The Contractor (Bidder) is aware that prices and its breakdown take into account all the work necessary for the proper execution of the work subject that are obvious and
/ or which may be appropriately qualified and competent contractor shall predict. All utility work and incidental expenses, unless specifically provided, shall be included
in the cost of the work. These rates include labor cost, manpower, materials, machinery equipment, the cost of organization and management work, temporary works, as
well as any incidental costs necessary for the proper execution of work and a reasonable profit.
No. Scope of Work Unit Quantity Unit Price Total Price note
without VAT without VAT
1 EARTHWORKS 0.00
1.1.
Excavation of soil, loading, removing and reloading to m3 180 0.00
stock pile,stock pile levelling and spreding, up to 5 km
1.2. Excavation of rock and removing to stock pile up to 5km. m3 0 0.00
part of
Flashing of all openings, internal coating RAL 9010, 0 incl. incl.
5.2. roof
reinforcing, screws, sub profiles sealant and scaffolding. delivery
6 FACADE - CLADDING 0.00
The Contractor (Bidder) is aware that prices and its breakdown take into account all the work necessary for the proper execution of the work subject that are obvious and
/ or which may be appropriately qualified and competent contractor shall predict. All utility work and incidental expenses, unless specifically provided, shall be included
in the cost of the work. These rates include labor cost, manpower, materials, machinery equipment, the cost of organization and management work, temporary works, as
well as any incidental costs necessary for the proper execution of work and a reasonable profit.
No. Scope of Work Unit Quantity Unit Price Total Price note
without VAT without VAT
7.4.
Pedestal made of bricks 120mm, plastered, painted RAL m2 16 0.00
7035
7.5. Item 08/001 - galvanized gate + fence pcs 1 0.00
7.6. Portable fire extinguisher - powder pcs 4 0.00
TOTAL PRICE without SALE TAXES 0.00 Euro
..............................
.............................. .............................. Date
Company Name Name and Signature
TOTAL EUR
ulfil
Total EUR
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Excluded
Excluded
INCLUDED
0.00