OBJECTIVE:
To the extent possible study will be conducted with the following standards:
CEA regulations 2010
NFPA (National Fire Protection Association) of USA
National Building Code
National Electrical Code
Applicable Indian & International Standards
Good engineering practices followed in similar industries
SCOPE OF WORK:
1. Verify Electrical layout in the plant (General arrangement of power supply and
distribution in the plant)
2. Physical inspection of the plant (Utility). Identify electrical hazards (shock, fire,
explosion, overloading) and to suggest electrical safety solutions.
3. Review of:
Plant lightning protection system (need, adequacy, installation and maintenance)
Static electricity hazards in the plant operations.
Portable process equipment’s.
Hazardous area classification and selection of flameproof electrical equipment in
the plant, including maintenance aspects and Flameproof / weatherproof
protection.
Electrical preventive maintenance system (including tests, documentation,
history cards etc.).
Electrical incidents/accidents/ near misses in the plant to identify the root
causes.
All Potential Electrical Hazards that involves Personnel, Electrical Systems,
Electrical Installations, Services and Operations.
Electrical systems & procedures (work permits, interlocks, lockout tags etc.).
Compliance of Electrical Systems and Electrical Installations and Maintenance
Practices in Line with Statutory Regulations.
Earthing system (installation & maintenance aspects), including sample earth
resistance tests Protection devices /system of the electrical installation.
Protection devices / system of the electrical installation.
4. Checks for:
Healthiness of Protection Devices/ System. Testing and Certification of HT/LT
Protective relays for Electrical Installations.
Healthiness/Aging of Electrical Installations in plant,
Healthiness of Transformers, Electrical Panels and DG Panels.
Check operation of ELCBs for PDBs and Surge Protection Device for Critical
Installations.
Operation and Healthiness of UPS and batteries.
Operation and healthiness of Fire Protection system.
At the end of field study, a report with executive summary to be provided on the findings of
the study and recommendations for next course of action. The report will include
observations and recommendations based on the above scope of work and Unit/Facility
(premise) specific observations may be classified as below: