BILL OF ENGINEERING MEASUREMENT AND EVALUATION FOR FLOOD CONTROL AND SWAMP UPGRADING/ ROAD

IMPROVEMENT WORKS , AT IBBI ROAD GRA WUKARI, TARABA STATE.

BILL No. 1 - PRELIMINARY AND GENERAL WORKS


No ITEM DESCRIPTION QTY UNIT RATE(N) AMOUNT(N)

Provide for the cost of progress photograph


1.1 1 P.S -
as directed by the Engineer.

1.2 Allow for Geotechnical 1 P.S -


investigation/survey,soil and and concrete
tests as directed by the Engineer.
Allow for Survey works, labour, equipment
1.3 and stationaery for the Engineer's 1 P.S -
Representative.
Provide office accommodation facilities with
1.4 maintenance for the Engineer's 1 P.S -
representative
Provide , furnish and maintain living
1.5 accommodation for the Engineer's 1 P.S -
representative.
Allow for payment of allowances to
1.6 Engineers representatives support staff as 1 P.S -
may be determine by the client.
Allow for mobilization and demobilization of
1.7 equipment , materials and human 1 P.S -
resources.
Allow for site meeting ,transportation and
1.8 1 P.S -
monitoring.
Allow for procurement Due diligence
1.9 1 P.S -
surpevision.
Provide for transport expenses / logistic of
1.10 the Engineer's representative on the project 1 P.S -
as directed.

TILT CONSTRUCTION COMPANY LTD.


1.11 Allow for Engineer's Training 1 P.S -

1.12 Allow for Handing over and commissioning 1 P.S -


in consultation with the client.
TOTAL FOR BILL NO 1 CARRIED TO SUMMARY -

TILT CONSTRUCTION COMPANY LTD.


BILL NO 2 : SITE CLEARING AND
EARTHWORKS

No DESCRIPTION OF WORKS QTY UNIT RATE(N) AMOUNT(N)

Provide and erect project Notice board as


2.1 2 Nrs -
directed by the Engineer.
Fabrication and painting of project board
2 nrs -
with installation

2.2 1 P.S -
Allow for access roads within the project
site.
grader hire for 2 days with 100 liters of
diesel per day 2 days -

Clear all bushes, grasses, trees and other


2.3 rubbish at work site and remove to spoil at 39800 sqm -
approve locations.

employ manual labour 8nrs at 2500 naira


per day for 2 weeks but this just an 2 weeks -
assumption

2.4 Cut and grub site of all trees excceeding 12 Nrs -


300mm in girth and dispose to spoil.

1 days -
hire labour with chainsaw per day
Provide from approved borrow pits
homogenous fill materials (laterite) for gully
2.5 reclmation.filling and compact in layers of 9880 cub.m -
150mm thickess including levelling and
shaping to specification.
tonnage of laterites 7,904.99 tons

TILT CONSTRUCTION COMPANY LTD.


hire trailers for haulage of the laterite at 317.00 nrs -
25tons truck

hire excavator + diesel for the borrow pit per 18.00 days -
day out put of excavator for 8hrs = 500tons

hire motor grader +diesel for spreading the 24.00 days -


laterite in layers

hire viratory roller 12tons + diesel 24.00 days -

hire sheep foot roller forborrow


compaction 24.00 days -
provide from approved pits of fill
homogenous fill materials and use for road
embankment as specified.Filling and
2.6 compaction in layers of 25cm thickness -
including levelling and shaping to
specification. 10260 cub.m

tonnage of materials 8,209.03 tons

numbers of trucks @ 25tons 329.00 trucks - -

hire grader + diesel 28.00 days - -

Provide ,spread,shape and compact to100%


2.7 WASC approved wet mix stone base as base 9016 cub.m -
course ,thickness not exceeding 150mm on
carriage way.

tonnage of material 7,214.00 tons -

hualage to site @30tons 241 trucks -


hire motor grader +diesel for spreading the
25.00 days - -
stonebase in layers

TILT CONSTRUCTION COMPANY LTD.


25.00 days - -
hire compacting roller 12 tons
General excavation on any material except
2.8 rock, to any depth and shape as may be 4205 cub.m -
required.a
Excavate for drains, detention pits,
2.9 chambers and outlet structures to formation 1806 cub.m -
levels.

tonnage of spoil 1,376.17 tons

haulage of excavated materials 30 trucks 46.00 trucks - -

85.00 days - -
hire excavator + diesel
Excavate for Box culverts, detention pits,
2.1 chambers and outlet structures to formation -
levels. 496 cub.m
tonnage of spoil 377.95 tons

haulage of excavated materials 30 trucks 13.00 trucks - -

10.00 days - -
hire of excavator + diesel per day

2.11 Backfilling to all structure including drains, 3458 cub.m -


chambers .

12 days - -
hire wheelloader CAT955 or less

2.12 Provide for dewatering from the construction 1 P.S -


right of way.

TILT CONSTRUCTION COMPANY LTD.


hire industrial water pump 22 days -

TOTAL FOR BILL NO 2 ; CARRIED TO SUMMARY


-

TILT CONSTRUCTION COMPANY LTD.


BILL NO 3 : CULVERTS AND DRAIN
( CONCRETE WORKS)

DESCRIPTION OF WORKS QTY UNIT RATE(N)


ITEM
AMOUNT(N)
NO

Provide and place weak concrete grade ( u-


1500) for blinding to foundation of
3.01 structures including drains , chambers and 147 cub.m -
drop spillways (thickness not less than
50mm) 1:3:6 mix ratio

cement 515 bags -

sand 34 tons -

granite 68 tons -

labour+machines(mixer and vibrator) for 147 cu.m -


placing and mixing of concrete

surveyor for setting the blinding levels and sum 50,000.00


drainage alignments

Provide and place reinforced oncrete grade


3.02 638 cub.m -
(U-2250) to storm water drains , outlet
structures and chambers . 1:2:4 mix ratio

3194 bags - -
cement

140 tons - -
sand

280 tons - -
granite

TILT CONSTRUCTION COMPANY LTD.


labour+machines(mixer and vibrator) for 638 cu.m -
placing and mixing of concrete
Provide and place reinforced oncrete grade
3.03 (U-2250) to Box culverts , outlet structures . 219 cub.m -
1:2:4 mix ratio

cement 1097 bags - -

sharp sand 48 tons - -

granite 96 tons - -

labour+machines(mixer and vibrator) for 219 cu.m - -


placing and mixing of concrete
Provide , cut , shape and place ,high tensile
steel reinfocements ( 10 -12mm) in
3.04 reinforced concrete drain structural 68.87 Tons -
elements as shown in the drawings or as
directed by the Engineer.

68.87 tons -
labour for tying and fixing of rebar cage
Provide , cut , shape and place ,high tensile
steel reinfocements ( 10 -16mm) in
3.05 reinforced concrete box culvert structural 19.63 Tons - -
elements as shown in the drawings or as
directed by the Engineer.

19.63 tons - -
labour for tying and fixing of rebar cage

3.06 143 cub.m - -


Provide and place concrete grade (U-2250)
for access slab as directed .

TILT CONSTRUCTION COMPANY LTD.


716 bags -
cement

32 tons - -
sharp sand

64 tons - -
granite
labour+machines(mixer and vibrator) for 143 cu.m - -
placing and mixing of concrete

17.875 tons -
reinfolrcement

17.875 tons - -
labour for tying and fixing of rebar cage

sum 300,000.00
labour for formworks for slab

Provide and place 300mm stone masonry


3.07 ( pitched) laid in cement mortar (1:3) mix, at 288 sq.m -
the channels of embankments to achieve
slope protection as directed.

3.08 Fair face finish formwork to side of reiforced 2806 sq.m -


concrete grade ( U-2250) generally

2806 sq.m -
labour for formworks for side of drains

TILT CONSTRUCTION COMPANY LTD.


TOTAL FOR BILL NO 3 CARRIED TO SUMMARY
350,000.00

BILL NO 4 : ROAD CONSTRUCTION AND REHABILITATION

PAVEMENT AND SURFACING


DESCRIPTION OF WORKS QTY UNIT RATE(N)
ITEM
AMOUNT(N)
NO
Provide and apply prime coat on carriage-
way using MC-1 cutback bitumen @0.9
5.1 litres/sq.m including blinding with sand or 29600 Sq.m -
quarry dust.

Provide and spread first coat surface


5.2 dressing using STV 125 cutback bitumen at 29600 Sq.m -
the rate of 1.3 litres/sqm and 18mm single
crushed rock chippings on carriageway.

TILT CONSTRUCTION COMPANY LTD.


Provide and lay asphaltic concrete wearing
5.3 course to a compacted thickness of 50mm as 29600 Sq.m -
over lay including tack coat.

2960 tons -
tonnage of asphalt

2960 tons -
haulage of asphalt
hire paver, double drum roller and 12 days -
pneumatic roller

12 days -
labour to lay the asphalt

5.4 Provide and lay lean asphaltic concrete 6580 Sq.m -


wearing course to a compacted thickness of
15mm as over lay including tack coat.

tonnage of asphalt 197.4 tons -

haulage of asphalt 197.4 tons - -

hire paver, double drum roller and


pneumatic roller 3 days - -

labour to lay the asphalt 3 days - -


TOTAL FOR BILL NO 4; CARRIED TO
-
SUMMARY

BILL NO 5 : AGRONOMICAL MEASURESS & SOIL CONTROL

TILT CONSTRUCTION COMPANY LTD.


6.1 Cover cleared surfaces and reshape gully 1800 sq.m -
banks with top soil , manure and grassing.
Construct wicker work fences around
6.2 shoulders of concrete structures and other 2400 sq.m -
areas.

Allow for carrying out Environmental impact


6.3 assessement(EIA) for the project by an 1 PS 21,000,000.00
indepent consultant appointed by the
Engineer.

TOTAL FOR BILL NO 5; CARRIED TO


SUMMARY 21,000,000.00

TILT CONSTRUCTION COMPANY LTD.


BILL OF ENGINEERING MEASUREMENT AND EVALUATION FOR FLOOD CONTROL AND ROAD IMPROVEMENTWORKS
AT IBBI ROAD WUKARI GRA ,TARABA STATE.

AMOUNT(N)
SUMMARY
BILL 1-PRELIMINARIES AND GENERAL
-
WORKS
BILL 2-SITE CLEARING AND
EARTHWORKS -

350,000.00
BILL 3-CULVERTS AND DRAINS.

BILL 4-ROAD CONSTRUCTION AND -


REHABILITATION.

BILL 5-AGRONOMIC MEASURES & SOIL


CONSERVATION

SUB TOTAL 1 350,000.00

ADD CONTIGENCY 17,500.00

ADD 2.5% ADMIN CHARGES

SUB TOTAL 2 367,500.00

ADD 5% VAT

TILT CONSTRUCTION COMPANY LTD.


TOTAL CONTRACT SUM 367,500.00

TILT CONSTRUCTION COMPANY LTD.