Ambuja Cements Limited

Unit- Rabriyawas

Classification: Standard Operating Procedure Page.: 2 Nos


SOP No.: ACL-WI-KL-021 Rev. No. 00
Originating Department: Production Revised Date of Issue: 01.10.2018
Prepared By: (Team
Anil K Chordia, S P Gautam, Manish Ranjan, S S Singh
Members)
Approved By:
V Saxena
Plant Head/ HOD
SOP: Work Instruction for kiln feed air slide jam removal job.
Permit to Work Requirements: Yes
Mandatory PPEs: Safety Helmet, Safety goggles, Nose Mask, Reflective jacket, Safety Shoes, Ear plugs
Related Hazards:

1.Exposure of dust
2.Slip /Trip /Fall from stairs
3.Caught in under and between the equipement/parts.
4.Falling object
5.Exposure of high temperature.
6.Exprosure to hot gas

Consequences of the deviation:

1. Respiratory Problems
2. Injury fracture due to hit of material /slip and trip
3. Skin damage.

01. Purpose: The Purpose of this SOP is to comply with applicable regulatory requirements and to
identify the precautions and general safety rules that should be followed when doing the Job.

02. Scope: This SOP applies to all persons associated with ACL (employees, contractors, workmen)

03. Abbreviation:

SOP: Standard Operating Procedure

HOD: Head of department

ACL: Ambuja Cements limited

PPE: Personal Protective Equipment

B-03.2_Register - Standard Department: Production Page No. 1


Operating Procedure
Ambuja Cements Limited
Unit- Rabriyawas
04. Accountability: Section In-charge/ Engineer/Shift manager/Patroller/Attendant

05. Responsibility: HOD

06. Tools & Tackles:


 Air Hose, 1 No , 20-25 mtrs length, 20MM dia
 GI Pipe with handle 1 No , 4-5 mtrs long, ½” dia
 Hammer with wooden handle 2 Nos

07. Manpower Requirements: 03

08. Results & Acceptance: Working person will not get injured during feeding

09. Frequency of Realization: As per requirement

10. Step by Step Procedure:

 Inform CCR prior to start air side cleaning job.


 Hammering the air slide body.
 Check the material flow.
 Open air slide inspection door if material flow is not proper.
 Start air lancing through inspection door till the complete material is cleaned.
 Close the inspection door of air slide.
 Inform CCR to run the kiln feed recirculation.

11. Communications:

Awareness information which can inspire work men towards behavioral safety to achieve zero harm
should be given by TBT, Monthly safety meetings etc.

12. Amendment Details

Date Rev Change Reason - Change Changed by

B-03.2_Register - Standard Department: Production Page No. 2


Operating Procedure