You are on page 1of 26

PAINTING REPORT

CUSTOMER : PT. FEDERAL KARYATAMA Date Of inspection


PROJECT : LOBP - CILEGON Location

MATERIAL TO BE PAINTED :
1 : Shell holding tank 1 Dwg No. : MD - 19 - 1
2 : Cone Dwg No. :
3: Dwg No. :
4: Dwg No. :
5: Dwg No. :
6: Dwg No. :
7: Dwg No. :
8: Dwg No. :
9: Dwg No. :
10 : Dwg No. :

SURFACE PREPARATION : Brushing atau yg lainya


PREPARATION RESULT : hasil surface preparation isi disini, acc or rej ceklis dibawah

Accepted Rejected

PAINTING APLICATION
Method : SPRAY ROLL PAINTING OTHER ( .)

PRESSURE : isi sesuai tekanan yg di pakainya kalau pake metode spray

PAINT
BRAND NAME
COLOUR BASE CURING THINNER
Primer Coat hempel Grey 45889 95881 merknya
Second Coat

Top Coat

PAINT APPLICATION RESULT : Accepted

REMARKS : tulis keterangan thinner dan yg tidak terdeskripsikan diatas, di bagian ini.
PREPARED BY, CHECKED BY,

RIZAL MALLAWA TRIYO


0
Doc. No
Revision 0
Date 2 Maret 2015

Date Of inspection :
Location : Site LOBP - Cilegon

: MD - 19 - 1
:
:
:
:
:
:
:
:
:

ted

OTHER ( .)

e metode spray

APPLICATION Average DFT


TIME DATE (microns)

Rejected
APPROVED BY,

SAEBANI
0
PAINTING REPORT
Customer : PT. FEDERAL KARYATAMA
Project : LOBP - Cilegon
Part :
Title :
Name of Tank
Prepared by Checked by

Rizal Mallawa Triyo


0
PAINTING REPORT
Location : PT. WOKATUBA INDONESIA

Doc. No :

Date :
Title :
Tank
Approved by Prepared by

Saebani Rizal Mallawa


0
PAINTING REPORT
Customer : PT. FEDERAL KARYATAMA Location : PT. WOKATUBA INDONESIA
Project : LOBP - Cilegon Doc. No :
Part : Date :

Name of Tank
Checked by Approved by

Triyo Saebani
0 0
PAINTING REPORT
Customer : PT. FEDERAL KARYATAMA
Project : LOBP - Cilegon
Part :
Title :
Name of Tank
Prepared by Checked by

Rizal Mallawa Triyo


0
PAINTING REPORT
Location : PT. WOKATUBA INDONESIA

Doc. No :

Date :
Title :
Tank
Approved by Prepared by

Saebani Rizal Mallawa


0
PAINTING REPORT
Customer : PT. FEDERAL KARYATAMA Location : PT. WOKATUBA INDONESIA
Project : LOBP - Cilegon Doc. No :
Part : Date :

Name of Tank
Checked by Approved by

Triyo Saebani
0 0
PAINTING REPORT
Customer : PT. FEDERAL KARYATAMA
Project : LOBP - Cilegon
Part :
Title :
Name of Tank
Prepared by Checked by

Rizal Mallawa Triyo


0
PAINTING REPORT
Location : PT. WOKATUBA INDONESIA

Doc. No :

Date :
Title :
Tank
Approved by Prepared by

Saebani Rizal Mallawa


0
PAINTING REPORT
Customer : PT. FEDERAL KARYATAMA Location : PT. WOKATUBA INDONESIA
Project : LOBP - Cilegon Doc. No :
Part : Date :

Name of Tank
Checked by Approved by

Triyo Saebani
0 0
PAINTING REPORT
Customer : PT. FEDERAL KARYATAMA
Project : LOBP - Cilegon
Part :
Title :
Name of Tank
Prepared by Checked by

Rizal Mallawa Triyo


0
PAINTING REPORT
Location : PT. WOKATUBA INDONESIA

Doc. No :

Date :

Tank
Approved by

Saebani
0

You might also like