You are on page 1of 3

LAYOUT - HOTEL AND

CONVENTION

Item Qty Unit


A CIVIL WORKS
Convention center
1 Basement 2 4586 sq.mts
2 Basement 1 4766 sq.mts
3 Ground floor 4378 sq. mts
4 Mezzanine floor 1320 sq. mts
5 Hotel block
6 Basement 1 1616 sq. mts
7 Ground floor 2186 sq. mts
8 Mezzanine floor 2186 sq. mts
9 First floor rooms 1540 sq. mts
10 Second floor rooms 1540 sq. mts
11 Third floor rooms 1540 sq. mts
112 Terrace structures including
staircase head rooms, lift machine
rooms, OHT, parapet wall etc.,

13 Excavation and leveling 10000 sq. mts


14 Construction of compound wall 1000 rmts

15 U.G.Water sumps - 3 nos. 200 cu.mts


16 Miscellaneous civil works

Total of civil works

B PLANT AND MACHINERY

Convention center block


17 Air conditioning system based on 500 TR
ducted packaged units

18 Toilet exhaust system Lot

19 Electrical works - banquet level 4000 sq. mts

20 Electrical works - basements 9500 sq. mts


21 Diesel generator sets 250 Kva 2

22 Electrical fittings and fixtures Lot

Hotel block
23 Air conditioning system based on 262 TR
VRF technology

24 Toilet exhaust system


25 Service elevators 2 nos

26 Passenger elevators 3 nos

27 Electrical works 10608 sq. mts

28 Diesel generator sets 500 Kva 2

29 Electrical fittings and fixtures Lot

Common services
30 Telephone system Lot

31 Fire fighting 25658 sq. mts

32 Data cabing and fiber


connectivity

33 Hardware / software

34 Offices automation Lot

35 Plumbing lines 25658 sq. mts

36 Plumbing equipment Lot

37 Public area toilet fittings and


fixtures
38 Laundry equipment Lot

39 Hot water system 10 KL


40 Water treatment system
41 Kitchen equipments

42 Kitchen ventilation system

43 Audio and video systems

44 Security systems

45 Acoustic insulation for banquet 1000 sq. mts


halls
46 Thermal insulation for banquet 3000 sq. mts
halls

TOTAL FOR P & M

C Interiors
47 Front of the house areas 6564 sq. mts

48 Room interiors - rounded off 120 nos


49 Back of the house areas 3000 sq. mts

50 Signages

51 Artefacts and special finishes


Total for Interiors

D Landscaping
52 Hard and soft landscaping

Total for Landscaping

E Miscellaneous assets & works


53 House keeping tools

54 Staff facilities
55 Material handling tools
56 Vehicles
57 Safe lockers etc.,
58 Engineering tools and hardware
59 F&B service ware
60 Room service equipment
61 Banquet and restaurant linen
62 Uniforms
Total for misc works / assets

F Preliminary and pre opening exp.


During project period of 18
months