You are on page 1of 1

E 455600.

00

E 455700.00

E 455800.00

E 455900.00
00
0+2
N 24100.00 N 24100.00 N 24100.00 N 24100.00

SS
RE
WA

PA
LL

ER
0
RE

30

OV
WA

0+
LL

ED
OS
OP
PR
E 455600.00

E 455700.00

E 455800.00

E 455900.00
0
40
RE

0+
WA
RE LL
WA
N 24000.00 N 24000.00 LL N 24000.00 N 24000.00

00
0+5
E 455600.00

E 455700.00

E 455800.00

E 455900.00
LOCATION PLAN

KANABA OVERPASS
NOTES: APPROVED BY : CLIENT : CONTRACTOR: SUB-CONTRACTOR:
No Date By Revision PROJECT : DRAWING TITLE : DRAWING NUMBER:
1. This drawing shall be read in conjunction with all other relevant Designed: SD UGANDA NATIONAL ROADS AUTHORITY
documentation. CLIENT PROJECT DWG NUMBER & TYPE STATUS REVISION
2. Do not scale from this drawing. Use only printed dimensions.
Plot 5, Lourdel Road
Nakasero
3. Unless defined otherwise, all dimensions are in millimetres and all chainages, UNRA 00081 GAD/OP/KANABA BS 00
levels and coordinates are in metres. Drawn: PD P O BOX 28487 Design and Build of Upgrading of
Kampala - UGANDA
GENERAL ARRANGEMENT DRAWING OF
4. This drawing is to be used only for the purpose of issue that it was issued for For Consultant Date Najjanankumbi-Busabala Road and OF KANABA OVERPASS PEC Internal Project Number:
and is subject to amendment.
Checked: SCK T: +256 312 233 100 Munyonyo Spur Improvements and PLOT 31, MACKENZIE VALE RD, Plot 9 Makajja Close
off Ntinda II Road, Naguru
This document has been prepared pursuant to and subject to the terms of F: +256 414 232 807 Service Roads Project (2 X 35.0 PSC/RC I GIRDER) DRAWING STATUS: BIDDING STAGE KOLOLO, KAMPALA
P.O.Box 9529, Kampala, Uganda P.O.Box 9529, Kampala, Uganda
SINOHYDRO'S appointment by its client. SINOHYDRO accepts no liability for any E: executive@unra.go.ug T: +256 773 192 065 T: +256 393 513038, F: +256 414 566038
use of this document other than by its original client or following SINOHYDRO'S SCALE AT A1 SIZE: AS SHOWN E: pec@pec.co.ug
W: www.unra.go.ug E: xiadong7402@qq.com
express agreement to such use, and only for the purposes for which it was Approved: KG
prepared and provided. For Client/Roads Authority Date COPYRIGHT RESERVED

You might also like