Professional Documents
Culture Documents
3.6E+04
1.E+03
1.E+02 1.8E+04
1.E+01
0.0E+00
1.E+00
1 2 4 6 8
1.E+01 1.E+03 1.E+05 1.E+07 1.E+09
Time (s) Number of Cores
Time step evolution during a THM modelling CPU time and Wall clock time for a 3D THM
depending on the time step prediction based model representing a borehole disposal in
on error control. Option 7,8,9 depend on target a rock (20000 d.o.f. and 500 years)
relative error of 0.001, 0.0001, 0.00001