You are on page 1of 4

COMBINED FOOTING DETAILS

CF - 1 SBC = 145 kN/m2 DATE 01-02-2019


2
fck = 25 N/mm REVISION R0
2
fy = 500 N/mm DESIGN
Column c/c distance 4.95 m
Beam Width 0.75 m
SBC x 1.25 = 181.25 kN/m2

Column R1-C' GRAVITY Pumax Mxmax Mzmax


375X750 Pu (kN) 1716 1766 1439 1589
Mx (kN-m) 21 198 239 45
Mz (kN-m) 13 14 39 107
L/C 101 105 102 102

Column R1-G' GRAVITY Pumax Mxmax Mzmax


375X750 Pu (kN) 1716 2048 1384 1601
Mx (kN-m) 44 239 326 86
Mz (kN-m) 1 36 36 100
L/C 101 105 104 102

Total Load GRAVITY Pumax Mxmax Mzmax


Pu (kN) 3432 3814 2823 3190
Mx (kN-m) 65 437 565 131
Mz (kN-m) 14 50 75 207
L/C 101 105 104 103

2
Area of footing required = P X 1.10 / SBC = 26.04 m
Area of footing L = 8.000 m
B = 3.500 m

Area of footing Provided = 28.00 m2

CHECK FOR BASE PRESSURE


2
Pmax/min=(Load × 1.10)/(Area of Footing) ± Mx/Zx ± Mz/Zz kN/m
Gravity case Pmax = 139.18 kN/m2 < SBC, Hence OK
2
Pmin = 130.47 kN/m > Zero, Hence OK
2
Pu max Case Pmax = 177.93 kN/m < 1.25 x SBC, Hence OK
Pmin = 121.74 kN/m2 > Zero, Hence OK
MX max Case Pmax = 147.50 kN/m2 < 1.25 x SBC, Hence OK
2
Pmin = 74.30 kN/m > Zero, Hence OK
2
MZ max Case Pmax = 138.89 kN/m < 1.25 x SBC, Hence OK
Pmin = 111.76 kN/m2 > Zero, Hence OK
CHECK FOR NET UPWARD PRESSURE

N.up=Load/(Area of Footing) ± Mx/(2 × Zx) ±Mz/(2 × Zz) kN/m2

Gravity case Nup = 124.75 kN/m2 < SBC, Hence Safe


2
Pu max Case Nup = 150.26 kN/m < 1.25 X SBC, Hence Safe
MX max Case Nup = 119.12 kN/m2 < 1.25 X SBC, Hence Safe
2
MZ max Case Nup = 120.71 kN/m < 1.25 X SBC, Hence Safe

CALCULATION OF CENTERIOD

X = (1716 x 4.95)/(1716 + 1716) = 2.4750 m


Say = 2.475 m
Column R1-C' Column R1-G'

8.000
1.525 4.950 1.525
1.375

0.750 P1 = 1716 kN P2 = 1716 kN 3.500

1.375
2.475 2.475

FOOTING SLAB DESIGN

Max. Net Upward Pressure = 150.26 kN/m2


= 0.150 N/mm2
For M25, ζc = 0.19 N/mm2

Effective Depth of the d = 1375 x 0.150 Say,


footing 0.150 + 0.19 D= 675 mm
d = 607.2 mm d= 610 mm

Moment, 𝑀= 𝑊 𝑙2 / 2 min Ast = 0.12% bD = 810 mm2


M = 142 kN-m min Shear Ast = 0.15% bd = 915 mm2
k = 0.57 Hence the max Ast = 915.00 mm2
Pt = 0.136 Dia of main bar 12 mm
Ast = 829.6 mm2 Dia of distribution bar 10 mm

Hence spacing of main reinforcement = 124 mm


Hence spacing of Distribution reinforcement = 97 mm

Therefore, 491
Provide Y12 @ 125 mm c/c as main reinforcement. 491
Provide Y10 @ 150 mm c/c as distribution reinforcement. 491
BEAM DESIGN
Column R1-C' Column R1-G'
8.000
1.525 4.950 1.525

999 Load, W = 526 kN / m

BMD
kN - m

612 612

802 1302

SFD
kN
1302 802

To get Beam Main Reinforcement : Beam data :

i. M = 612 kN - m b 750 mm
k = 1.84 D 900 mm
Pt = 0.47 d 815 mm
Ast = 2873 mm2
Bar dia = 25 mm Column width = 375 mm
No. of Bars 5.9 Stirups bar area = 79 mm2
Therefore, Provide 6Y 25
Provide NO EXTRA To get Beam Shear Reinforcement :

ii. M = 612 kN - m V = 1302 kN


k = 1.84 Vs = 1302 0.375 + 0.815 x 526
Pt = 0.47 2
Ast = 2873 mm2 Vs = 774 kN
Bar dia = 25 mm
No. of Bars 5.9 Stirup dia 10 mm
Therefore, Provide 6Y 25 No. of Legs 6
Provide NO EXTRA
Spacing of Stirups = 119 mm c/c
iii. M = 999 kN - m
k = 3.01 Therefore,
Pt = 0.831 Provide 6L Y10 @ 100 - 150 - 100 mm c/c.
2
Ast = 5609 mm
Bar dia = 25 mm
No. of Bars 11.43
Therefore, Provide 6Y 25
Provide 6Y 25 EXTRA
COMBINED FOOTING DETAILS CF - 1

8000
1525 4950 1525

D = 675mm Provide Y12 @ 125 mm c/c 1375


3500

Column R1-C' Column R1-G'


BEAM B1 = 750X900 750
375X750 375X750

Provide Y10 @ 150 mm c/c 1375

Provide 6Y 25
Provide 6Y 25 EXTRA

900

Provide NO EXTRA Provide Provide NO EXTRA


6Y 25
Provide 6L Y10 @ 100 - 150 - 100 mm c/c.

BEAM B1 = 750X900

Provide 6Y 25
Provide 6L Y10 @ 100 - 150 - 100 mm c/c. Provide 6Y 25 EXTRA
750

Provide NO EXTRA
225 Provide 6Y 25

900
675

3500

Provide Y10 @ 150 mm c/c Provide Y12 @ 125 mm c/c