Conditioner

Warranty for Motorised


MJ
Roller Shutter

5 Electrical Earthing Test Report


i) Testing Equipment
Calibrated.
ii) Test Result Endorsed MJ
by Service Engineer
iii) Followed Standard IEEE
Standard 81

Approval Date: ASSET DEVELOPMENT , DISTRIBUTION NETWORK


Page 3 of 7
27th October 2017 DISTRIBUTION DIVISION, TNB
APDV-5002-PSI SPECIFICATION COMPLIANCE AUDIT (SCA) CHECKLIST

CIVIL - DOCUMENTATION

Category
Defect
MJ
Not Not Clearance
No. External (Compound) Available :Major
Available Applicable Verification
MN
(Sign. & Date)
:Minor

As-Built Electrical Drawing MJ

Schematic Drawing MJ

Brochure & Product


MJ
Warranty

6 Fire Fighting As-Built Fire Fighting


MJ
System (with System
SGP)
Fire Fighting System
MJ
Report

Room Integrity Test MJ

Blow out test MJ

Agent Integrity Test MJ

Discharge Integrity Test MJ

Component Functional
MJ
Test

Integrity Functional Test MJ

Corporate Guarantee from


MJ
Manufacturer

7 Utility Bill Water supply


MN

LV 200amp
MN

Approval Date: ASSET DEVELOPMENT , DISTRIBUTION NETWORK


Page 4 of 7
27th October 2017 DISTRIBUTION DIVISION, TNB
APDV-5002-PSI SPECIFICATION COMPLIANCE AUDIT (SCA) CHECKLIST

CIVIL - DOCUMENTATION

Category
Defect
MJ
Not Not Clearance
No. External (Compound) Available :Major
Available Applicable Verification
MN
(Sign. & Date)
:Minor

8 Certification Kelulusan Kebenaran


MJ
Documents Merancang
(Except for
Rehab Project) Kelulusan Pelan Bangunan MJ

Bomba Endorsement –
MJ
Fire Fighting System

Certificate of Completion
and Compliance (CCC)
MJ
(evidence CCC being
process)

Approval Date: ASSET DEVELOPMENT , DISTRIBUTION NETWORK


Page 5 of 7
27th October 2017 DISTRIBUTION DIVISION, TNB
APDV-5002-PSI SPECIFICATION COMPLIANCE AUDIT (SCA) CHECKLIST

CIVIL - DOCUMENTATION

VALIDATION BY TNB DISTRIBUTION DEPARTMENTS

No. Company / Department Name Signature

1. TNBD – AD

2. TNBD – AD

3. TNBD – AD

4. TNBD – APP

5. TNBD – APP

6. TNBD – O&M

7. TNBD – O&M

8.

9.

10.

Approval Date: ASSET DEVELOPMENT , DISTRIBUTION NETWORK


Page 6 of 7
27th October 2017 DISTRIBUTION DIVISION, TNB
APDV-5002-PSI SPECIFICATION COMPLIANCE AUDIT (SCA) CHECKLIST

CIVIL - DOCUMENTATION

VALIDATION BY CONSULTANTS / CONTRACTORS

No. Company / Department Name Signature

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

Approval Date: ASSET DEVELOPMENT , DISTRIBUTION NETWORK


Page 7 of 7
27th October 2017 DISTRIBUTION DIVISION, TNB

You might also like