OBSERVED VALUES
Frustration Instructional Independent Total
Grade 1 5 2 7
Grade 2 2 1 3
Grade 3 1 1 2
Total 5 5 2 20
OBSERVED VALUES
Frustration Instructional Independent Total
Grade 1 1.75 1.75 0.70 7
Grade 2 0.75 0.75 0.30 3
Grade 3 0.50 0.50 0.20 2
Total 5 5 2 20
Chi-Square Test
α 0.05
df 4
x2 15.4380952
P-value 0.009121481
x2-Crit 9.487729
Sig. Yes
Result: There is significant difference between the OPLAN BASA post test results and the results of
“Project TERRY”
Table 2
Table __ presents the significant difference between the OPLAN BASA post test
results and the results of “Project TERRY. The data shows that the intervention/
remedial activities to improve the reading performance of Grade One Pupils and some
Grade Two and Grade Three pupils obtained a computed x2 result of 15.4380952 which
exceeded the tabular x2-value of 9.487729. Hence, the relationship between OPLAN
BASA post test results and the results of “Project TERRY are significant. The null