PLAN FUNDATII

Sc. 1:50

-2.35 -2.35

PLOTURI DE BETON SIMPLU C12/15


SUB GRINDA DE FUNDARE

-2.35 -2.35

-2.35 -2.35

PLOTURI DE BETON SIMPLU C12/15


SUB GRINDA DE FUNDARE

-2.35 -2.35

-2.35 -2.35

FUNDATIE SCARA

-2.35

PLOTURI DE BETON SIMPLU C12/15


SUB GRINDA DE FUNDARE

-2.35 -2.35

-2.35 -2.35

-2.35
-2.35

F1

-2.35 -2.35

-2.35

-2.35 -2.35

-2.35 -2.35

NOTA :
· CONSTRUCTIA SE AFLA AMPLASATA IN ZONA AVAND VALOAREA DE VARF A ACCELERATIEI
TERENULUI ag =0.25g SI PERIOADA DE COLT Tc = 0.7 sec, CONFORM NORMATIV P100-1/2013.
· CLASA DE IMPORTANTA A CONSTRUCTIEI ESTE III, CONFORM NORMATIV P100-2013 ( l =
1.00 ).
· FUNDAREA CONSTRUCTIEI SE VA FACE DIRECT IN TERENUL BUN DE FUNDARE SI CU O
INCASTRARE DE CEL PUTIN 20 cm IN ACEST STRAT NATURAL.
· INAINTE DE INCEPEREA SAPATURILOR PENTRU FUNDATII SE VOR DEZAFECTA SAU DEVIA
EVENTUALELE RETELE DE INSTALATII EXISTENTE DIN ZONA.
· INAINTE DE TURNAREA BETONULUI SE VOR MONTA IN COFRAJ TOATE PIESELE METALICE
INGLOBATE.

Materiale VERIFICATOR/ REFERAT/EXPERTIZA NR./DATA


Beton in cuzineti ,grinzi si placa: C 20/25 EXPERT
Beton in bloc de beton simplu: C 12/15 S.C. STRUCTEXO PROIECT SRL Beneficiar: ISTRATE PETRU Proiect nr:
Otel beton: PC52 J37/343/2013 32/2018
Acoperire cu beton: NUME si PRENUME SEMNATURA Scara: Titlu proiect: CONSTRUIRE HALA INDUSTRIALA, Faza:
SPECIFICATIE CLADIRE BIROURI, ANEXE, PTh. + D.E.
-fundatii: 5 cm 1:50 IMPREJMUIRE, BRANSAMENTE SI
-pardoseala: 2 cm SEF PROIECT Ing. RASCANU RAZVAN
RACORDURI
jud. Iasi, mun. Pascani, strada Garii, nr. cad. 60359, C.F. nr.
-grinzi perimetrale: 3 cm 60359
PROIECTAT Ing. RASCANU RAZVAN Data: Titlu plansei: PLAN FUNDATII SI DETALII Plansa nr.
05.2018 FUNDATII R01
DESENAT Ing. RASCANU RAZVAN