Measurement Sheet
ame of Client : Pakistan State Oil Company Limited
me of Contractor : National Technical Services
Title of Project : : Misc Civil Works at Quetta

Work Order No # : 4110020110

ement Sheet For Bill No. :

Length Width Height


S.No Discription Unit Qty Sides Ft3
(Ft) (Ft) (Ft)

1.01 Dismantling of existing Boundary wall

1 South side Sft 1 455.26 11

2 West Side Sft 1 598.99 11


3 North Side Sft 1 172.82 11

4 1227.073 374.1
Extra Dismantling of Watch Towers
a Back New Tower no 01 Dismanting
i Wall 1 6 8.5
ii Wall 1 6 6
iii Column of Wall 1 1.5 6
iv Roof Shed 1 9.5 2
v Back Wall 1 6.5 4.5
b Back Old Tower no 02 Dismantling
i Walls 2 6 7
ii Boundray Wall 1 12.5 6
iii Boundary Wall 1 13.5 6
iv Roof Shed 2 9.5 2
c Old Tower no 04 Near Water Tank
i Walls 2 6 7
ii Roof Shed 2 9.5 2
Total Dismantling

1.02 Excavtion
1 Watch Tower Footing 2 11 11 4 968
2 Watch Tower No 01 Footing Extra Clumn 1 4.67 4.67 5.33 116.241437

3 Tranch (Nala) B/Wall School Side 1 6.33 4 4 101.28

2 Boundary Wall
i Single Column 89 4.67 4.67 5.33 10345.49
ii Double Column 19 5.17 5.17 5.33 2706.84

3 Stair Footing 2 3.75 4 0.5 15


Total Excavtion

1.03 Back Filling


1 Watch Tower
i Foofting Sides 4 X 2 11 0.33 1 29.04
ii Foofting Top to NGL Top 2 11 11 2.17 525.14
2 Boundary Wall Double Column
i Footing Sides 19 X 4 5.17 0.33 1.5 194.50
ii Footing Top to NGL Top 19 5.17 5.17 3 1523.5473
3 Single Column
i Footing Sides 90 X 4 4.67 0.33 1.5 832.194
ii Footing Top to NGL Top 90 4.67 4.67 3 5888.403

Page 1 of 20
Title of Project : : Misc Civil Works at Quetta

Work Order No # : 4110020110

ement Sheet For Bill No. :

Length Width Height


S.No Discription Unit Qty Sides Ft3
(Ft) (Ft) (Ft)
Total Back Filling
Deduction
i Double Column 19 5.17 2 0.75 147.345
ii Single Column 90 4.67 2 0.75 630.45
Total Deduction
Total Back Filling
Total Deduction
Total Back Filling
1.04 Earth Filling
1 2 7.5 7.5 1.17 131.625
Erath Filling of Watch Tower Flooring
Total Earth Filling
1.05 Stone Soling
1 Watch Tower Footing 2 11 11 0.5 121
2 Double Column Footing 19 5.17 5.17 0.5 253.92455
3 Single Column Footing 89 4.67 4.67 0.5 970.49605
4 Watch Tower Flooring 2 7.5 7.5 0.5 56.25
Total Stone Soling
1.06 CC 1:4:8
1 1) Watch Tower for Footing 2 11 11 0.33 79.86

2
Watch Tower no 01 for Plitnth Protection
i 2 9.5 3.25 0.25 15.44
ii 1 9.33 3.25 0.25 7.58
3
Watch Tower no 03 for Plitnth Protection
i 1 9.5 3.25 0.25 7.719
ii 1 9.33 3.25 0.25 7.58
4 Double Column Footing 19 5.17 5.17 0.33 167.59
5 Single Column Footing 89 4.67 4.67 0.33 640.53
6 Extra 1:4:8 for Trunch Nala 1 6.33 3.67 0.33 7.67
Total 1:4:8

1.07 CC 1:3:6
1
Boundary Wall (N+S+W)
i South side 1 408.26 0.75 2 612.39
ii West Side 1 536.993 0.75 2 805.4895
2 North Side 1 154.82 0.75 2 232.23
Back Side Wall with New Watch tower no 01 Railway
3
Side
i 1 394.33 0.75 2 591.495
ii 1 6 0.75 2 9
4 For New Watch Tower Flooring 2 7.5 7.5 0.17 19.125
Total 1:3:6

1.08 CC 1:2:4
Footing
Single Column Footing 89 4 4 1.5 2136.00
Double Column 19 4.67 4.67 1.5 621.55

Columns
Column Footing to Top Beam 127 1 1.5 21 4000.50
4 Plinth Beam
i South side 1 400.8 0.75 2.5 751.43

Page 2 of 20
Title of Project : : Misc Civil Works at Quetta

Work Order No # : 4110020110

ement Sheet For Bill No. :

Length Width Height


S.No Discription Unit Qty Sides Ft3
(Ft) (Ft) (Ft)
ii West Side 1 522.0 0.75 2.5 978.74
iii North Side 1 154.8 0.75 2.5 290.29

5 Tie Beam
i South side 1 393.3 0.75 1.5 442.4175
ii West Side 1 522.0 0.75 1.5 587.242125
iii North Side 1 128.8 0.75 1.5 144.9225
6 Coping Beam
i South side 1 393.3 1 0.5 196.63
ii West Side 1 522.0 1 0.5 260.9965
iii North Side 1 128.8 1 0.5 64.41
7 Extra For Trunch Nala
i Bed for water crossing 1 6.5 3 1.5 29.25

8 Watch Towers no 01 and 03


i Footing 2 10.33 10.33 1 213.4178
ii Footing to Top Slab of Column 4 X 2 23.67 0.75 0.75 106.515
iii Plinth Beam & Tie Beam 4 2 2 6 0.75 1.33 95.76
iv 4 2 2 6 0.75 1 72
R B Beam for 1st and 2nd Roof Slab
v 1st Roof Slabs 2 7.5 7.5 0.5 56.25
vi 2nd Slab of Railway Side 1 10.5 9 0.5 47.25
vii 2nd Slab of School Side 1 9 9 0.5 40.5
viii Extra Beam (Latik) 4 X 2 6 0.75 1 36
ix Watch Tower Flooring 2 7.5 7.5 0.17 19.125
9
9) Extra for Watch Tower Changing
a
Railway and Back Wall Corner Watch Tower no 01
i Footing for Column 1 4 4 1.5 24
ii Column 1 0.75 0.75 23.67 13.314375
iii Corner Column 1 1 1.5 8 12
iv 2 X 2 6.5 0.75 1 19.5
1st Roof Beam and 2nd Roof Beams
v 2 6 0.75 1 9
vi Slab 1st 1 6.5 7.5 0.5 24.375
vii Slab 2nd 1 6.5 9 0.5 29.25
Watch Tower Near Water Tank no 04
b
i 1st and 2nd Roof Beams 4 X 2 4.75 0.75 1 28.5
ii 2 13.5 0.75 1 20.25
iii 2 12.5 0.75 1 18.75
iv 1st Slabs 1 13.5 5.5 0.5 37.125
v 1 7.5 5.5 0.5 20.625
vi 2nd Slabs 1 15.5 5.5 0.5 42.625
vii 1 9.5 5.5 0.5 26.125
c
Watch Tower no 02 School and Back Old Tower
i Columns 3 Nos 3 1.5 1 0.5 2.25
ii 1st and 2nd Roof Beams 4 X 2 4.75 0.75 1 28.5
iii 2 13.5 0.75 1 20.25
iv 2 12.5 0.75 1 18.75
v 1st Slabs 1 13.5 5.5 0.5 37.125
vi 1 7.5 5.5 0.5 20.625
vii 2nd Slabs 1 15.5 5.5 0.5 42.625
viii 1 9.5 5.5 0.5 26.125
d Stair Footing 2 3.5 3 0.5 10.5

Page 3 of 20
Title of Project : : Misc Civil Works at Quetta

Work Order No # : 4110020110

ement Sheet For Bill No. :

Length Width Height


S.No Discription Unit Qty Sides Ft3
(Ft) (Ft) (Ft)
Total 1:2:4
1.09 DPC
1 South side 1 400.8 0.75
i West Side 1 522.0 0.75
ii North Side 1 154.8 0.75

New Watch Tower no 01 from Railway and Back Corner


4 1 6 0.75
Wall
New Watch Tower no 03 from School and Front Corner
5 2 6 0.75
Wall
Total DPC
1.10 PLINTH PROTECTION
Plinth Protection of Back and Raiway Side Watch Tower
1
01
i) 2 9.75 3
ii) 1 7.5 3
Plinth Protection of Front and School Side Watch Tower
2
03
i) 1 9.75 3
ii) 1 6.75 3
Total Plinth Protection

1.12 BRICK WORK


1 South side 1 393.3 0.75 13.33 3931.62
2 West Side 1 522.0 0.75 13.33 5218.63
3 North Side 1 128.8 0.75 13.33 1287.88
4 Near Water Tank Tower 04
i Front Wall 1 11.5 0.75 14 120.75
ii Railway Side Wall 1 10.5 0.75 14 110.25
iii Short Wall 2 4.75 0.75 6.5 46.3125
New Watch Tower no 01 Railway and Back Side Wall
5
Corner
i Back Side Wall 1 6 0.75 15.16 68.22
ii Sides and Front Walls 3 6 0.75 7 94.5
iii Due to Changing
a Side Boundary Wall 1 6 0.75 16.67 75.015
b Back Side Rebrick Work of Wall 1 5.5 0.75 7 28.875
6
Back Wall and School Side Wall Corner Watch Tower 02
i School Side Wall 1 11.5 0.75 14 120.75
ii Back Side Wall 1 10.5 0.75 14 110.25
iii Short Wall 2 4.75 0.75 6.5 46.3125

7 New Watch Tower no 03 of Front Wall and School Side


Wall Corner
i School Side Front B/Wall Side 2 6 0.75 15.17 136.53
ii Side and Eront Wall 2 6 0.75 7 63
8 Stair Footing
i Step 2 3.5 3.25 0.42 9.555
ii Step 2 2.58 3.25 0.67 11.2359
iii Step 2 1.5 3.25 0.67 6.5325
Total Brick Work
1.14 PLASTER 3/4''

Page 4 of 20
Title of Project : : Misc Civil Works at Quetta

Work Order No # : 4110020110

ement Sheet For Bill No. :

Length Width Height


S.No Discription Unit Qty Sides Ft3
(Ft) (Ft) (Ft)
a Boundary Wall (out side)
South side Sft 1 6.5 18.00
Sft 1 57 18.50
Sft 1 55.25 18.33
Sft 1 56 18.17
Sft 1 56.42 19.13
Sft 1 55.42 18.96
Sft 1 55 18.59
Sft 1 56.67 17.92
Sft 1 42.75 17.33

West side Sft 1 36.75 17.54


Sft 1 55.16 17.54
Sft 1 55.58 17.54
Sft 1 55.33 18.84
Sft 1 55.42 19.63
Sft 1 53.75 18.08
Sft 1 56.083 18.08
Sft 1 56 18.08
Sft 1 56.42 18.08
Sft 2 55.75 18.08
Sft 3 56 18.08

North side Sft 1 53.16 17.79


Sft 1 55.58 17.83
Sft 1 38.83 17.83
Boundary Wall (inside)
South side Sft 1 6.5 :
Sft 1 57 18.54
Sft 1 55.25 18.50
Sft 1 56 18.42
Sft 1 56.42 18.67
Sft 1 55.42 18.83
Sft 1 55 18.75
Sft 1 56.67 18.25
Sft 1 42.75 17.67

West side Sft 1 36.75 18.25


Sft 1 55.16 18.25
Sft 1 55.58 18.25
Sft 1 55.33 18.30
Sft 1 55.42 17.25
Sft 1 53.75 17.45
Sft 1 56.083 17.45
Sft 1 56 17.45
Sft 1 56.42 17.45
Sft 2 55.75 17.45
Sft 3 56 17.45

North side Sft 1 53.16 18.58


Sft 1 55.58 18.38
Sft 1 38.83 18.38
Columns insides plaster for projections
Sides (Single + Double) Sft 108 2 0.75 18.09
Top of wall Sft 1 1 1043.1 1
Top of columns (Single + Double) Sft 127 1 1 0.5
Coping (bottom offset) Sft 1 1 916.1 0.25

1 Front Wall Out and Inside 1 X 2 148.42 18.5


2 Front Wall Top Side 1 148.42 1

Page 5 of 20
Title of Project : : Misc Civil Works at Quetta

Work Order No # : 4110020110

ement Sheet For Bill No. :

Length Width Height


S.No Discription Unit Qty Sides Ft3
(Ft) (Ft) (Ft)
3 Front Wall Beam Bottom Side 1 148.42 0.25
4 School Side Wall Both Sides 1 X 2 592.58 18.5
5 School Side Wall Top Side 1 592.58 1
School Side Wall Beam Bottom Side
6 1 592.58 0.25
7 Back Side Wall Both Sides 1 X 2 441.33 18.5
8 Back Side Wall Top Side 1 441.33 1
9 1 441.33 0.25
Back Side Wall Beam Bottom Side
10 Column Sides Plaster 2 X 109 0.75 18.5
11 All Column Top Plaster 109 0.75 0.75
b Watch Tower
Back & Railway Side Corner Watch Tower no 01 Plaster
1
i Out Side Wall Plaster 1 7.5 21.5
ii Out Side Wall Plaster 3 7.5 9.5
iii Inside Wall Plaster 4 6 8
iv 1st and 2nd Roof Plaster 2 6 6
v 1st Roof Top Plaster 1 6 6
vi 1st Roof Beam Plaster Inside 4 6 1
vii Column Plaster 2 X 4 0.75 8.5
viii Tie Beam Sides Plaster 3 X 2 7.5 1.33
ix Tie Beam Top & Bottom 3 X 2 7.5 0.75
x Plinth Beam Plaster 3 7.5 2
xi Floor Plaster 1 7.5 6.75
xii Back Wall in Side Plaster 1 7.5 8.5
xiii Shed Plaster Sides 2 9 0.5
xiv 2 9 1.5
xv 2 10 0.5
xvi 1 7.5 1.5
2 Due to Changing Plaster
i wall both sides 2 7.5 21.5
ii wall both sides 2 X 2 6.5 8
iii 1st 2nd roof 2 6.5 6
iv 1st roof top 1 6.5 6
b
Watch Tower no 03 of School and Front Wall Coners
i Out Side Wall Plaster 2 7.5 21.5
ii Out Side Wall Plaster 2 7.5 9.6
iii Inside Wall Plaster 4 6 8
iv 1st and 2nd Roof Plaster 2 6 6
v 1st Roof Top Plaster 1 6 6
vi 1st Roof Beam Plaster Inside 2 6 1
vii Column Plaster 4 0.75 8.5
viii Tie Beam Sides Plaster 2 X 2 7.5 1.33
ix Tie Beam Top & Bottom 2 X 2 7.5 0.75
x Plinth Beam Plaster 2 7.5 2
xi Floor Plaster 1 7.5 6.75
xii Back Wall Inside Plaster 2 7.5 8.5
xiii Shed Plaster Sides 2 9 0.5
ix 1 9 1.5
x 2 10 0.5
xi 1 7.5 1.5

Page 6 of 20
Title of Project : : Misc Civil Works at Quetta

Work Order No # : 4110020110

ement Sheet For Bill No. :

Length Width Height


S.No Discription Unit Qty Sides Ft3
(Ft) (Ft) (Ft)
Watch Tower no 04 of Front and Railway Side Wall
c
Coners
i Both Side Wall Plaster 2 13.5 21.5
ii Both Side Wall Plaster 2 12.5 21.5
iii Both Wall Both Side Plaster 2 X 2 5.5 8
iv 1st and 2nd Roof Plaster 2 13.5 5.5
v 2 7 5.5
vi 1st Roof Top Plaster 1 13.5 5.5
vii 1 7 5.5
ix Shed Plaster 2 5.5 0.5
x 2 5.5 1.5
d
Watch Tower no 02 of Back and School Side Wall Coners
i Both Side Wall Plaster 2 13.5 8.5
ii Both Side Wall Plaster 2 12.5 8.5
iii Both Wall Both Side Plaster 2 X 2 5.5 8
iv 1st and 2nd Roof Plaster 2 13.5 5.5
v 2 7 5.5
vi 1st Roof Top Plaster 1 13.5 5.5
vii 1 7 5.5
viii Shed Plaster 2 5.5 0.5
ix 2 5.5 1.5
Total Plaster
1.15 ROOF WATER PROOFING
New watch tower no 01 back &
railway side corner tower 1 9 15

Old watch tower from back


and school side corner tower 02 1 5.5 13.5
1 5.5 7

New watch tower from school 1 9 9


and front wall corner no 03

Old watch tower no 04 from front 1 5.5 13.5


and near water tank 1 5.5 7
Total Water Proofing
1.17 P/A Weather Shield Paint
a Boundary Wall
1 Front Wall Out and Inside 1 X 2 148.42 18.5
2 Front Wall Top Side 1 148.42 1
3 Front Wall Beam Bottom Side 1 148.42 0.25
4 School Side Wall Both Sides 1 X 2 592.58 18.5
5 School Side Wall Top Side 1 592.58 1
6 1 592.58 0.25
School Side Wall Beam Bottom Side
7 Back Side Wall Both Sides 1 X 2 441.33 18.5
8 Back Side Wall Top Side 1 441.33 1
9 1 441.33 0.25
Back Side Wall Beam Bottom Side
10 Column Sides Paint 2 X 109 0.75 18.5
11 All Column Top Paint 109 0.75 0.75
b Watch Tower Paint
1 Back & Railway Side Corner
watch tower pain no 01
i Out Side Wall Paint 1 7.5 20
ii Out Side Wall Paint 3 7.5 9.5

Page 7 of 20
Title of Project : : Misc Civil Works at Quetta

Work Order No # : 4110020110

ement Sheet For Bill No. :

Length Width Height


S.No Discription Unit Qty Sides Ft3
(Ft) (Ft) (Ft)
iii Inside Wall Paint 4 0.5 8
iv 1st Roof Beam Paint Inside 2 6 1
v Column Paint 4 0.75 3.33
vi Tie Beam Sides Paint 2 X 2 7.5 1.33
vii Tie Beam Top & Bottom 2 X 2 7.5 0.75
viii Plinth Beam Paint 2 7.5 2
ix Back Wall Inside Paint 1 7.5 8.5
x Shed Panit Sides 2 9 0.5
xi 2 9 1.5
xii 2 10 0.5
xiii 1 7.5 1.5
2 Due to Changing Plaster
i Wall Out Side 1 7.5 20
ii Both Wall Outside 2 6.5 8
Watch Tower no 03 of School and Front Wall Corners
c

i Outside Wall Paint 2 7.5 20


ii Outside Wall Paint 2 7.5 9.5
iii Inside Wall Paint 2 6 8
iv 1st Roof Beam Paint Inside 2 6 1
v Column Paint 4 0.75 8.5
vi Tie Beam Sides Paint 2 X 2 7.5 1.33
vii Tie Beam Top & Bottom 2 X 2 7.5 0.75
viii Plinth Beam Paint 2 7.5 2
ix Back Wall Inside Paint 2 7.5 8.5
x Shed Paint Sides 2 9 0.5
xi 1 9 1.5
xii 2 10 0.5
xiii 1 7.5 1.5
3
Watch Tower 04 of Front and Railway Side Wall Corners
i Outside Wall Paint 1 13.5 20
ii Outside Wall Paint 1 12.5 20
iii Both Wall Outside Paint 2 5.5 8
iv Shed Paint 2 5.5 0.5
v 2 5.5 1.5
vi Wall Paint Inside 1 13.5 12
vii Wall Paint Inside 1 12.5 12
Watch Tower 02 of Back and School Side Wall Corners
4

i Outside Wall Paint 1 13.5 8.5


ii Outside Wall Paint 1 12.5 8.5
iii Both Wall Outside Paint 2 5.5 8
vi Shed Paint 2 5.5 0.5
v 2 5.5 1.5
Total P/A Weather Shield Pain

1.18
P/A Plastic Emulsion Watch Tower Paint
1
1-Back & Railway Side Corner Watch Tower Paint no 01
i Inside Wall Paint 2 6 8
ii 1st and 2nd Roof Paint 2 6 6
2 DUE TO CHANGING PAINT
i Wall Insides 1 7.5 20
ii Wall Insides 2 6.5 8

Page 8 of 20
Title of Project : : Misc Civil Works at Quetta

Work Order No # : 4110020110

ement Sheet For Bill No. :

Length Width Height


S.No Discription Unit Qty Sides Ft3
(Ft) (Ft) (Ft)
iii 1st 2nd Roof 2 6.5 6
Watch Tower of School and Front Wall Corners 03
3
i Inside Wall Paint 4 6 8
ii Inside Wall Paint 2 6 6
4
Watch Tower of Front and Railway Side Wall Corners 04
i Both Wall Insiede Paint 1 13.5 20
ii Both Wall Inside Paint 1 12.5 20
iii Both Wall Inside Paint 2 X 2 5.5 8
iv 1st and 2nd Roof Paint 2 13.5 5.5
v 2 7 5.5
5
Watch Tower of Back and School Side WallL Corners 02
i Both Wall Insiede Paint 1 13.5 8.5
ii Both Wall Inside Paint 1 12.5 8.5
iii Both Wall Inside Paint 2 X 2 5.5 8
iv 1st and 2nd Roof Paint 2 13.5 5.5
v 2 7 5.5
Total P/A Plastic Emulsion

Mtr Mtr Thick (mm) Unit Wight (Kg)

1.19 Installation of Steel Ladders


i Base Plate 4 0.25 0.25 20 7.85
ii Top Base Plate 2 0.61 0.25 8 7.85
iii C- Chanel 4 4.57 18.8
iv Railing Pipe 1-1/4'' Dia 28 0.761 3.39
v Top Rail Pipe 4 5.028 3.39
vi Step Chequred Plate 6mm 36 0.61 0.275 49.74
Total of Installation of S

1.22 Bitumen PB-4


1 Watch Tower
i For Footing Sides 4 X 2 10 1
ii For Footing Top 2 10 10
iii For Columns 4 4 4 3.17 0.75
2 Boundary Wall
Footing
i Single Footing -Sides 89 4 4 1.5
ii Single Footing -top 89 4 4 4

iv Double Footing -Sides 19 4 4.5 1.5


v Double Footing -top 19 4 4.5 4.5

Columns
i Single 89 1 5 1
ii Double 19 1 7 1

iv PCC 1:3:6 1 2 1100.07 2

vii 90 X 2 1 1
viii 90 X 2 1.5 1
3 For 1:3:6
i Front Wall With Watch Tower 2 163.5 2
ii 2 12.5 2
iii School Side Wall 2 592.58 2

Page 9 of 20
Title of Project : : Misc Civil Works at Quetta

Work Order No # : 4110020110

ement Sheet For Bill No. :

Length Width Height


S.No Discription Unit Qty Sides Ft3
(Ft) (Ft) (Ft)
iv Back Wall With Railway Side 2 441.33 2
v 2 7.5 2
Total Bitumen PB-4

1.23 Sold Flush Door


Watch Tower 2 3 7.17
Total Sold Flush Door

1.24 Steel Chokat


Watch Tower 2 3 7.17 7.17
Total Steel Chokat

1.25 Installtion of Barbed Wire


i South side RM 1 421.01
ii West Side RM 1 579.74
iii North Side RM 1 147.57

Mtr

1.26 Installtion of Angle Iron 2''x2''x1/4'' Wt:(kg/ft) 1


South side Kg 44 4.67 1
West Side Kg 62 4.67 1
North Side Kg 15 4.67 1
Kg

1.30 Excavation for Cables


1.31 Laying of Cable
1.32 Back Filling for Cable
1.33 Laying of Cable
1.34 Installtion of G.I Pipe
1.35 Installtion of DB
1.36 Wiring For 5A 3 Pin Socket
1.37 P/I 20 A TP MCB 5KA
1.38 Wiring For Single Light
1.39 Wiring From Distibution Board
1.4 Bracket Fan 18'' Dia
1.41 Light
1.42 Energy Savers

Page 10 of 20
mpany Limited
Services
Quetta

Date : 25.03.2015

Date :

Nos /
Ft2 Ft M3 M2 M Kg
Job

5007.86 465.41

6588.923 612.35

1901.02 176.67

51 4.74
36 3.35
9 0.84
19 1.77
29.25 2.72

84 7.81
75 6.97
81 7.53
38 3.53

84 7.81
38 3.53
Dismantling 1305.02

27.407
3.291

2.867

292.907
76.637

0.425
avtion 403.535

0.822
14.868

5.507
43.136

23.562
166.72

Page 11 of 20
Quetta

Date : 25.03.2015

Date :

Nos /
Ft2 Ft M3 M2 M Kg
Job
k Filling 254.610

4.172
17.850
uction 22.021
k Filling 254.610
uction 22.021
k Filling 232.588

3.7266

h Filling 3.7266

3.4258
7.1893
27.4772
1.5926
e Soling 39.6849

2.261

0.437
0.215

0.219
0.215
4.745
18.135
0.217
26.44

17.3383
22.8055
6.575

16.747
0.255
0.541
64.2619

60.476
17.598

113.264

21.275

Page 12 of 20
Quetta

Date : 25.03.2015

Date :

Nos /
Ft2 Ft M3 M2 M Kg
Job
27.711
8.219

12.526
16.626
4.103

5.567
7.389
1.824

0.828

6.042
3.016
2.711
2.039
1.593
1.338
1.147
1.019
0.541

0.680
0.377
0.340
0.552

0.255
0.690
0.828

0.807
0.573
0.531
1.051
0.584
1.207
0.740

0.064
0.807
0.573
0.531
1.051
0.584
1.207
0.740
0.297

Page 13 of 20
Quetta

Date : 25.03.2015

Date :

Nos /
Ft2 Ft M3 M2 M Kg
Job
331.919

300.57
391.49 36.38
116.12 10.79

4.5 0.42

9 0.84
otal DPC 48.43

58.5 5.44
22.5 2.09

29.25 2.72
20.25 1.88
inth Protection 12.13

111.314
147.75
36.46

3.42
3.12
1.31

1.93
2.68

2.12
0.82

3.42
3.12
1.31

3.87
1.78

0.27
0.32
0.18
325.204

Page 14 of 20
Quetta

Date : 25.03.2015

Date :

Nos /
Ft2 Ft M3 M2 M Kg
Job

117.00
1054.50
1012.73
1017.24
1079.03
1050.76
1022.18
1015.33
740.86

644.60
967.51
974.87
1042.14
1087.62
971.80
1013.98
1012.48
1020.07
2015.92
3037.44

945.72
990.99
692.34

#VALUE!
1056.87
1022.21
1031.32
1053.36
1043.56
1031.25
1034.23
755.39

670.71
1006.70
1014.37
1012.72
956.08
937.76
978.46
977.01
984.34
1945.30
2931.04

987.71
1021.37
713.56

1465.18
1043.07
63.50
229.02

5491.54 510.37
148.42 13.79

Page 15 of 20
Quetta

Date : 25.03.2015

Date :

Nos /
Ft2 Ft M3 M2 M Kg
Job
37.105 3.45
21925.46 2037.68
592.58 55.07

148.145 13.77
16329.21 1517.58
441.33 41.02
110.33 10.25
3024.75 281.11
61.3125 5.70

161.25 14.99
213.75 19.87
192 17.84
72 6.69
36 3.35
24 2.23
51 4.74
59.85 5.56
33.75 3.14
45 4.18
50.625 4.70
63.75 5.92
9 0.84
27 2.51
10 0.93
11.25 1.05

322.5 29.97
208 19.33
78 7.25
39 3.62

322.5 29.97
144 13.38
192 17.84
72 6.69
36 3.35
12 1.12
25.5 2.37
39.9 3.71
22.5 2.09
30 2.79
50.625 4.70
127.5 11.85
9 0.84
13.5 1.25
10 0.93
11.25 1.05

Page 16 of 20
Quetta

Date : 25.03.2015

Date :

Nos /
Ft2 Ft M3 M2 M Kg
Job

580.5 53.95
537.5 49.95
176 16.36
148.5 13.80
77 7.16
74.25 6.90
38.5 3.58
5.5 0.51
16.5 1.53

229.5 21.33
212.5 19.75
176 16.36
148.5 13.80
77 7.16
74.25 6.90
38.5 3.58
5.5 0.51
16.5 1.53
tal Plaster 4997.09

135 12.55
0.00
0.00
74.25 6.90
38.5 3.58
0.00
81 7.53
0.00
0.00
74.25 6.90
38.5 3.58
Water Proofing 41.03

5491.54 510.37
148.42 13.79
37.105 3.45
21925.46 2037.68
592.58 55.07
148.145 13.77
16329.21 1517.58
441.33 41.02
110.3325 10.25
3024.75 281.11
61.3125 5.70

150 13.94
213.75 19.87

Page 17 of 20
Quetta

Date : 25.03.2015

Date :

Nos /
Ft2 Ft M3 M2 M Kg
Job
16 1.49
12 1.12
9.99 0.93
39.9 3.71
22.5 2.09
30 2.79
63.75 5.92
9 0.84
27 2.51
10 0.93
11.25 1.05

150 13.94
104 9.67

300 27.88
142.5 13.24
96 8.92
12 1.12
25.5 2.37
39.9 3.71
22.5 2.09
30 2.79
127.5 11.85
9 0.84
13.5 1.25
10 0.93
11.25 1.05

270 25.09
250 23.23
88 8.18
5.5 0.51
16.5 1.53
162 15.06
150 13.94

114.75 10.66
106.25 9.87
88 8.18
5.5 0.51
16.5 1.53
eather Shield Paint 4766.91

96 8.92
72 6.69

150 13.94
104 9.67

Page 18 of 20
Quetta

Date : 25.03.2015

Date :

Nos /
Ft2 Ft M3 M2 M Kg
Job
78 7.25

192 17.84
72 6.69

270 25.09
250 23.23
176 16.36
148.5 13.80
77 7.16

114.75 10.66
106.25 9.87
176 16.36
148.5 13.80
77 7.16
Plastic Emulsion 214.50

39.25
19.15
343.66
72.23
68.18
300.38
of Installation of Steel Ladders 842.86

80 7.43
200 18.59
152.16 14.14

2136.00 198.51
5696.00 529.37

513.00 47.68
1539.00 143.03

445.00
133.00

4400.29

180 16.73
270 25.09

654 60.78
50 4.65
2370.32 220.29

Page 19 of 20
Quetta

Date : 25.03.2015

Date :

Nos /
Ft2 Ft M3 M2 M Kg
Job
1765.32 164.06
30 2.79
Bitumen PB-4 1453.14

43.02 4.00
old Flush Door 4.00

34.7 10.57
Total Steel Chokat 10.57

421 128.32
580 176.70
148 44.98
Total 1148 349.9918

205
290
70.1
Total 565

149.8
400
149.8
20
105.2
2
3
3
10
6
2
2
2