A IMPLEMENTASI
1 Tower Installation LIGHT (Tower Supply by Mitratel) Kg 7,058.00
Including:
- Erection & painting
- OBL & lightning system
- Finishing
- Transportation tower
2 Foundation m3 19.07
Including:
- Galian
- Beton, bekisting, dan pembesian
- Backfill
6 Preparation: Ls 1.00
Including:
- Pembersihan lahan & Perapihan kembali, air kerja, mob & demob, as built
drawing, pengukuran & bouwplank dll
7 PLN Connection
Penyambungan Daya Listrik (PLN) 10.6 KVA (incl BP, UJL dan Jasa dan kabel LS -
50 m & 2 bh tiang)
8 Additional Works
Kawat Berduri untuk kelebihan lahan tinggi 1.2m (incl tiang penyangga dr M' 24.20
besi siku dan pondasinya berjarak 3 m)
B PRA-IMPLEMENTASI Ls 1.00
Including:
- Design Pack ( Asplan dan Design Pondasi )
TOTAL B
GRAND TOTAL (A + B)