You are on page 1of 28

Basic Installation Guidelines- eNode B

Hand Book on Most Repeated Punch Points


Circle - Kolkata

Prepared by :-Surender Chandra


1 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Points to be Followed

Implementation Points Infra Points


1. Own Safety First 1. System Module – Pole/Space Availability
2. Documentation -Pre Installation 2. RF Module- Pole/Space Availability
3. Equipment handling and Safety 3. OVP- Space for Power cable Routing
4. Module Installation 4. Antenna- Pole/Space Availability
5. Module Grounding 5. Grounding- EGB/IGB/Grounding Points availability
6. Jumper routing 6. Power- Space Available
7. Antenna installation
8. Labelling
9. Power cable installation
10. GPS Installation
11. OVP Installation
12. Cover fixing & installation
13. FPKA and FMFA
14. RF/EMP Grounding &Weather proofing
15. Crimping
16. Documentation- Post Installation

2 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Note:- Above Data is as per the IPM reporting Desk Report
Points to be Remember
1. Follow OHS
2. Always Wear Anti Static Wrist Band while Handling Modules
3. Material Verification to be done when reaching to the site and Inform Nokia/TI against the shortage /Damages/Excess of Material
4. Two Modules per Plinth( FMFA)
5. Two Plinth Per FPKA
6. OVP to be install bottom side of the Module
7. OVP to be install for RF Modules
8. Modules( SM/RF/OVP) Grounding to be terminated to FMFA( Plinth)
9. FMFA( Plinth) to be Grounded to BUS Bar or Earth Strip with Clamps or Bolts and ensure the connectivity towards Earth pit.
10. Power cable to be routed inside the modules with Cable Clamps
11. Power cable to be route with the Metallic Ties
12. Antenna to be Install according to the Manufacturer Guidelines
13. Optical Cable to be routed Straight and with Cable ties( approx. 0.5Mtr Space B/w )
14. Down wards Cable Entry to be done for Modules in case of Wall and Pole.
15. Front cover of Module to be fixed with maintenance strap
16. Self Assessment to be Done after Completion of Installation
17. Do not Power On the BTS if BTS not Grounded
18. MCB Requirement :- 32 A for RF module and 16 A for System Module
19. All Unused Ports to be Sealed with IP Protected Caps( IP55)
20. Make Sure When Installing RF module ANT 1 Port comes at TOP side
21. Make Sure when Installing System Module Power Port comes at Down Side
22. Make sure Optical Cable Right Angles Connector comes downside when connecting to SM and RF module
23. Right Angles Connector type Optical Cable with IP 55 Protected Cable to be used if not supplied Inform ASAP to NOKIA
3 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Note:- Above Data is as per the IPM reporting Desk Report
Do’s Safe Your self Don'ts

4 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s ESD- Equipment Safety Don'ts

ESD:- Always wear Anti static Wrist Band while handling Modules
5 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s FPKA/FMFA Don'ts Expansion /
2nd FMFA
installation
not possible

Place for
ANT for
their Eggs

Installation of FPKA “ 2 FMFA can be installed Easily”

6 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
2 Modules per Plinth(FMFA) and 2 FMFA per Mounting Kit( FPKA)
For Internal Use
Do’s Module Installation-RF Module 1/2

Always
7 Make ANT
29/03/2016 1 Port
© Nokia 2014 Upside soAssessment
- Site Quality that Optical
ReportCable
- 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Installation-System Module( Classic Solution) 2/2
Do’s Don'ts

Always
8
install System Module as shown in the Picture ,IF not Installed accordingly Optical Cable Right Angled connector will
29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
notFor
FitInternal
Accordingly
Use
Do’s Optical cable Installation- Classic Solution Don'ts 2/2

Right Angles Connector type Optical Cable with IP55 Protected to be used
9 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Installation-System Module( Distributed Solution) 2/2
Do’s
Power Port
at top

OFC
cable

Always install System Module as shown in the Picture only in Distributed solution where Vodafone provided Optical cable is supplied. “ RAVI Industries “

10 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s Grounding Don'ts

All Modules to be Grounded to its Plinth (FPKA) and Plinth to be Grounded to Near BUS Bar or to be Clamped /Bolted to
Grounding Strip, And Ensure Proper Connectivity
11 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s Cable Entry Don'ts

All Cables to be installed from Down side of the modules


12 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s Optical cable Installation Don'ts 1/2

Modules to be installed so that Optical cable Bend goes down


13 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s OVP Installation
Don'ts

Premade DC Cable (FPCC or FPCA)

OVP to be installed on the Bottom /Back side of the Module


14 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s Antenna Installation Don'ts

Before Starting Antenna Assemble Pls refer the Installation Documents. All Antenna have Difference Assemble Instruction
15 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s Antenna RET “Transparent Tube”

Note:-
1.Remove the Tube and Tie them all
together and then only Climb the
Antenna to the Tower.

2. If The tube touched the


ROPE/Tower it will not Open in future
as it will Stuck Inside and Lock.

3.RET will not be possible if Tube is


damaged

16 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s Antenna Port “color Code” ( 2G/3G/4G)

790-960 MHz (2x) 7/16-DIN Female / Long Neck

Red Rings
790-960 MHz (2x) 7/16-DIN Female / Long Neck
900 2G/U900

White Rings 1710-2170 MHz (2x) 7/16-DIN Female / Long Neck


1800 2G

Blue Rings
1710-2170 MHz (2x) 7/16-DIN Female / Ultra Long
2100 3G

Yellow Rings 1710-2690 MHz (2x) 7/16-DIN Female / Ultra Long Neck
1800 Lte
Electrical Tilt RET
for 900 2G
Electrical Tilt
for 2100 3G
Electrical Electrical Tilt
Tilt 1800 2G 1800 Lte

17 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s Antenna SWAP

Note:-
1. All Sites have Antenna SWAP
2. There will be 20-30 Min of Outages in swapping Each Antenna
3. In most of the Sites Existing Feeder cable is Hanging
4. New Antenna is 2700 mm of Length and when it will be install Excess length of cable will be hanged.
5. As per the Instruction We have to Order Feeder Clamps/Connector so that Re-Connectorization can be done with in 20-30 Min .
6. And then Cable routing can be done smoothly

18 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s Power cable Routing Don'ts

1.Power cable to be Route using Metallic Ties


2. On the Other End After Stripping cable Put Weather Proofing and Seal it properly

19 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s FSEB Installation 1/2
•Pull the left U-shaped cable gland from the FSEB.
•Remove the hole closing plug from the cable gland, if the plug is
Fixed with a cable ties, cut the cable tie first and remove it.
•Insert the cable in the cable gland. The D-sub plug must point to
The inside of the box.
•Connect the D-sub plug to the leftmost D-sub connector X1101
HORIZONTAL INSTALLATION
On the FSEB board.
•Fix the connector fixing screws.
•Insert the U-shaped cable gland to the front plate.
•Insert the cable to the round rubber seal in front of the U-shaped
Cable gland.
•Fix the cable with a cable tie. Make sure that the U-gland fixes the
Cable tightly.
•Remove the cover of the EAC connector on the System Module
VERTICAL INSTALLATION
•Insert the other end of the cable with the HDMI connector to
EAC connector of the SM ,Make sure that the HDMI connector is
Firmly in place.
•Route the cable between the FSEB and SM and fix it with cable
Ties .The first fixing point must not be further away from the
FSEB than 0.5Mtrs.

FSEB CONNECTOR • Extending the Flexi BTS Alarm Connector to Support 24 Alarm
Interface
• 12 Alarms are supported for Flexi LTE BTS
• Support Fire Detector
20 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
• IP 55 protected
For Internal Use
Do’s FSEB Installation 2/2

Use Metallic Ties for FSEB Installation


21 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s GPS Installation

System Module

Connect to Sync IN

•Route the cable between the GPS and SM and fix it with cable Ties .
The first fixing point must not be further away from the GPS than 0.5Mtrs to 1Mtrs

22 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s Weather proofing Don'ts

•Weather Proofing is a Big Challenge in 8 Port Amphenol Antenna


•Need to Put Efforts in doing Weather proffing

23 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s Lugs Crimping Don'ts

•Tool:- Hexagonal Crimping Tool


24 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s Covers Fixing Don'ts

•Front Covers to be Fixed with Maintenance Strap


25 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s IP Caps

•All Unused Ports to be Covered with IP Protected Caps, For LMP ports Chain the IP Caps for maintenance
•For the Used Ports where the IP caps cannot be used Place them in a safe area or Chain all of them with Clamps
26 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
Do’s Labeling
LTE MODULES LABELING To be apply Remarks
1003 System Module GND System Module Gorund both end
1004 RF 1 Module GND RF 1 Module Gorund both end
1004A RF 2 Module GND RF 2 Module Gorund both end
1004A RF 3 Module GND RF 3 Module Gorund both end
3120 XCMK Power Cable SM System Module XCMK Power Cable both end
3121 XCMK Power Cable RF1 RF 1 Module XCMK Power Cable both end
3122 XCMK Power Cable RF2 RF 2 Module XCMK Power Cable both end
3123 XCMK Power Cable RF3 RF 3 Module XCMK Power Cable both end Manually to be applied if required
3122A Open Blue cable System Module -48V Indoor Application
31224 Open Black cable System Module 0V Indoor Application
4140 MAIN ANT PORT-1 RF-1 Sector 1 Feeder- Main for RF 1 TX/RX
4141 Diversity ANT PORT-1 RF-1 Sector 1 Feeder- Diversity for RF 1 RX
5150 MAIN ANT PORT-2 RF-1 Sector 2 Feeder- Main for RF 1 TX/RX
5151 Diversity ANT PORT-2 RF-1 Sector 2 Feeder- Diversity for RF 1 RX
6160 MAIN ANT PORT-3 RF-1 Sector 3 Feeder- Main for RF 1 TX/RX
6161 Diversity ANT PORT-3RF-1 Sector 3 Feeder- Diversity for RF 1 RX
4140A MAIN ANT PORT-1 RF-2 Sector 1 Feeder- Main for RF 2 TX/RX
4140B Diversity ANT PORT-1 RF-2 Sector 1 Feeder- Diversity for RF 2 RX
5150A MAIN ANT PORT-2 RF-2 Sector 2 Feeder- Main for RF 2 TX/RX
5150B Diversity ANT PORT-2 RF-2 Sector 2 Feeder- Diversity for RF 2 RX
6160A MAIN ANT PORT-3RF-2 Sector 3 Feeder- Main for RF 2 TX/RX
6160B Diversity ANT PORT-3 RF-2 Sector 3 Feeder- Diversity for RF 2 RX
4141A MAIN ANT PORT-1 RF-3 Sector 1 Feeder- Main for RF 2 TX/RX
4141B Diversity ANT PORT-1 RF-3 Sector 1 Feeder- Diversity for RF 2 RX
5151A MAIN ANT PORT-2 RF-3 Sector 2 Feeder- Main for RF 2 TX/RX
5151B Diversity ANT PORT-2 RF-3 Sector 2 Feeder- Diversity for RF 2 RX
6161A MAIN ANT PORT-3 RF-3 Sector 3 Feeder- Main for RF 2 TX/RX
6161B Diversity ANT PORT-3 RF-3 Sector 3 Feeder- Diversity for RF 2 RX
5210 OBSAI Port 1 Interface SM-RF Optical SM-RF 1 Interface
5220 OBSAI Port 2 Interface SM-RF Optical SM-RF 2 Interface
5230 OBSAI Port 3 Interface SM-RF Optical SM-RF 3 Interface
5130 ETHERNET CABLE 1 - SM SM Uplink Main Etherenet
5131 ETHERNET CABLE 2 - SM SM Uplink Redundant Etherenet
5340 ALARM CABLE System Module Alarm cable

27 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use
28 29/03/2016 © Nokia 2014 - Site Quality Assessment Report - 1.4 - SiSo - RSO/SiSo/QA/ver1.4
For Internal Use