You are on page 1of 12

PT.

TRANS-PACIFIC PETROCHEMICAL INDOTAMA

CTG FIELD LOGSHEET FOR MAJOR OVERHAUL


CTG NO : Normal 56 76,71%
SAFE OPER ACTUAL Alarm 17 23,29%
No DESCRIPTION TAG NO NORMAL ACTUAL (BEFORE MI) REMARK
WINDOW (AFTER MI)
Total 73
WAKTU PENGGAMBILAN DATA (tanggal & jam)
Outside Enclosure (west side)
1 Fuel Gas Duplex Filter F-1X04 Press. Differential Filter (Kg/cm2) PDG-1X24 1 0,04 1
2 Fuel Gas Supply Press Fuel Gas from FGBC Nitrogen Press. (Kg/cm2) PG-1Z28 17,8 16 - 18.2
18,7 1
3 Nitrogen Purge Line Nitrogen Press. (Bar) PG-1X35 140 75 - 145 105 1
2
4 Fuel Gas Supply Press. After Strainer (Kg/cm ) PG-1X28 16,5 16 - 18.2 17,2 1
5 Fuel Gas Supply Press. After FCV-1X03/SRV (Kg/cm2) PG-1X30 15 15 - 18.2 14 1
6 Fuel Gas Supply Press. After FCV-1X04/GCV (Kg/cm2) PG-1X31 8 6 1
7 Cartridge Filter Fuel Gas A of B Service Hour A or B A 1
8 Lighting Area Condition OKE 1
Lube Oil System
1 Main LO Pump Press. Discharge Pump (Kg/cm2) PG-1X01 7,5 7.4 - 7.8 7,2 1
2 Emergency LO Pump Press. Discharge Pump (Kg/cm2) PG-1X05 2 1.9 - 2.5 0 1
2
3 Aux LO Pump press. Discharge pump (Kg/cm ) PG-1X04 7,5 7.0 - 8.0 0 1
4 LO Tank Press. Differential (Kg/cm2) PDG-1X06 <-90 < -100 <-100 1
2
5 Hydraulic Oil Press. After Lube Oil Duplex Filter (Kg/cm ) PG-1X17 88 80 - 92 78 1
6 Lube Oil Duplex Filter Diff. Press. Lube Oil Filter (Kg/cm2) PDG-1X07 < 0.3 < 1.5 0,42 1
7 Lube Oil Cartridge Filter Service Cartridge A or B A/B B 1
2
8 Hydraulic Oil Duplex Filter Diff. Press Hyd. Oil filter (Kg/cm ) PDG-1X14 < 0.5 < 5.5 0,6 1
9 Lube Oil Tank Lube Oil Tank level (%) LG-1X01 80 60 - 90 50 1
10 Filter Lube Oil Service Hour A/B B 1

11 Vibration, Noise, Leaks & Abnormalities Yes/No


NO --> NOISE 102 DB (DALAM 1 RUANGAN) 1
Fuel Oil System
2
1 Atomizing Air to Manifold Press. Atom Air to Manifold (Kg/cm ) PG-1X49 1,5 5,9 1
2 Fuel Oil Duplex Filter Press. Fuel Oil After Filter (Kg/cm2) PG-1X14 4,8 4.2 - 6.0 5,7 1
2
3 Fuel oil simplex filter Diff. press. Fuel oil (Kg/cm ) PDG-1X44 < 0.5 < 1.5 0 1
4 Drain CWR/CWS to Atomizing Check Dirty / Clean OK 1
5 Open Drain Air Separator for Few Minute at MP 40 Point V-1x04 OK 1
6 Fuel Oil Divider PG-1X45
Liquid Fuel Press. Divider (Psi) 1 > 120 > 100 255 1
Liquid Fuel Press. Divider (Psi) 2 > 120 > 100 255 1
Liquid Fuel Press. Divider (Psi) 3 > 120 > 100 255 1
Liquid Fuel Press. Divider (Psi) 4 > 120 > 100 260 1
Liquid Fuel Press. Divider (Psi) 5 > 120 > 100 250 1
Liquid Fuel Press. Divider (Psi) 6 > 120 > 100 255 1
Liquid Fuel Press. Divider (Psi) 7 > 120 > 100 255 1
Liquid Fuel Press. Divider (Psi) 8 > 120 > 100 255 1
Liquid Fuel Press. Divider (Psi) 9 > 120 > 100 255 1
Liquid Fuel Press. Divider (Psi) 10 > 120 > 100 255 1
Leaks & Abnormalities, Noise Yes/No 102 DB (No Leak) 1
7 Fuel Oil Starting Diesel Tank Level (%) LG-1X10 80 50 - 90 70% 1
8 Aux. Compressor Lube Oil Level (%) 80 60 - 90 90% 1
Leaks & Abnormalities, Noise Yes/No NO --> NOISE 102 DB (DALAM 1 RUANGAN) 1
Nitrogen Bottle Area
1 N2 Bottle Supply to Purge Press. Outlet (Kg/cm2) PG-1X33 105 1

Site Office:
Jl. Tg. Awar-awar, Ds. Remen Tasikharjo, Jenu
PO BOX 05-Tuban 62352, Jawa Timur-Indonesia
Phone : (62) (0356) 491031 (Hunting)
Fax : (62) (0356) 491030 page 1 of 13
PT. TRANS-PACIFIC PETROCHEMICAL INDOTAMA

CTG FIELD LOGSHEET FOR MAJOR OVERHAUL


CTG NO : Normal 56 76,71%
SAFE OPER ACTUAL Alarm 17 23,29%
No DESCRIPTION TAG NO NORMAL ACTUAL (BEFORE MI) REMARK
WINDOW (AFTER MI)
Total 73
2
2 N2 Bottle Supply Press. After Block Valve (Kg/cm ) PG-1X35 BROKEN 1
3 N2 Purge to Line After FCV 1X01/V/pr45 (Kg/cm2) PG-1X37 0 1
Leaks & Abnormalities Yes/No NO 1
Filter Intake House
1 Plant Air to Air Pulse Jet Press. (Kg/cm2) PG-1X56 7 4.0 - 8.5 CLOSE 1
2 Ventilation Fan K-1X06 A Condition Run or Not (on / off) 88BA-1 RUN 1
3 Ventilation Fan K-1X06 A Condition Run or Not (on / off) 88BA-2 STOP 1
4 Filter House Ventilation Condition Clean clean CLEAN 1
5 Intake Filter Lighting On/Off OFF 1
Oil Vapor Separator
1 Oil Vapor Separator Inlet Press. (mmWC) PG-1X21 40 35 - 60 22 1
Outlet Press. (mmWC) PG-1X22 -300 -380 1
Upper Tank Level (%) 0 1
2 Opening Valve Inlet Butterfly v/v (%) 100 1
3 Oil Vapor Large/Little LITTLE 1
Lube Oil Cooler
1 Lube Oil Fan Cooler & Motor K-1X01 A Condition Run or Not (on / off) 88FC-1
2 Lube Oil Fan Cooler & Motor K-1X01 B Condition Run or Not (on / off) 88FC-2
3 Lube Oil Fan Cooler & Motor K-1X01 C Condition Run or Not (on / off) 88FC-3
4 Temp. Control Valve Position TCV 1X07 (%) VTR-1 57,5 1
Abnormalities, Leak Yes/No NO 1
Vibration Yes/No NO 1
Generator Air cooler
1 Generator Fan Cooler & Motor K-1X07 A Condition Run or Not (on / off) 88BG-1 ON 1
2 Generator Fan Cooler & Motor K-1X07 B Condition Run or Not (on / off) 88BG-2 ON 1
3 Generator Fan Cooler & Motor K-1X07 C Condition Run or Not (on / off) 88BG-3 ON 1
4 Generator Fan Cooler & Motor K-1X07 D Condition Run or Not (on / off) 88BG-4 ON 1
Abnormalities, Vibration Yes/No NO 1
PECC
1 Battery Output Voltage Rectifier (P3) DCP-102 130 100 - 135 130 1
Battery Voltage (P9) 130 100 - 135 127 1
2 Service Rectifier Output Voltage (P7) RS 112 100 - 120 113 1
Incoming Current (P2) 24 23.5 - 27 0 1
3 Heater Transformer Breaker XFMR-001 on/off on ON 1
4 HVAC Running Unit A / B B RUN, A OFF 1
0 0
Temperature (Deg C) 22 20 - 24 A; 26,6 C, B;26,2 A 26,6 C 1
5 Excitation Running Unit A / B A RUN 1
6 Fire Gas Analyzer AE- 1101 A / B / C (%) < 10 < 20 0/6/0 1
AE- 1102 A / B / C (%) < 10 < 20 0/0/0 1
Transformer 37 KV
1 Oil Temperature (Deg C) < 80 60 - 85 49 1
2 Winding Temperature (Deg C) < 90 60 - 95 50 1
Abnormalities, Vibration Yes/No NO 1
Lube Oil Cooler Valid Only for 821-G-102
1 Temp. Control Valve Position TCV 1X08 (%) VTR-2
Abnormalities
Vibration

Site Office:
Jl. Tg. Awar-awar, Ds. Remen Tasikharjo, Jenu
PO BOX 05-Tuban 62352, Jawa Timur-Indonesia
Phone : (62) (0356) 491031 (Hunting)
Fax : (62) (0356) 491030 page 2 of 13
PT. TRANS-PACIFIC PETROCHEMICAL INDOTAMA

CTG FIELD LOGSHEET FOR MAJOR OVERHAUL


CTG NO : Normal 56 76,71%
SAFE OPER ACTUAL Alarm 17 23,29%
No DESCRIPTION TAG NO NORMAL ACTUAL (BEFORE MI) REMARK
WINDOW (AFTER MI)
Total 73
2 Lamp Condition On or Off
3 Bank Selector Switch A or B
4 F & G System Position Auto / Inhibit / Discharge
5 Abnormalities, Vibration Yes/No

Site Office:
Jl. Tg. Awar-awar, Ds. Remen Tasikharjo, Jenu
PO BOX 05-Tuban 62352, Jawa Timur-Indonesia
Phone : (62) (0356) 491031 (Hunting)
Fax : (62) (0356) 491030 page 3 of 13
PT. TRANS-PACIFIC PETROCHEMICAL INDOTAMA

CTG FIELD LOGSHEET FOR MAJOR OVERHAUL


CTG NO : Normal 56 76,71%
SAFE OPER ACTUAL Alarm 17 23,29%
No DESCRIPTION TAG NO NORMAL ACTUAL (BEFORE MI) REMARK
WINDOW (AFTER MI)
Total 73
Description :
Notes and Justification for Abnormalities
Conclusions & Solutions :

NAMA TANDA TANGAN

TPPI OPERATOR
LOGGED BY
PJBS

TPPI
CHECKED BY
PJBS

TPPI
APPROVED BY
PJBS

Site Office:
Jl. Tg. Awar-awar, Ds. Remen Tasikharjo, Jenu
PO BOX 05-Tuban 62352, Jawa Timur-Indonesia
Phone : (62) (0356) 491031 (Hunting)
Fax : (62) (0356) 491030 page 4 of 13
PT. TRANS-PACIFIC PETROCHEMICAL INDOTAMA

CTG DCS LOGSHEET FOR MAJOR OVERHAUL


CTG NO :

SAFE OPER ACTUAL ACTUAL


No DESCRIPTION TAG NO REMARK
WINDOW (BEFORE MI) (AFTER MI)

WAKTU PENGGAMBILAN DATA (tanggal & jam)


TURBINE BEARING MAX. TEMP.
1 Journal Bearing # 1 (E) ( oC ) TE-1113 < 107 84
2 Journal Bearing # 1 (F) ( oC ) TE-1123 < 107 70
3 Journal Bearing # 1 (G) ( oC ) TE-1105 < 107 69
4 Journal Bearing # 2 (H) ( oC ) TE-1118 < 107 76
5 Journal Bearing # 2 (I) ( oC ) TE-1120 < 107 -17
6 Journal Bearing # 2 (J) ( oC ) TE-1106 < 107 86
7 Thrust Bearing (A) ( oC ) TE-1111 < 115 -17
8 Thrust Bearing (B) ( oC ) TE-1124 < 115 74
9 Thrust Bearing (C) ( oC ) TE-1112 A < 115 -17
10 Thrust Bearing (D) ( oC ) TE-1104 < 115 61
LOAD GEAR BEARING MAX. TEMP.
1 HS Shaft Journal Bearing DE (A) ( oC ) TE-1135A/B <120 80,6
2 HS Shaft Journal Bearing NDE (B) ( oC ) TE-1136A/B <120 80,7
3 HS Shaft thrust Bearing (E) ( oC ) TE-1149A/B 61,9
4 HS Shaft thrust Bearing (F) ( oC ) TE-1137A/B 68
5 LS Shaft Journal Bearing NDE (C) ( oC ) TE-1139A/B <120 82,1
6 LS Shaft Journal Bearing DE (D) ( oC ) TE-1138A/B <120 82,4
GENERATOR BEARING MAX. TEMP.
1 Bearing DE ( G) ( oC ) TE-1144A/B < 95 65,6
2 Bearing DE ( H) ( oC ) TE-1148A/B < 95 70
TURBINE BEARING MAX. VIBRATION
1 Turbine Bearing (C) ( µm ) XT-1101X < 126 77
2 Turbine Bearing (D) ( µm ) XT-1101Y < 126 22
Site Office:
Jl. Tg. Awar-awar, Ds. Remen Tasikharjo, Jenu
PO BOX 05-Tuban 62352, Jawa Timur-Indonesia
Phone : (62) (0356) 491031 (Hunting)
Fax : (62) (0356) 491030 page 5 of 12
PT. TRANS-PACIFIC PETROCHEMICAL INDOTAMA

CTG DCS LOGSHEET FOR MAJOR OVERHAUL


CTG NO :

SAFE OPER ACTUAL ACTUAL


No DESCRIPTION TAG NO REMARK
WINDOW (BEFORE MI) (AFTER MI)

3 Turbine Bearing (E) ( µm ) XT-1102X < 126 49


4 Turbine Bearing (F) ( µm ) XT-1102Y < 126 0
5 Seismic Vibration Turbine #1 (mm/s ) VE-1103A < 12.7 4,05
6 Seismic Vibration Turbine #1 (mm/s ) VE-1103B < 12.7 4,18
7 Seismic Vibration Turbine #2 (mm/s ) VE-1104A < 12.7 4,17
8 Seismic Vibration Turbine #2 (mm/s ) VE-1104B < 12.7 5,43
9 Thrust Axial Position (A) (mm) ZT-1105A < 0.5 0,07
10 Thrust Axial Position (B) (mm) ZT-1105B < 0.5 0,04
LOAD GEAR BRG MAX. VIBRATION
1 HS Journal Brg Load Gear (A) ( µm ) XT-1105X < 92 15
2 HS Journal Brg Load Gear (B) ( µm ) XT-1105Y < 92 25
3 HS Journal Brg Load Gear (C) ( µm ) XT-1106X < 92 15
4 HS Journal Brg Load Gear (D) ( µm ) XT-1106Y < 92 9
5 LS Journal Brg Load Gear (E) ( µm ) XT-1107X < 92 12
6 LS Journal Brg Load Gear (F) ( µm ) XT-1107Y < 92 11
7 LS Journal Brg Load Gear (G) ( µm ) XT-1108X < 92 18
8 LS Journal Brg Load Gear (H) ( µm ) XT-1108Y < 92 18
9 HS Thrust Axial Position (K) (mm) ZT-1116A < 0.4 -0,13
10 HS Thrust Axial Position (L) (mm) ZT-1116B < 0.4 -0,13
11 Seismic Load Gear (I) (g) VE-1111 1,54
12 Seismic Load Gear (J) (g) VE-1112 2
GENERATOR BEARING MAX. VIBRATION
1 Seismic Bearing Gen. #1(BB10) ( mm/s ) VE-1109 < 4.5 1,26
2 Seismic Bearing Gen. #2(BB12) ( mm/s ) VE-1110 < 4.5 0,72

Site Office:
Jl. Tg. Awar-awar, Ds. Remen Tasikharjo, Jenu
PO BOX 05-Tuban 62352, Jawa Timur-Indonesia
Phone : (62) (0356) 491031 (Hunting)
Fax : (62) (0356) 491030 page 6 of 12
PT. TRANS-PACIFIC PETROCHEMICAL INDOTAMA

CTG DCS LOGSHEET FOR MAJOR OVERHAUL


CTG NO :

SAFE OPER ACTUAL ACTUAL


No DESCRIPTION TAG NO REMARK
WINDOW (BEFORE MI) (AFTER MI)

1 TTXD1-1 ( oC ) TE-1119A < 560 390


2 TTXD1-2 ( oC ) TE-1119B < 560 388
3 TTXD1-3 ( oC ) TE-1119C < 560 381
4 TTXD1-4 ( oC ) TE-1119D < 560 386
5 TTXD1-5 ( oC ) TE-1119E < 560 396
6 TTXD1-6 ( oC ) TE-1119F < 560 401
7 TTXD1-7 ( oC ) TE-1119G < 560 394
8 TTXD1-8 ( oC ) TE-1119H < 560 392
9 TTXD1-9 ( oC ) TE-1119I < 560 389
10 TTXD1-10 ( oC ) TE-1119J < 560 388
11 TTXD1-11 ( oC ) TE-1119K < 560 380
12 TTXD1-12 ( oC ) TE-1119L < 560 380
13 TTXD1-13 ( oC ) TE-1119M < 560 391
14 Exhaust Spread ( oC )
WHEEL SPACE TEMPERATURE
1 1st Stage Forward Outer ( oC ) TE-1116A 373
2 1st Stage Forward Outer ( oC ) TE-1116B 369
3 1st Stage After Outer ( oC ) TE-1122A 308
4 1st Stage After Outer ( oC ) TE-1122B 324
5 2nd Stage Forward Outer ( oC ) TE-1117A 323
6 2nd Stage Forward Outer ( oC ) TE-1117B 325
7 2nd Stage After Outer ( oC ) TE-1121A 316
8 2nd Stage After Outer ( oC ) TE-1121B 304
GENERATOR
Site Office:
Jl. Tg. Awar-awar, Ds. Remen Tasikharjo, Jenu
PO BOX 05-Tuban 62352, Jawa Timur-Indonesia
Phone : (62) (0356) 491031 (Hunting)
Fax : (62) (0356) 491030 page 7 of 12
PT. TRANS-PACIFIC PETROCHEMICAL INDOTAMA

CTG DCS LOGSHEET FOR MAJOR OVERHAUL


CTG NO :

SAFE OPER ACTUAL ACTUAL


No DESCRIPTION TAG NO REMARK
WINDOW (BEFORE MI) (AFTER MI)

1Load ( MW ) < 21.48 11,2


2PF 0,79
2MVAR 8,6
3Ampere (A) 715,4
3Winding Temp. Max. ( oC ) < 130
Phase R ( oC ) TE1145A < 130 78
Phase S ( oC ) TE1146A < 130 80
Phase T ( oC ) TE1147A < 130 79
Phase R ( oC ) TE1145B < 130 79
Phase S ( oC ) TE1146B < 130 80
Phase T ( oC ) TE1147B < 130 79
4 Air Temp. Outlet Max. ( oC ) TE1142 < 95 77
5 Tegangan Exitation (V) 42 30
6 Ampere Exitation (A) 6,5 4,8
7 Frequency (Hz) 50 50
8 Partial Discharge
Phase R (mV) TE1145A <20 2,57
Phase S (mV) TE1146A <20 2,11
Phase T (mV) TE1147A <20 2,22
Phase R (mV) TE1145B <20 2,25
Phase S (mV) TE1146B <20 2,15
Phase T (mV) TE1147B <20 2,37
COUNTER
1 KWH Meter ( MWH ) 20 11
2 Fuel Oil (DCS) ( kg )
Site Office:
Jl. Tg. Awar-awar, Ds. Remen Tasikharjo, Jenu
PO BOX 05-Tuban 62352, Jawa Timur-Indonesia
Phone : (62) (0356) 491031 (Hunting)
Fax : (62) (0356) 491030 page 8 of 12
PT. TRANS-PACIFIC PETROCHEMICAL INDOTAMA

CTG DCS LOGSHEET FOR MAJOR OVERHAUL


CTG NO :

SAFE OPER ACTUAL ACTUAL


No DESCRIPTION TAG NO REMARK
WINDOW (BEFORE MI) (AFTER MI)

3 Fuel Gas ( kg )
4 Steam Injection
5 Firing Hour (H)

Site Office:
Jl. Tg. Awar-awar, Ds. Remen Tasikharjo, Jenu
PO BOX 05-Tuban 62352, Jawa Timur-Indonesia
Phone : (62) (0356) 491031 (Hunting)
Fax : (62) (0356) 491030 page 9 of 12
PT. TRANS-PACIFIC PETROCHEMICAL INDOTAMA

CTG DCS LOGSHEET FOR MAJOR OVERHAUL


CTG NO :

SAFE OPER ACTUAL ACTUAL


No DESCRIPTION TAG NO REMARK
WINDOW (BEFORE MI) (AFTER MI)

Discription :
Note & Justification for abnormalities
Conclusion &
Solution :
NAMA TANDA TANGAN

TPPI OPERATOR
LOGGED BY
PJBS

TPPI
CHECKED BY
PJBS

TPPI
APPROVED BY
PJBS

Site Office:
Jl. Tg. Awar-awar, Ds. Remen Tasikharjo, Jenu
PO BOX 05-Tuban 62352, Jawa Timur-Indonesia
Phone : (62) (0356) 491031 (Hunting)
Fax : (62) (0356) 491030 page 10 of 12
PT. TRANS-PACIFIC PETROCHEMICAL INDOTAMA

VIBRATION TURBINE GENERATOR MONITORING FOR MAJOR OVERHAUL


CTG NO :

SAFE OPER
No DESCRIPTION TAG NO ACTUAL (BEFORE MI) ACTUAL (AFTER MI) REMARK
WINDOW

WAKTU PENGGAMBILAN DATA (tanggal & jam) 18 Juni 2019 DCS CSI 2140 DCS CSI 2140
TURBINE BEARING MAX. VIBRATION
1 Turbine Bearing (C) ( µm pk-pk ) XT-1101X < 126 78 70
2 Turbine Bearing (D) ( µm pk-pk ) XT-1101Y < 126 22 18
3 Turbine Bearing (E) ( µm pk-pk ) XT-1102X < 126 49 48
4 Turbine Bearing (F) ( µm pk-pk ) XT-1102Y < 126 0 0
5 Seismic Vibration Turbine #1 (mm/s ) VE-1103A < 12.7 3.55-3.78 (0-pk) 2.78 (RMS)
6 Seismic Vibration Turbine #1 (mm/s ) VE-1103B < 12.7 3.63-3.97 (0-pk) 2.68 (RMS)
7 Seismic Vibration Turbine #2 (mm/s ) VE-1104A < 12.7 3.54-3.68 (0-pk) 2.76 (RMS)
8 Seismic Vibration Turbine #2 (mm/s ) VE-1104B < 12.7 5.13-5.43 (0-pk) 3.04 (RMS)
LOAD GEAR BRG MAX. VIBRATION
1 HS Journal Brg Load Gear (A) ( µm pk-pk ) XT-1105X < 92 15 9
2 HS Journal Brg Load Gear (B) ( µm pk-pk ) XT-1105Y < 92 24 16
3 HS Journal Brg Load Gear (C) ( µm pk-pk ) XT-1106X < 92 15 8
4 HS Journal Brg Load Gear (D) ( µm pk-pk ) XT-1106Y < 92 9 6
5 LS Journal Brg Load Gear (E) ( µm pk-pk ) XT-1107X < 92 10 5
6 LS Journal Brg Load Gear (F) ( µm pk-pk ) XT-1107Y < 92 12 7
7 LS Journal Brg Load Gear (G) ( µm pk-pk ) XT-1108X < 92 18 10
8 LS Journal Brg Load Gear (H) ( µm pk-pk ) XT-1108Y < 92 18 10
GENERATOR BEARING MAX. VIBRATION
1 Seismic Bearing Gen. #1(BB10) ( mm/s ) VE-1109 < 4.5 1.17-1.35 (0-pk) 1.20 (RMS)
2 Seismic Bearing Gen. #2(BB12) ( mm/s ) VE-1110 < 4.5 0.62-0.73 (0-pk) 0.60 (RMS)

Site Office:
Jl. Tg. Awar-awar, Ds. Remen Tasikharjo, Jenu
PO BOX 05-Tuban 62352, Jawa Timur-Indonesia
Phone : (62) (0356) 491031 (Hunting)
Fax : (62) (0356) 491030 page 11 of 13
PT. TRANS-PACIFIC PETROCHEMICAL INDOTAMA

VIBRATION TURBINE GENERATOR MONITORING FOR MAJOR OVERHAUL


CTG NO :

SAFE OPER
No DESCRIPTION TAG NO ACTUAL (BEFORE MI) ACTUAL (AFTER MI) REMARK
WINDOW

Discription :
Note & Justification for abnormalities
Conclusion &
Solution :
NAMA TANDA TANGAN

TPPI OPERATOR
LOGGED BY
PJBS

TPPI
CHECKED BY
PJBS

TPPI
APPROVED BY
PJBS

Site Office:
Jl. Tg. Awar-awar, Ds. Remen Tasikharjo, Jenu
PO BOX 05-Tuban 62352, Jawa Timur-Indonesia
Phone : (62) (0356) 491031 (Hunting)
Fax : (62) (0356) 491030 page 12 of 13