BI LLS OF QUAN TITIES

PROJECT :PROPOSED HOUSE Ms. GUNASEKARA NO 30, SANGAMITTA AVENUE AT


MOUNT LAVINIA

CIVIL WORK

PRINCIPAL ARCHITECTS : ARCHT. H.M. KAVINDRA DULIP HERATH


AIA (SL)
NO. 93/9 WEKADAWATTA ROAD , THUMBOWILA ,
PILIYANDALA.

MARCH 2016
Grand Summary Bill of Quantities - Package 02. Civil Work Page No.2

BI LLS OF QUAN TITIES


PROJECT :PROPOSED HOUSE Ms. GUNASEKARA NO 30, SANGAMITTA AVENUE AT
MOUNT LAVINIA
CIVIL WORK

GRAND SUMMARY
Bill No.01 Preliminaries LKR -

Building Work & General Finishes LKR -


Bill No.02

Bill No.03 Provisional Sum LKR -

Bill No.04 Day work LKR -

GRAND TOTAL LKR -

Ddt
Discount if any LKR

GRAND TOTAL EXCLUDING VAT LKR -

Add Value Added Tax ( VAT ) 11% LKR -

GRAND TOTAL INCLUDING VAT (DISCOUNTED) LKR -


Tender Sum

Tenderer's VAT No. (if any) ………………………………........................................................................…

Tender Amount (in words) Rupees …………………………………..............................................……………


…………………………..………………...................................………………………………………..………….

Name of Tenderer :……………………......................………………...………………………………………...…

Address :……………...…......................................…………...…………...…………………………………….
……………………......................................……...…………………………………………………..

Signature and Seal :

Witnesses :-

1. Signature : ……….......…………………… 2. Signature : ………...............................……………

Name: ……………..............……………… Name: …………………………............................…


Address :……………...…...…………...…… Address ................…………………………………….
…………………….……...………… ……………...………………….............……..
BI LLS OF QUAN TITIES

BILL NO. 01 - PRELIMINARIES

PROJECT :PROPOSED HOUSE Ms. GUNASEKARA NO 30, SANGAMITTA AVENUE AT


MOUNT LAVINIA

MARCH 2016
Bill No.01-Preliminaries Bill of Quantities - Package 02. Civil Work Page No - B01-4

BI LLS OF QUAN TITIES

PROJECT :PROPOSED HOUSE Ms. GUNASEKARA NO 30, SANGAMITTA AVENUE AT MOUNT LAVINIA

BILL NO.01 - PRELIMINARIES

Rate Amount
Item Description Qty Unit
LKR LKR

2A BILL NO. 01 - PRELIMINARIES

Notes

If no price has been stated against any item


hereunder the Contractor will not be entitled
to claim any money for such items even
though he is obliged to execute the work or
provide services described therein.
Preliminary items priced by the Tenderer are
deem to include the cost of unpriced items
Note

The Tenderer shall read, understand and


acquaint himself with the requirements in the
conditions of contract Parts I & II, General
Specification of work, particular Specification
of work, Instruction to Tenderers, Bidding,
Data, Tender Form, Appendix to Tender and
preamble notes. It is the Tenderer's
responsibility to see that his price include for
complying with all the above requirements
whether specifically referred to in this bills of
quantities or otherwise.
Note

The Tenderer is required to visit the site of


the proposed work, as it is his responsibility
to ascertain the conditions governing access
to the site, the external working space,
storage area etc., Note

Cost and expenses in connection with any


other preliminary item which is not listed
below, but is necessary for the due
completion of works, is deemed to be
included in the tender rates. Note

Mechanical plant and equipment which emits


excessive noise, smoke, fumes, obnoxious
gases etc., will not be allowed to be 'used in
the Site, without the prior approval of the
Engineer. Note

The contractor shall be responsible for any


loss or damage to the works, existing
structures, adjoining structures and unfixed
materials. Note
Bill No.01-Preliminaries Bill of Quantities - Package 02. Civil Work Page No - B01-5
Rate Amount
Item Description Qty Unit
LKR LKR

The contractor shall be responsible for


providing necessary lighting, watchmen, and
other suitable security measures during
construction until handing over. Note

Fixed Charges

2A.1 Allow for clearing of site including removing


all trees, bushes etc. 1 item

2A.2 Allow for setting out of works by a


Government registered licensed surveyor
together with a qualified person in
accordance with drawings liaise with client to
establish exact boundaries and other written
information given by the Engineer and obtain
written approval from the Relevant
Government authorities for setting out, street
and building lines before commencements of
construction. Also to make an maintain
permanent bench marks of the setting out
and obtain of C.O.C from the Local Authority.
The checking of any setting out or of any line
or level by the Engineer shall not in any way
relieve the Contractor of his responsibility for
the accuracy thereof.
1 item

2A.3 Allow for supplying temporary electricity


for the Works and facilities of the contractor
including 'connection, distribution system for
the work, internal arrangements and all
payment to the authorities for connections. It
is the responsibility of the Contractor to
ensure steady and uninterrupted power
supply to Works. The Contractor shall not be
entitled to claim and the Employer shall not
pay cost incurred by the Contractor for using
electric power generators or for using other
alternative power supply method in case
there happened to be disruptions to normal
power supply due to any reason. 1 Item Not Applicable

2A.4 Allow for provision of water connection for


the works including drinking water, and
paying all charges and other expenses in
connection with the supply from water mains
or any other alternative method of water
supply, storage and distribution. It is the sole
responsibility of the contractor to ensure
steady, uninterrupted adequate supply of
water required for main contract and
nominated sub contract work. 1 item Not Applicable

Page Total Carried to Collection LKR -


Bill No.01-Preliminaries Bill of Quantities - Package 02. Civil Work Page No - B01-6
Rate Amount
Item Description Qty Unit
LKR LKR

2A.5 Allow for providing a telephone and


facsimile facilities to Engineer's site office
for the use in connection with the Contract. 1 item Not Applicable

2A.6 Allow for providing and maintenance of name


board and advertising board to the
specifications and as directed by the
Engineer. Refer detail drawing. 1 item Not Applicable

2A.7 Allow for constructing, and dismantling (after


practical completion of work) a temporary
site office of adequate size with required
facilities for the contractor's site
management staff in accordance with the
plans prepared by the Contractor and
approved by the Engineer.
(office layout and list of facilities should be
submitted by the bidder along with his bid)

1 item

2A.8 Allow for constructing temporary building or


buildings in accordance with the plans
prepared by the Contractor and approved by
the Architect to accommodate the following
1 item
(i) Workers' rest room, canteen facilities/
foods facilities
(ii) Toilet and wash areas,
The price shall include for construction and
dismantling of above, on completion.
Note
Facilities to workman shall conform to the
latest Public Health and Industrial
Regulations. Note

2A.9 Allow for constructing, and dismantling (after


practical completion of work) a temporary
site office of adequate size with required
facilities for the use of the Engineer in
accordance with the plans prepared by the
Contractor and approved by the Engineer.
(office layout and list of facilities should be
submitted by the bidder along with his bid)

1 item Not Applicable

2A.10 Provision of furniture and office requisites for


the use of the Engineer. The furniture and
office requisites provided shall be property of
the contractor and it shall be taken back by
the contractor after completion of the
contract. (Please attach a list of items.)
1 item Not Applicable

2A.11 Allow for temporary hoarding and fencing of


the contractor's office, yard and Engineer's
office premises as required. 1 item Not Applicable

Page Total Carried to Collection LKR -


Bill No.01-Preliminaries Bill of Quantities - Package 02. Civil Work Page No - B01-7
Rate Amount
Item Description Qty Unit
LKR LKR

2A.12 Allow for maintaining daily records in the


manner required by the Engineer to indicate
factual details of: 1 item

(i) Number of workmen in different


categories and the number of Foremen.
Note
(ii) Particulars of materials and goods
brought to the site. Note
(iii) Particulars of machinery & equipment
brought to or taken out of site.
Note
(iv) Rain fall records. Note

Bonds & Guarantees

2A.13 Allow lump sum for provide and maintain a


performance guarantee to the value equal
to 5% of the contract price from a bank/
Insurance company acceptable to the Lump
Employer. Sum

2A.14 Allow lump sum for provide and maintain a


mobilization advance payment guarantee
to the value equal to 10% of the effective
contract price. from a bank/ Insurance
company acceptable to the Employer. Lump
Sum

2A.15 Allow lump sum for obtain and maintain


insurance policies issued by an insurance
organization in Sri Lanka acceptable to the
Employer conforming the requirement
stipulated in Clauses 21,22, 23 & 24 in the
General Conditions of Contract. The
insurance policies shall be valid up to the end
of Defects Liability Period. Lump
Sum

2A.16 Allow for all cost in connection with


preparing samples for testing, making
arrangements for testing of materials, goods
etc., as stipulated in the Specification,
obtaining test reports & submitting same to
the ER. (This item intends to cover all
expenses incurred by the contractor in
connection with sampling and testing of
materials, goods etc., required by the
specifications, other than those provided for
in the bills of quantities.)
1 item

Page Total Carried to Collection LKR -


Bill No.01-Preliminaries Bill of Quantities - Package 02. Civil Work Page No - B01-8
Rate Amount
Item Description Qty Unit
LKR LKR

2A.17 Allow for removal of rubbish and debris


cleaning and clearing up site on
completion, leaving all in good order in
handing over. 1 item

2A.18 Allow for preparing and submitting to


Engineer in sufficient number of copies the
Programme of work referred to in the
Conditions of Contract. The Programme
shall be updated or revised as required by
the Engineer. 1 item Not Applicable

Time-Related Charges

2A.19 Allow for maintenance, during the entire


period of Contract, of Site Office, furniture
and office requisites as listed in for the use of
the Engineer. The furniture and office
requisites provided shall be property of the
contractor and it shall be taken back by the
contractor after completion of the contract.
3 Month

2A.20 For reimbursement of all payments to the


authorities for consumption of Electricity or
the fuel cost for the Generators ( Ref. Item
No. 1.A.3). 3 Month -

2A.21 Maintain the water supply facilities


(provided under Item No. 1.A.4) , facilities
including making payments for bills and other
monthly charges to any other organization in
connection with the satisfactory supply.
3 Month

2A.22 Allow for payment of monthly bills of


telephone and facsimile facilities to
Engineer's site office for the use in
connection with the Contract (Item No. 1.A.5
). 3 Month Not Applicable

Page Total Carried to Collection LKR -


Bill No.01-Preliminaries Bill of Quantities - Package 02. Civil Work Page No - B01-9
Rate Amount
Item Description Qty Unit
LKR LKR

2A.23 Allow for maintaining site. The Contractor


shall be responsible for maintaining the site
in clean and orderly fashion at all times and
during the entire contract period. Materials,
casing etc., shall be kept neatly stacked on
the site with all access-ways kept clear. All
dust, debris and rubbish etc., arising out of
his own works shall be continually cleared
and removed from the site. The Engineer's
Representative shall make a percentage of
the monthly rate or shall completely suspend
the monthly amount if the contractor's
maintenance found to be unacceptable. The
burning of rubbish and debris on site will not
be allowed under any circumstances. The
Contractor is to make certain that his
workmen do not burn anything on site.

3 Month

2A.24 Allow for maintaining a temporary site


office with required facilities for the
contractor's site management staff in
accordance with the plans prepared by the
Contractor and approved by the Engineer.
(office layout and list of facilities should be
submitted by the bidder along with his bid)

3 Month

2A.25 Allow for maintenance of Workers' rest


room, canteen facilities and Toilet and wash
areas. Employing workmen to clean and
maintain wet areas including toilets, wash
areas, kitchen etc. (Item No. 1.A.8),
supplying adequate drinking water, water for
washing purposes, soap detergent etc.
throughout the period of construction.
3 Month Not Applicable

2A.26 Allow for submission of three ( 03) copies of


progress reports each with five ( 05 )
photographs monthly covering all major
activities taken place during that period and
adequate no of photograph to monitor the
progress. 3 Month Not Applicable

2A.27 Submission of one copy of weekly and


monthly break-up programmes to the
Engineer for progress monitoring purposes.
3 Month Not Applicable

Page Total Carried to Collection LKR -


Bill No.01-Preliminaries Bill of Quantities - Package 02. Civil Work Page No - B01-10
Rate Amount
Item Description Qty Unit
LKR LKR

2A.28 Allow for providing all necessary safety


measures to workmen. The bidder should
submit his comprehensive safety plan with
engaging the services of an adequately
trained person to attend to first aid medical
duties including a provision of a first aid box,
regular supply of medicine, linen and safety
equipment for the client and the staff. Hard
hats, goggles, safety boots and temporary
fire protection for all levels (fire
extinguishers), etc. and providing experience
safety officer including all necessary safety
measures to workman at site conforming to
the latest industrial safety regulations and as
directed by the engineer. The Engineer's
Representative has the right to pay a
percentage of the monthly component to suit
the percentage accomplishment of this safety
plan.
3 Month

2A.29 Allow for employing suitably qualified and


experienced technical personnel on full
time basis for contract and proper execution
of contract work at the site. The Contractor
shall employ such technical personnel as
specified in the Conditions of Contracts. This
item shall cover all salaries and other
payments for all technical personnel above
the grade of work supervisor, earmarked to
be employed by the contractor for the
execution of the works. Salaries of all labour
supervisor and below are deemed to be
included under the unit rates of the work
items.
3 Month -

2A.30 Allow sum for providing all necessary security


measures to staff members and worker's
including obtaining 3 Month Not Applicable

2A.31 Allow sum for providing small machinery and


equipment for the use of the Works at site.
3 Month -

2A.32 Allow sum for erecting and maintaining


scaffolding and/or self climbing flat forms
such scaffoldings etc. shall be removed on
completion and all Works disturbed shall be
made good including all sub contractors/sub
bidder's requirement/usage.
3 Month

Page Total Carried to Collection LKR -


Bill No.01-Preliminaries Bill of Quantities - Package 02. Civil Work Page No - B01-11
Rate Amount
Item Description Qty Unit
LKR LKR

2A.33 Allow for hoisting equipment including


temporary dual hoists on the external of the
building complete with operator etc. must be
provided for the all subcontractors and other
contractors as requested.
3 Month

2A.34 Allow a sum for a Tower Crane with a lifting


capacity of 6T minimum with full coverage of
the site, including crane base. Must be
provided for the all subcontractors and other
contractors as requested.
32 Month Not Applicable

2A.35 Allow for any other preliminary items which 1 Item


(1) ……………………………………………

(2) ……………………………………………

(3) ……………………………………………

Page Total Carried to Collection LKR -


Bill No.01-Preliminaries Bill of Quantities - Package 02. Civil Work Page No - B01-12
Rate Amount
Item Description Qty Unit
LKR LKR

COLLECTION

Page B01/2 -

Page B01/3 -

Page B01/4 -

Page B01/5 -

Page B01/6 -

Page B01/7 -

Page B01/8 -

Page Total Carried to Preliminary Collection LKR -


BI LLS OF QUAN TITIES

PROJECT :PROPOSED HOUSE Ms. GUNASEKARA NO 30, SANGAMITTA AVENUE AT


MOUNT LAVINIA

BUILDING WORKS

MARCH 2016
Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-14
BI LLS OF QUAN TITIES (PACKAGE-02)

PROJECT :PROPOSED HOUSE Ms. GUNASEKARA NO 30, SANGAMITTA AVENUE AT MOUNT LAVINIA

BILL NO.02 - BUILDING WORKS & GENERAL FINISHES

Rate Amount
Item Description Qty Unit
LKR LKR

Bill No. 02 - Building Work & General Finishes

2B Demolition, Excavation and Earth Work

Unless other wise stated, Rate shall include for


Note

a) back filling with selected excavated material &


consolidating. Surface treatment; compaction
before filling / foundation. Note

b) disposal of surplus soil as directed & keeping


all excavations free from water unless other wise
measured separately. Note

c) any additional excavation for working space.


Note

2B1 Demolition & Site Clearing

2B1.1 Demolition of existing building including


removing foundations, under ground structures,
service lines etc. Clearing and removal of all
debris as directed. 1.00 item

2B1.2 Clearing and preparation of the site including


cutting down & uprooting unwanted trees and
removal of top soil up to a depth of 150mm and
extend up to 3m beyond the outer walls of the
building & disposed off as directed. m2 Not applicable

2B2 Excavation & Earthwork Supports

2B2.1 Excavation of pits for column foundations up to


1.5m deep in any material except rock requiring
blasting and part return fill in and ram and
removal of surplus as directed. 3.00 m3

2B2.2 Excavation of trenches for strip, wall


foundations up to 3m deep in any material
except rock requiring blasting and part return fill in
and ram and removal of surplus as directed.
18.00 m3

Page total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-15
Rate Amount
Item Description Qty Unit
LKR LKR

2B2.3 Excavation of trenches for Stair case


foundations up to 1.5m deep in any material
except rock requiring blasting and part return fill in
and ram and removal of surplus as directed.
5.00 m3

2B2.5 Allow Lump sum for design, erecting, maintain


and removing a suitable shoring system (Design
and built system by the Contractor) in a manner
acceptable to the Consultant. The tenderer shall
submit all details of his proposal indicating all
technical details with the tender to the approval of
the Engineer/ Consultant.
1.00 Item Not applicable

2B3 Disposal

2B3.1 Allow Lump sum for disposal of surface water


keeping all excavations and other working areas
free from rain / ground water and percolating
water by pumping or otherwise until completion of
works. 1.00 Item

2B4 Dewatering

2B4.1 Allow provisional sum for design, establish and


maintain a suitable dewatering system in a
manner acceptable to the Consultant for surface
water and ground water as necessary. The
tenderer shall submit all details of his proposal
indicating all technical details with the tender to
the approval of the Consultant. (only for
excavation and earth works) 1.00 Item Not applicable

2B4.2 Provisional quantity for disposal of excavated


materials within site including stacking &
providing proper covering, as directed by the
Engineer. 26.00 m3

2B4.3 Provisional quantity for disposal of excavated


materials off site in an approved dumping yard,
as directed by the Engineer. m3 Not applicable

Page total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-16
Rate Amount
Item Description Qty Unit
LKR LKR

2B5 Filling & Back filling

2B5.1 Filling under staircase foundation for ground


improvement with approved quality filling
material available at site. Rate shall include for
spreading, watering and well ramming in 150mm
layers. 2.00 m3

2B5.2 Filling under ground slab with compacted gravelly


earth fill. m3 Not applicable

2B5.3 Filling under ground slab with 50mm thk


compacted sand fill . m3 Not applicable

2B6 Ant termite treatment

Anti termite treatment the ground covered by


floor slabs and approx. 1500mm around the
building. Work shall be entrusted to a reputed
pest control sub contractor. Particulars of
chemicals used and their concentration shall be
forwarded to the Engineer for approval. The
contractor shall furnish the client with a joint
guarantee binding the specialist sub contractor
and the contractor as to the effectiveness of the
anti termite treatment for a period of 10 years
after completion. The rate shall include for
precautionary measures to be taken against
chemicals being infiltrated in to the out side
area.(measured horizontal surface only)

2B6.1 Ground floor level 120.00 m2 Not applicable

Page total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-17
Rate Amount
Item Description Qty Unit
LKR LKR

COLLECTION

Page B02/1 -

Page B02/2 -

Page B02/3 -

2B Demolition, Excavation and Earth Works To Summary LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-18
Rate Amount
Item Description Qty Unit
LKR LKR

2C Concrete Work

Rate shall include for depositing, handling,


hoisting into position, vibrating, curing etc. and
making good after removal of formwork etc.
Note

Reinforcement & Form work paid for separately


unless otherwise specified in the item.
Note

Rate shall include for supplying and laying of


gauge 1000 polythene on ground, where concrete
is in direct contact with ground, before pouring
concrete unless other wise measured separately.
Note

2C1 In Situ Concrete

Bellow Ground Level

Concrete grade - C15

50mm thick lean concrete under:

2C1.1 In Stair-case foundation 0.81 m2

100mm thick mass concrete under:

2C1.2 Under Wall Foundation 2.00 m3

Concrete grade - G30 (25mm agg)

2C1.3 In Ground floor supported slab 1.50 m3

2C1.4 In Staircase footing 0.12 m3

2C1.5 In Staircase shaft 0.19 m3

2C1.6 In tie beam 1.69 m3

Page Total Carried to Concrete Work Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-19
Rate Amount
Item Description Qty Unit
LKR LKR

Above Ground Level

From Ground Floor Level to First Floor Level

Concrete grade - G25 (20mm agg)

2C1.7 In1st floor slab 1.00 m3 -

2C1.8 In Beams 1.00 m3 -

2C1.9 In Staircases, Staircase landings & landing


beams 1.00 m3 -

2C1.10 Lintel size 150 x 150 mm in cross section,


including necessary reinforcement and forming
work, as per detail. 16.00 m -

From First Floor Level to Second Floor Level

Concrete grade - G25 (20mm agg)

2C1.11 In 2nd floor slab 20.00 m3 -

2C1.12 In Columns 3.00 m3 -

2C1.13 In Beams 12.50 m3 -

2C1.14 In RCC Fascia m3 Not Applicable

2C1.15 In Work top & vanity tops 0.46 m3 -

2C1.16 In Staircases, Staircase landings & landing


beams 1.00 m3 -

Page Total Carried to Concrete Work Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-20
Rate Amount
Item Description Qty Unit
LKR LKR

2C1.17 Lintel size 150 x 150 mm in cross section,


including necessary reinforcement and forming
work, as per detail. 27.00 m -

From 2nd Floor Level to Third Floor Level

Concrete grade - G25 (20mm agg)

2C1.18 In 3rd floor slab 1.00 m3 -

2C1.19 In Columns 2.00 m3 -

2C1.20 In Beams 10.00 m3 -

2C1.21 Lintel size 150 x 150 mm in cross section,


including necessary reinforcement and forming
work, as per detail. 15.00 m -

Page Total Carried to Concrete Work Collection LKR

COLLECTION

2C1 - In Situ Concrete

Page B02/5 -

Page B02/6 -

Page B02/7 -

Page Total Carried to Concrete Work Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-21
Rate Amount
Item Description Qty Unit
LKR LKR

2C2 Form Work

Rate for form work to be included for all


necessary boarding, supports, erecting, framing,
cutting angles, cleaning, wetting and any surface
treatment before and after placing of concrete.
Note

Basic finish Form Work ( according to ICTAD


classification & specification) Note

Below Ground level

2C2.1 Sides of wall foundation 5.63 m2 -

2C2.2 Sides of staircase shaft 2.00 m2 -

2C2.3 Sides of staircase footing 0.68 m2 -

Above Ground Level

Smooth Fair Face Plain finish Form Work (


according to ICTAD classification & specification)
Note

From Ground Floor Level to First Floor Level

2C2.4 Soffits of 1st floor slab 8.00 m2 - -

2C2.5 Sides of 1st floor slab 4.00 m

2C2.6 Sides and Soffit of beam 10.00 m2 - -

2C2.7 Sides of staircases including riser 8.00 m2 - -

2C2.8 Slopping soffit of the staircase 5.60 m2 - -

2C2.9 Sides and soffit of staircase landing 2.30 m2 - -

Page total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-22
Rate Amount
Item Description Qty Unit
LKR LKR

From First Floor Level to 2nd Floor Level

2C2.10 Soffits of 2nd floor slab 158.00 m2 - -

2C2.11 Sides of 2nd floor slab 4.00 m

2C2.12 Sides and soffit of beam 112.00 m2 - -

2C2.13 Sides of column 24.00 m2 - -

2C2.14
Sides of vanity tops 0.84 m2 - -
2C2.15
Soffit of vanity tops 2.00 m2 - -
2C2.16
Sides of staircases including riser 8.00 m2 - -
2C2.17
Slopping soffit of the staircase 5.60 m2 - -
2C2.18
Sides and soffit of staircase landing 2.30 m2 - -

From 2nd Floor Level to 3rd Floor Level

2C2.19 Soffits of 3rd floor slab 8.00 m2 - -

2C2.20 Sides and soffit of beams 93.00 m2 - -

2C2.21 Sides of column 23.00 m2 - -

Page total Carried to Collection LKR -

COLLECTION

2C2 - Formwork

Page B02/9 -

Page B02/10 -

Page total Carried to Formwork Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-23
Rate Amount
Item Description Qty Unit
LKR LKR

2C3 Reinforcement

Rate to include for supplying, cleaning, cutting,


bending, fabricating, placing and the provision of
all necessary temporary fixings and supports etc.
including binding wires, bends, hooks, tying wires,
ms chairs, distance blocks, steel separators /
spacers etc. (designed laps are included in
quantities) Note

It shall be the responsibility of the Contractor to


calculate the actual reinforcement requirement
based on the construction drawings before
placing the purchase order. Note

Tor steel reinforcement (to BS 4449 and


characteristic strength fy = 460N/mm2) Note

Mild steel reinforcement (to BS 4449 and


characteristic strength fy = 250N/mm2) Note

Below Ground level

2C3.1 In Ground floor suspended slab 150.00 kg

2C3.2 In Staircase footing 18.23 kg

2C3.3 In Staircase shaft 24.57 kg

2C3.4 Ti beam 253.13 kg

Page total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-24
Rate Amount
Item Description Qty Unit
LKR LKR

Above Ground Level

From Ground Floor Level to First Floor Level

2C3.5 In1st floor slab 150mm 85.00 kg -

2C3.7 In Beams 180.00 kg -

2C3.9 In Staircases, Staircase landings & landing


beams 90.00 kg -

From First Floor Level to Second Floor Level

2C3.10 In 2nd floor slab 1,700.00 kg -

2C3.11 In Columns 300.00 kg -

2C3.12 In Beams 2,187.50 kg -

2C3.14 In Work top & Vanity tops 27.60 kg -

2C3.15 In Staircases, Staircase landings & landing


beams 90.00 kg -

From 2nd Floor Level to Third Floor Level

2C3.16 In 3rd floor slab 85.00 kg -

2C3.17 In Columns 300.00 kg -

2C3.18 In Beams 1,500.00 kg -

Page total Carried to Collection LKR -

COLLECTION

2C3 - Reinforcement

Page B02/12 -

Page B02/13 -

Page Total Carried to Concrete Work Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-25
Rate Amount
Item Description Qty Unit
LKR LKR

COLLECTION

2C: CONCRETE WORK

IN SITU CONCRETE (Page 08) -

FORMWORK (Page 11) -

REINFORCEMENT (Page 14) -

2C Concrete Work To Summary LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-26
Rate Amount
Item Description Qty Unit
LKR LKR

2D Masonry Work

Rate shall include for lifting, handling, weighting


all rough and fair cutting, plumbing angles, normal
straight cutting, forming rebated reveals and
raking out joints for plastering.
Note

Rate shall include for reinforced concrete vertical


and horizontal stiffeners for all 150mm and
112.5mm wall exceeding 3m length and 3m in
height. Note

2D1 Random Rubble Masonry Work

Up to DPC level

2D1.1 6" x 9" Random rubble masonry work in cement


sand (1:5) mortar in wall foundations &
necessary other places. 10.80 m3 -

2D2 Brick Work

225 mm thick brick walls in 1:5 cement sand


mortar as per the drawings and specification.

2D2.1 Ground floor level 108.00 m2 -

2D2.2 1st floor level 121.00 m2 -

2D2.3 2nd floor level 200.00 m2 -

Supporting walls

Work Top, Vanity & counter supporting walls


comprising of 112.5x 750mm high masonry wall in
common brick in 1:5 cement sand mortar. Rate
shall include for plastering and painting all as per
drawing and specification.

2D2.12 1st floor level 1.00 m2 -

2D2.13 2nd floor level 1.00 m2 -

Page Total Carried to Collection LKR -

COLLECTION

Page B02/17 -

2D Masonry Work To Summary LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-27
Rate Amount
Item Description Qty Unit
LKR LKR

2E Water Proofing & Thermal Insulation

Notes:
Contractor shall refer to the detail drawings and
specifications before pricing. Note

Contractor is supposed to furnish all technical


details, samples and any other related literature
available along with the quotations, to the
Engineer for his approval. Note

Water proofing treatments to be done by a


specialized supplier and provide a 10 year
Guarantee acceptable to the Engineer, &
supplier to be approved by the Engineer before
the procurement. Note

Unless otherwise measured separately Rate shall


include for Note

Water proofing treatments, over well cleaned and


exposed structural floors with approved materials
by the Engineer. Note

Applying of water proofing to walls upto a


minimum, height of 60 cm from the floor. Note

Applying 1:3 cement sand rendering protective


screed thickness not less than 12mm, as per the
drawings and specifications, angle fillets, surface
finished with smooth neat cement finish and
maintaining of necessary slopes for the floors.
Note

Extra over for apply water proofing around pipe


and pipe fittings Note

2E1 Damp Proof Course

2E1.1 Horizontal damp proof course width more than


300mm; consisting with two coats of approved
bituminous material and blinded with river sand
on and including 20mm thick cement and sand
(1:3) screed on rubble foundations.
45.00 m2 -

2E2 Damp Proof Membrane

2E2.1 1000g Polythene damp proof membrane under


floors and where excavated surfaces are in
contact, with minimum 150 mm (6") end and side
laps, measured net. 8.00 m2 -

Page Total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-28
Rate Amount
Item Description Qty Unit
LKR LKR

2E3 Water Proofing in Toilets

Water proofing treatments, over well cleaned and


exposed structural floors in toilet with 'Barrelastic'
or equivalent, approved by the Employer's
Representative. Rate shall include for applying of
water proofing to walls up to a minimum height of
100mm from the floor.

Barrelastic or equivalent Water proofing agent of


approved quality, applied according to
manufacturers specifications to horizontal
surfaces of toilet floors.

2E3.1 Ground floor level 15.00 m2 -

2E3.1 1st floor level 17.00 m2 -

2E3.2 2nd floor level 7.00 m2 -

Barrelastic or equivalent Water proofing agent of


approved quality applied according to
manufacturers specifications to vertical surfaces
of toilet walls.

2E3.3 Ground floor level 53.00 m2 -

2E3.3 1st floor level 68.00 m2 -

2E3.4 2nd floor level 23.00 m2 -

Water Proofing in Balcony area


Barrelastic or equivalent Water proofing agent of
approved quality, applied according to
manufacturers specifications

2E3.5 1st floor level 8.00 m2 -

2E3.6 2nd floor level 2.00 m2 -

Water Proofing in roof slab

2E3.11 Barrelastic or equivalent Water proofing agent of


approved quality, applied according to
manufacturers specifications
75.00 m2 -

Page Total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-29
Rate Amount
Item Description Qty Unit
LKR LKR

COLLECTION

Page B02/18 -

Page B02/19 -

2E Water Proofing To Summary LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-30
Rate Amount
Item Description Qty Unit
LKR LKR

2G Roof Covering & Roof Plumbing

Rate shall include for all rivets, nails, clips, strips


and the like and delivering and fixing in position.
Note

Roof plumbing shall be measured & grouped


separately. Note

2G1 Roof Covering & Canopy

Quantity comprising with roof area and pergola


Note

2G1.1 Supplying & fixing of approved colour 0.47 mm


thk. Zn/Al sheet roofing sheet on structural steel
portal frame structure & galvanized steel purlins
with necessary fasteners and other fixing
arrangements including capping on and including
gable sides of the roof covering. (Portal frame
structure & galvanized steel purlins measured and
paid separately)
105.00 m² -

2G2 Insulation

2G2.1 Supply and Installation of 12mm thick Heat


insulation sheets with form type with 50mm
glasswool, double sided laminating of aluminum
foil / metalized thermally expanded polyethylene
sheet fixed to roof frame work (measured)
including GI mesh and necessary fixing
accessories, all as per detail and manufacturer's
specifications. (Samples should be approved by
the Employer).
105.00 m² -

2G3 Roof Plumbing

2G3.2 Supplying & fixing of type 600 uPVC 225mm dia.


rain water down pipe, fixed to column with uPVC
clips and screws, complete with all necessary
specials & accessories 45.00 m -

2G3.3 Supplying & fixing of 200mm x 100mm Zn/Al


square gutters, fixed to valance board (measure)
with necessary screw and washers, all as per
detail drawings. Rate shall include for all
necessary accessories. 20.00 m -

2G Roof Covering & Roof Plumbing To Summary LKR


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-31
Rate Amount
Item Description Qty Unit
LKR LKR

2H Metal Work

The work shall include supply, fabricate and


installation of doors, windows and partitions as
per the given drawings & specifications. Note

It shall be the Contractor's responsibility to check


the sizes of all openings on site, prior to
fabrication. Note

The contractor shall submit shop drawings for the


approval of the Engineer, prior to fabrication.
Note

The contractor shall refer to all relevant


specifications and drawings prior to pricing and it
shall be his responsibility to complete the said
works to the entire satisfaction of the Engineer at
no additional cost. Note

All samples shall be provided for approval by the


Engineer prior to purchase of material. Note

Frame sizes shall be as shown on the drawings.


Note

Rates for all door and windows shall unless


otherwise measured separately include for: Note

All necessary locks and ironmongery of approved


make as specified to match the doors and
windows. Note

All exposed steel metal shall include for two coats


of anti-corrosive and two coats of approved
enamel colour paint all as per Specification and
detail drawing. Note

Approved weather strip, mastic sealant, pointing,


caulking, jointing, backing, door closer etc., as
specified. Note
Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-32
Rate Amount
Item Description Qty Unit
LKR LKR

2H1 Doors

Refer the updated door schedules and door


sections drawings for the door sash,frame and rail
details. Note

Powder coated Aluminum Frame Doors

Glass panelled door, Type D5, 1825 x 2100mm


over all size with 12mm thick toughen glass
with double slash. Rate shall include for fixing of
all necessary locks, door closer, handles, iron
mongery, final finish as per Drawings &
Specifications.

2H1.1 Total Nos (2 No.) 7.67 m2 -

Sliding Aldoor window, Type DW1, 1075 x


2100mm over all size with 12mm thick toughen
glass . Rate shall include for fixing of all
necessary locks, door closer, handles, iron
mongery, final finish as per Drawings &
Specifications.

2H1.3 Total Nos (1 No.) 2.26 m2 -

Sliding Aldoor window, Type DW2, 1825 x


2100mm over all size with 12mm thick toughen
glass . Rate shall include for fixing of all
necessary locks, door closer, handles, iron
mongery, final finish as per Drawings &
Specifications.

2H1.6 Total Nos (6 No.) 23.00 m2 -

Sliding Aldoor window, Type DW3, 1825 x


2100mm over all size with 12mm thick toughen
glass . Rate shall include for fixing of all
necessary locks, door closer, handles, iron
mongery, final finish as per Drawings &
Specifications.

2H1.7 Total Nos (3 No.) 11.50 m2 -

Sliding Aldoor window, Type DW4, 1650 x


2100mm over all size with 12mm thick toughen
glass . Rate shall include for fixing of all
necessary locks, door closer, handles, iron
mongery, final finish as per Drawings &
Specifications.

2H1.10 Total Nos (4 No.) 13.86 m2 -

Page Total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-33
Rate Amount
Item Description Qty Unit
LKR LKR
Sliding Aldoor window, Type DW5, 2250 x
2100mm over all size with 12mm thick toughen
glass . Rate shall include for fixing of all
necessary locks, door closer, handles, iron
mongery, final finish as per Drawings &
Specifications.

2H1.10 Total Nos (1 No.) 18.90 m2 -

Sliding Aldoor window, Type DW6, 3650 x


2100mm over all size with 12mm thick toughen
glass . Rate shall include for fixing of all
necessary locks, door closer, handles, iron
mongery, final finish as per Drawings &
Specifications.

2H1.10 Total Nos (1 No.) 30.66 m2 -

Sliding Aldoor window, Type DW7, 2100 x


2100mm over all size with 12mm thick toughen
glass . Rate shall include for fixing of all
necessary locks, door closer, handles, iron
mongery, final finish as per Drawings &
Specifications.

2H1.13 Total Nos (1 No.) 13.23 m2 -

2H2 Windows

Refer the updated window schedules and window


sections drawings for the window sash,frame and
rail details. Note

Powder coated Aluminum Frame Windows

Glazed window, Type W1, 1125 x 1125mm over


all size. Rate shall include for fixing of all
necessary locks, window closer, handles, iron
mongery, final finish as per Drawings &
Specifications.

2H2.1 Total Nos (2 No.) 1.27 m2 -

Glazed window, Type W2, 600 x 900mm over all


size. Rate shall include for fixing of all necessary
locks, window closer, handles, iron mongery, final
finish as per Drawings & Specifications.

2H2.4 Total Nos (13 No.) 7.02 m2 - -

Glazed window, Type W3, 1825 x 1200mm over


all size. Rate shall include for fixing of all
necessary locks, window closer, handles, iron
mongery, final finish as per Drawings &
Specifications.

2H2.6 Total Nos (1 No.) 2.19 m2 - -

Page Total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-34
Rate Amount
Item Description Qty Unit
LKR LKR

2H4 Hand rail

Stair case hand rail,

Supplying & fixing of mild steel staircase


handrail Rate shall include for all necessary
welding, cutting, embedding, floor anchors and
Black Matt finishing as specified in the drawing
and specification. (Internally)

2H4.1 Ground floor level 9.06 m -

2H4.2 1st floor level 8.08 m -

Balcony hand rail,

Supplying & fixing of stainless steel removable


handrail with steel mesh on top surface, for
passage. Rate shall include for all necessary
welding, cutting, embedding, floor anchors and
Black Matt finishing as specified in the drawing
and specification. (externally)

2H4.5 1st floor level 16.00 m -

2H4.6 2nd floor level 13.00 m -

Page Total Carried to Collection LKR -

COLLECTION

Page B02/25 -

Page B02/26 -

Page B02/27 -

2H Metal Work To Summary LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-35
Rate Amount
Item Description Qty Unit
LKR LKR

2J Wood Work - Doors & Windows

The work shall include supply, fabricate and


installation of doors, windows, made out of
approved quality timber Teak to be finish as per
the respective specification and the drawings.
Note

Doors & Windows frame sections to be of,

Outer frame & Inner frame - 5" x 3" minimum -


Finish Size, unless otherwise stated. Note

The contractor shall submit shop drawings for the


approval of the Architect & Architect, prior to
fabrication. Note

The contractor shall refer to all relevant


specifications and drawings prior to pricing and it
shall be his responsibility to complete the said
works to the entire satisfaction of the Architect at
no additional cost. Note

All samples shall be provided for Architect's


approval prior to purchase of material. Note

Where swing doors has been specified prices


shall include for provisions of floor hinges. Note

Rates shall include;

(1)Hoisting and fixing in position, drilling and


making good. Note

(2)Brass Nails, Brass screws, glue, rawl plugs


etc,. Note

(3)Framing together all work in accordance with


the best practices. Note

(4)Priming backs & applying two coats of an


approved wood preservative before fixing. Note

(5)Final Finish; Two coat of wood preservative,


two coats of primer, two coats of wood sheen
spray paint. Note

(6) Rate to include for providing sundry items


related to the door & windows like Glass blocks
etc.. where necessary as a Architectural Feature
to the door or window.
Note

(7)Rate shall include for 5mm thick clear float


glass/ wired glass /tinted glass /translucent glass
as appropriate to suit the respective doors and
windows as shown in the drawings. Note

(8)Rate shall include for ply wood sheets of


approved colour with melamine coat on both
sides where necessary. Note

(9)Rates shall include for fixing timber frame,


door sash / window casement brass fixing
screws, lock sets with 3 keys manufactured in
Europe to be used on all doors.
Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-36
Rate Amount
Item Description Qty Unit
LKR LKR
Only 16% of moisture content are recommended
for all timber. Note

All timber shall be pressured impregnated termite


proofed, seasoned, planed timber and sand
papered by hand to have smooth finish and to
receive paint. Note

Preservative Treatment

Minimum of two application of C I C wood


preservative or approved equivalent. Note

Preservative treatment for back of door & door


frame in contact with masonry or concrete. Note

Sizes

The sizes given in the drawings and description of


Bill of Quantities are finished sizes and subject
to same permitted in the specifications.
Note

The contractor shall check the measurement of


openings physically at the site before fabricating
the doors & windows. Note

Door / window frames are twice rebated and


backed as appropriate. The sizes are as given in
the detail drawing. Note

Mullions and transoms shall be rebated or non


rebated as appropriate. The sizes are as given in
the detail drawing. Note

Finished thickness of door & window sashes sash


shall be 25mm and if there is any discrepancy in
the sizes and detail given in the drawings and Bill
of Quantities, the same given in the drawing shall
prevail. Note

Ironmongery

All the locks shall be union / yale supplied by


authorized dealer appointed by the manufacturer
& approved by the Architect.( All iornmongery
for Doors supplyied by Client)
Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-37
Rate Amount
Item Description Qty Unit
LKR LKR

All ironmongery shall be heavy quality brass of


approved European manufacture subject to
approval of the Architect, Samples for
ironmongery should be submitted for approval.
Note

Painting / Final Finish

Unless otherwise stated all surface of timber


Doors & Windows and casements and plywood
door sashes shall be applied with two coat of
wood preservative, two coats of primer, two coats
of wood sheen hand paint.
Note

2J1 Timber Doors

32mm wood work single timber sash flush panel


doors including timber frame, timber door sash
and other necessary ironmongories, and final
finish as matt finish spray paint. Rate shall include
for all necessary locks, iron mongery, final finish,
& fixing to concrete or brick work as per
Specification and drawing

2J1.1 Door type D1 (1125x 2100sized) in (2Nr) 4.73 m2 -

2J1.2 Door type D2 (925x 2100sized) in (10Nr) 19.43 m2 -

2J1.3 Door type D3 (850x 2100sized) in (9Nr) 16.07 m2 -

2J1.4 Door type D4 (750x 2100sized) in (4Nr) 6.30 m2 -

2J Wood Work - Doors & Windows To Summary LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-38
Rate Amount
Item Description Qty Unit
LKR LKR

2K Floor, Wall & Ceiling Finishes

The contractor is advised to refer to the


specification prior to pricing of this section of work
Note

The rate shall include for followings :

Angle Corner guards, where necessary as per the


drawing and specification Note

Background surfaces with 20×20mm GI mesh


where necessary as per the drawings and
specification. Note

All temporary rules, screeds, grounds etc. for


raking out joints of new brick work or hacking new
concrete for key, internal & curved angles, joints
between different surfaces arises quirks, inter
sections between curved or irregular surfaces,
etc. and all making good around pipes, sanitary
fittings & and the like. Note

All samples shall be provided for approval by the


Engineer prior to purchase of materials. Note

Plastering & Rendering

2K1 Wall Finishes

Rate shall include for reveals plastering work


where necessary. Note

15mm thick cement & sand (1:5) plaster finished


semi rough with wood float on external faces,
width less than or equals 300mm, on block /
concrete surfaces, reveals to openings

2K1.1 Ground floor level 27.53 m -

2K1.2 1st floor level 108.00 m -

2K1.3 2nd floor level 72.00 m -

15mm thick cement & sand (1:5) plaster finished


semi rough with wood float on external faces
width more than 300mm in the following including
walls, attached columns:

2K1.5 Ground floor level 65.00 m2 -

2K1.6 1st floor level 68.00 m2 -

Page Total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-39
Rate Amount
Item Description Qty Unit
LKR LKR

2K1.7 2nd floor level 220.00 m2 -

15mm thick cement sand (1:5) plaster finished


smooth with lime putty or approved equivalent on
internal faces, width less than or equals 300mm,
on block / concrete surfaces, reveals to openings.

2K1.9 Ground floor level 112.00 m -

2K1.10 1st floor level 150.00 m -

2K1.11 2nd floor level 85.00 m -

15mm thick cement lime sand (1:1:5) plaster


finished smooth with lime or approved
equivalent putty on internal faces, width more
than 300mm in followings including walls,
attached columns & reveals:

2K1.13 Ground floor level 170.00 m2 -

2K1.14 1st floor level 188.00 m2 -

2K1.15 2nd floor level 450.00 m2 -

2K2 Floor Finishes

20mm. thick cement and sand 1:3 cement sand


render smooth finish with Gray colour.

2K2.3 2nd floor level 75.00 m2 -

Internal staircase finishes

20mm. thick cement and sand 1:3 cement sand


render smooth finish with Gray colour.

2K2.5 Ground floor level 28.00 m2 -

2K2.6 1st floor level 30.00 m2 -

Page Total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-40
Rate Amount
Item Description Qty Unit
LKR LKR

Ceramic Floor Tiling

Supply and Installation and fixing of 600x300mm


size floor tiles, "Royal Ceramic" or equivalent as
approved by the Architect, approved quality &
colour, fixed with straight joints both ways in
coloured grout to match with the tile and including
25mm thick cement and sand 1:3 screed bedding
on concrete floors.

2K2.8 Ground floor level 100.00 m2 -

2K2.8 1st floor level 145.00 m2 -

2K2.9 2nd floor level 75.00 m2 -

2K3 Work top & vanity tops

Supply,Installation & Fixing of ceramic tiles,


"Royal Ceramic" or as approved by the Architect,
approved colour and quality, fixed with straight
joints both way in coloured grout to match with the
tiles and including 25mm thick cement and sand
1:3 screed bedding on concrete

2K3.1 Ground floor level 5.48 m2 -

2K3.2 2nd floor level 9.71 m2 -

2K4 Skirting

Installation and fixing of 100 mm high tile


skirting, as specified by the Architect, all as per
detail and to the approval of the Architect.

2K4.1 Ground floor level 20.80 m -

2K4.4 1st floor level 20.00 m -

2K4.5 2nd floor level 20.00 m -

2K5 Plastering

Plaster in 16 mm (5/8") thick cement, lime (or


approved equivalent ) and sand 1:1:5 and finish
smooth including forming narrow widths, arises
etc. soffits of staircases.

2K5.1 Ground floor level 16.91 m2 -

2K5.2 1st floor level 14.55 m2 -

Page Total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-41
Rate Amount
Item Description Qty Unit
LKR LKR

COLLECTION

Page B02/ 38 -

Page B02/ 39 -

Page B02/ 40 -

2K Floor, Wall & Ceiling Finishes To Summary LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-42
Rate Amount
Item Description Qty Unit
LKR LKR

2L Painting

Rate shall include for preparation of surface


cleaning down, smoothing, knotting, stepping etc.
protection of floors and fitting, removing &
replacing door and window, furniture, and
cleaning windows etc. upon completion. Note

Paint shall be from CIC Master pallet form or


equivalent and approved manufacturer. Colour
combinations to be approved after inspection of
colour patches by the Architects. Note

Rate shall include for reveals painting work where


necessary. Note

Wall & Ceiling Painting

2L1 Wall Painting

Prepare and apply one coat of primer and two


coats of weather shield paint of approved
colour and quality to external faces of walls width
less than or equal 300mm for the following walls,
reveals & columns.

2L1.1 Ground floor level 27.53 m -

2L1.2 1st floor level 108.00 m -

2L1.3 2nd floor level 72.00 m -

Prepare and apply one coat of primer and two


coats of weather shield paint of approved colour
and quality to external faces of walls, column for
the following, width greater than 300mm.

2L1.5 Ground floor level 65.00 m2 -

2L1.6 1st floor level 68.00 m2 -

2L1.7 2nd floor level 220.00 m2 -

Page Total Carried to Collection LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-43
Rate Amount
Item Description Qty Unit
LKR LKR

Prepare and apply one coat of primer and two


coats of emulsion paint of approved colour and
quality to internal faces of walls, with less than or
equal 300mm for the following, reveals and
column.

2L1.9 Ground floor level 46.13 m -

2L1.10 1st floor level 286.95 m -

2L1.11 2nd floor level 189.45 m -

2L1.12 3rd floor level 250.20 m -

Prepare and apply one skim coat of (Undercoat)


gypsum plastering and one layer of primer and
two coats of emulsion paint of approved colour
and quality to internal faces of plastered walls,
columns for the following, width greater than
300mm.

2L1.13 Ground floor level 170.00 m2 -

2L1.14 1st floor level 188.00 m2 -

2L1.15 2nd floor level 450.00 m2 -

2L2 Soffit painting

Prepare and apply one skim coat (Undercoat) of


gypsum plastering and one layer of primer and
two coats of emulsion paint to all plastered
surfaces sloping soffit of stair case.

2L2.1 Ground floor level 16.91 m2 -

2L2.2 1st floor level 14.55 m2 -

2L2.3 2nd floor level 14.55 m2 -

Page Total Carried to Collection LKR -

COLLECTION

Page B02/ 44 -

Page B02/ 45 -

2L Painting To Summary LKR -


Bill No.02-Building Works Bill of Quantities - Package 02. Civil Work Page No -B02-44
Rate Amount
Item Description Qty Unit
LKR LKR

Mechanically operated panelled Roller door type


G1, high overall, comprising of mechanically
operated type Zn/Al sheet panelled door with
viewing panels, hood and locking system, Zn/Al
sheet roller mechanisum enclosure box, all
necessary ironmongery all as per the detail
drawings & schedules and finishing as
specified.(1Nr)

2Y.1 Total Nos (1 No.) 7.44 m2 -

Mechanically operated panelled Roller door type


G2, high overall, comprising of mechanically
operated type Zn/Al sheet panelled door with
viewing panels, hood and locking system, Zn/Al
sheet roller mechanisum enclosure box, all
necessary ironmongery all as per the detail
drawings & schedules and finishing as
specified.(1Nr)

2Y.21 Total Nos (1 No.) 8.64 m2 -

2Y Miscellaneous & Sundry Items To Summary LKR -


Bill No.01-Summary Bill of Quantities - Package 02. Civil Work Page No -B02-48

BI LLS OF QUAN TITIES (PACKAGE-02)

PROJECT :PROPOSED HOUSE Ms. GUNASEKARA NO 30, SANGAMITTA AVENUE AT MOUNT LAVINIA

BILL NO.02 - BUILDING WORKS & GENERAL FINISHES

SUMMARY
Amount
Description
LKR

Bill No. 02 - Building Work & General Finishes

2B Demolition, Excavation and Earth Work -

2C Concrete Work -

2D Masonry Work -

2E Water Proofing -

2F Structural Metal Works Not Applicable

2G Roof Covering & Roof Plumbing -

2H Metal Work -

2J Suspended Flat Ceiling Not Applicable

2K Floor, Wall & Ceiling Finishes -

2L Painting Work -

2M Water Supply, Sewerage & Drainage Work P.Sum

2N Electrical Installation, fire detection, security system P.Sum

2P Miscellaneous & Sundry Items Not Applicable

Summary of Bill No. 02 Carried to Grand Summary -

Total Gross Floor Area (m²)

Price per m²

Total Gross Floor Area (Sq.ft) -


Price per Sq.ft
BI LLS OF QUAN TITIES

BILL NO. 03 - PROVISIONAL SUM

PROJECT :PROPOSED HOUSE Ms. GUNASEKARA NO 30, SANGAMITTA AVENUE AT


MOUNT LAVINIA

MARCH 2016
Bill No.03-Provisional Sum Bill of Quantities - Package 02. Civil Work Page No -B03-50
BI LLS OF QUAN TITIES (PACKAGE-02)

PROJECT :PROPOSED HOUSE Ms. GUNASEKARA NO 30, SANGAMITTA AVENUE AT MOUNT LAVINIA

BILL NO.03 - PROVISIONAL SUM

Rate Amount
Item Description Qty Unit
LKR LKR

3A BILL NO. 03 - PROVISIONAL SUM

The work to be done and or materials to be


provided which is covered by the following
Provisional Sums form part of the Works and
shall be completed within the Time for
Completion for the applicable Section or
Portion of the Works. Note

Provisional Sums and the associated items


for Contractor's overheads and profit set down
below shall be deducted from the Contract
Sum and the value of work done and/or
Materials provided to which such Provisional
Sums relate shall be determined as follows:
Note

(a) In respect of those parts of the Works


described below as to be carried out by the
contractor, nominated supplier, nominated
sub contractor under the Engineers
instruction, the said value shall in each case
comprise: Note

(i) the actual amount paid or due to be paid


by the Contractor to the nominated supplier
or nominated Subcontractor, on the
instructions of the Engineer: plus Note

(ii) in respect of the associated items for


Contractor's overheads and profit set down
below, an amount being a percentage rate
of the actual amount paid or due to be paid
as aforesaid, calculated at the rate inserted
below against the applicable item.
Note

(b) In respect of those parts of the Works


not described below as to be carried out by
Nominated Supplier or Nominated
Subcontractors, the Engineer shall ascertain
and determine by measurement the value of
work done and/or Materials provided to which
the applicable Provisional Sum relates in
accordance with Clause (Valuation of
Variation Orders) of the Conditions of
Contract.
Note
Bill No.03-Provisional Sum Bill of Quantities - Package 02. Civil Work Page No -B03-51
Rate Amount
Item Description Qty Unit
LKR LKR

Those parts of the Works covered by the


following Provisional Sums are to be carried
out by the Contractor, Nominated Supplier,
Nominated Subcontractors or any other
nominated authority , as determined by the
Engineer. Note

Concrete Work

3A.1 Allow Provisional sum amount for the water


sump tank construction, work trades from
excavation upto final finish including all trades
and necessary requirement as specified by
engineer. P.Sum 1,000,000.00

3A.1.1 Contractor's overheads and profits …..%

3A.1.2 General assistance item 20,000.00

Mechanical Installation

3A.2 Allow Provisional sum amount for Roller door


motor. P.Sum 100,000.00

3A.2.1 Contractor's overheads and profits …..%

3A.2.2 General assistance item 2,000.00

3A.3 Allow Provisional sum amount for louver door


motor. P.Sum 50,000.00

3A.3.1 Contractor's overheads and profits …..%

3A.3.2 General assistance item 1,000.00

Page Total Carried to Collection LKR


Bill No.03-Provisional Sum Bill of Quantities - Package 02. Civil Work Page No -B03-52
Rate Amount
Item Description Qty Unit
LKR LKR

Electrical Installation

3A.4 Allow sum for supply and installation of


Electrical System including all MDB, SDB,
DBs, wiring & cablling, earthing, light fittings,
socket outlets, electrical fittings etc. All as per
the given detail drawing P.Sum 2,200,000.00

3A.4.1 Contractor's overheads and profits …..%

3A.4.2 General assistance item 44,000.00

3A.5 Allow sum for for Testing the total electrical


installation and submit a test certificate issued
by a chartered electrical engineer including
detail test report acceptable to the supply
authority and commissioning of the
system.(3rd party testing to approval of the
Engineer) P.Sum 25,000.00

3A.5.1 Contractor's overheads and profits …..%

3A.5.2 General assistance item 500.00

3A.6 Allow sum for CEB connection P.Sum 500,000.00

3A.6.1 Contractor's overheads and profits …..%

3A.6.2 General assistance item 10,000.00

Water Supply, Sewerage & Drainage


Installation

3A.7 Allow sum for supply and installation of Water


Supply & Drainage System including all pipes,
pipe fittings, valves, accessories,sanitory
appliances etc. All as per the given detail
drawing no. SF/TEN/MEP/CW/01 &
ISF/TEN/MEP/SD/01.
P.Sum 1,500,000.00

3A.7.1 Contractor's overheads and profits …..%

3A.7.2 General assistance item 30,000.00

Page Total Carried to Collection LKR


Bill No.03-Provisional Sum Bill of Quantities - Package 02. Civil Work Page No -B03-53
Rate Amount
Item Description Qty Unit
LKR LKR
3A.8 Allow sum for for Testing & commissioning
the entire plumbing installation by a Chartered
Mechanical Engineer and obtaining a Test
Certificate (3rd party testing to approval of the
Engineer) including all off-site and factory
testing; inspections to demonstrate
compliance with relevant standards;
operating the completed installation; and
submitting all relevant test record & authority
approval. P.Sum 25,000.00

3A.8.1 Contractor's overheads and profits …..%

3A.8.2 General assistance item 500.00

3A.9 Allow sum for Water connection to be paid to


government authority. Water Supply
connection from city main pipe line to under
ground sump including valves,flow meter etc.
P.Sum 500,000.00

3A.9.1 Contractor's overheads and profits …..%

3A.9.2 General assistance item 10,000.00

3A.10 Allow sum for installation of septic tank &


sockage pit P.Sum 500,000.00

3A.10.1 Contractor's overheads and profits …..%

3A.10.2 General assistance item 10,000.00

Loose furniture

3A.11 Allow Provisional sum amount for loose


furniture P.Sum 600,000.00

3A.11.1 Contractor's overheads and profits …..%

3A.11.2 General assistance item 12,000.00

External work

3A.12 Allow Provisional sum amount for supply and


fix angle wicket gate 1500mm width with
necessary fitting P.Sum 50,000.00

3A.12.1 Contractor's overheads and profits …..%

3A.12.2 General assistance item 1,000.00

3A.13 Allow Provisional sum amount for supply and


fix entrance gate (3500mm width), including
all necessary fittings and accessories.
P.Sum 150,000.00

3A.13.1 Contractor's overheads and profits …..%

3A.13.2 General assistance item 3,000.00

Page Total Carried to Collection LKR


Bill No.03-Provisional Sum Bill of Quantities - Package 02. Civil Work Page No -B03-54
Rate Amount
Item Description Qty Unit
LKR LKR

3A.14 Allow Provisional sum amount for landscaping


works P.Sum 300,000.00

3A.14.1 Contractor's overheads and profits …..%

3A.14.2 General assistance item 6,000.00

Page Total Carried to Collection LKR

COLLECTION

Page B03/02 -

Page B03/03 -

Page B03/04 -

Page B03/05 -

Provisional Sum To Summary LKR -


BI LLS OF QUAN TITIES

BILL NO. 04 - DAY WORK

PROJECT :PROPOSED HOUSE Ms. GUNASEKARA NO 30, SANGAMITTA AVENUE AT


MOUNT LAVINIA

MARCH 2016
Bill No.03-Day Work Bill of Quantities - Package 02. Civil Work Page No -B04-1
BI LLS OF QUAN TITIES (PACKAGE-02)

PROJECT :PROPOSED HOUSE Ms. GUNASEKARA NO 30, SANGAMITTA AVENUE AT MOUNT LAVINIA

BILL NO.04 - DAY WORK

Rate Amount
Item Description Qty Unit
LKR LKR

BILL NO.04 - DAY WORK

Notes:

The Engineer may, if in his opinion it is


necessary or desirable, issue an instruction that
any varied work shall be executed on a daywork
basis. The Contractor shall then be paid for
such varied work under the terms set out in the
daywork schedule included in the Contract and
at the rates and prices affixed thereto by him in
the Tender. Note

The Contractor shall furnish to the Engineer


such receipts or other vouchers as may be
necessary to prove the amount paid and, before
ordering materials, shall submit to the Engineer
quotations for the same for his approval.
Note

In respect of the such of the Works executed on


a daywork basis, the Contractor shall, during the
continuance of such work, deliver each day to
the Engineer an exact list in duplicate of the
names, occupation and time of all workmen
employed on such work and a statement, also in
duplicate, showing the description and quantity
of all materials and Contractor’s Plant &
Equipment's used thereon or therefore other
than Contractor’s Plant & Equipment's which is
included in the percentage addition ( If any ) in
accordance with such daywork schedule. One
copy of each list and statement will, if correct, or
when agreed, be signed by the Engineer and
returned to the Contractor.
Bill No.03-Day Work Bill of Quantities - Package 02. Civil Work Page No -B04-2
Rate Amount
Item Description Qty Unit
LKR LKR
At the end of each month the Contractor shall
deliver to the Engineer a priced statement of the
labour, materials and Contractor’s Plant &
Equipment, except as aforesaid, used and the
Contractor shall not be entitled to any payment
unless such lists and statements have been fully
and punctually rendered. Provided always that if
the Engineer considers that for any reason the
sending of such lists or statements by the
Contractor, in accordance with the foregoing
provision, was impracticable he shall
nevertheless be entitled to authorize payment for
such work, either as daywork, on being satisfied
as to the time employed and the labour,
materials and Contractor’s Plant & Equipment
used on such work, or at such value therefore as
shall, in his opinion, be fair and reasonable.

Note

Generally

The Contractor shall be paid for any part of the


Works carried out on a daywork basis in
accordance with the Contract at the rates and
percentages set down in and subject to the
provisions of this Daywork Schedule.

Time engaged in the actual works only will be


allowed. Idle time will not be allowed.

All rates in this Daywork Schedule shall be fixed


for the duration of the Contract

Labour

The following labour rates are to be applied to


the days worked and are to be all inclusive Note

A day shall mean an 8 hour day. Note

The said rates are to be based on the rates of


wages and other emoluments and expenses,
including holiday credits (if any), and insurances,
payable by the Contractor. Note

The said rates are to include, inter alia, for all


supervision, importation of labour including
transport, travelling time, fares, subsistence and
lodging allowances, operation of incentive
schemes and costs of overtime working,
guaranteed time, sick pay and any other
disbursements arising from the employment of
labour, for the use and repair of all non-
mechanical tools (including paint brushes),
sharpening of tools and use of standing
scaffolding and other Contractor's Equipment
and for overheads and profit. Note
Bill No.03-Day Work Bill of Quantities - Package 02. Civil Work Page No -B04-3
Rate Amount
Item Description Qty Unit
LKR LKR
The Tenderer shall state the rates required for
labour per day irrespective of public holidays,
week-ends, etc., required for work ordered to be
executed as Dayworks or Extra Work.
Note

Gangers and trade charge hands when working


with their gangs shall be paid for at the below
rates for labourers and the applicable craftsman Note

4.1 Labour

4.1.1 Carpenters 2.00 day -

4.1.2 Masons 2.00 day -

4.1.3 Plumbers 1.00 day -

4.1.4 Painters 1.00 day -

4.1.5 Electricians 1.00 day -

4.1.6 Bar Benders 1.00 day -

4.1.7 Welders 1.00 day -

4.1.8 Unskilled Workers 2.00 day -

4.2 Materials.

The rates for the below listed materials are to be


used for daywork or Extra Work at the site of the
works Note

The rates shall cover all the expenses such as


loading, delivery to site, unloading, storing &
protecting, profit and overheads less all trade
discounts, rebates and allowances and all cash
discounts. Note

4.2.1 Portland cement 50 Kg 10.00 bag -

4.2.2 River Sand 2.00 m3 -

4.2.3 Lime 10.00 kg -

4.2.4 Rubble 150-225 mm 10.00 m3 -

4.2.5 Cement, sand hollow blocks 400x200x100 mm 50.00 nr -

4.2.6 Cement, sand hollow blocks 400x200x150 mm 50.00 nr -

4.2.7 Cement, sand hollow blocks 400x200x200 mm 50.00 nr -

4.2.8 Formwork with sawn timber (25mm) 50.00 m2 -

4.2.9 Formwork with plywood (16mm) 50.00 m2 -

4.2.10 Mild steel 6mm 30.00 kg -

Page Total Carried to Collection LKR -


Bill No.03-Day Work Bill of Quantities - Package 02. Civil Work Page No -B04-4
Rate Amount
Item Description Qty Unit
LKR LKR

4.2.11 Reinforcement steel 30.00 kg -

4.2.12 Structural Steel 25.00 kg -

4.2.13 Concrete grade 15 5.00 m3 -

4.2.14 Concrete grade 25 5.00 m3 -

4.2.15 Concrete grade 30 2.00 m3 -

4.2.16 Concrete grade 35 1.00 m3 -

4.2.17 Concrete grade 40 1.00 m3 -

4.2.18 Plywood sheets (10mm) 25.00 m2 -

4.2.19 Plywood sheets (20mm) 25.00 m2 -

4.3 Plant and Equipment

The following rates for plant and equipment are


to be applied to the days worked and use of
such plant/equipment in good working condition .
Note

A day shall mean an 8 hour day. Note

The rates are to include all operational and


maintenance costs, fuel, oil, grease, transport to
and from site and other consumables, operator
and attendants wages, supervision, overheads
and profit. Note

Only time actually employed upon the work will


be paid for and the rates shall include for idle
time, travelling time and overtime. Note

All items of plant and equipment shall be priced.


Note

Any other plant and equipment employed but not


included below shall be priced at rates
analogous to those rates included below. Note

4.3.1 Pumping set 5.00 hr -

4.3.2 Concrete mixer 5.00 hr -

4.3.3 Vibrator 5.00 hr -

4.3.4 Motor Lorry 5 ton 5.00 hr -

4.3.5 Tractor with trailer 5.00 hr -

4.3.6 Tipper truck 5.00 hr -

4.3.7 Plate compactor 5.00 hr -

Page Total Carried to Collection LKR -


Bill No.03-Day Work Bill of Quantities - Package 02. Civil Work Page No -B04-5
Rate Amount
Item Description Qty Unit
LKR LKR

4.3.8 Jack Hammer with compressor 5.00 hr -

4.3.9 Loader and backhoe 5.00 hr -

4.3.10 Bulldozer 5.00 hr -

4.3.11 Mobile crane 5.00 hr -

4.3.12 Portable generator 5.00 hr -

4.3.13 Road roller 5.00 hr -

4.3.14 Gas cutter 5.00 hr -

4.3.15 Electric drill 5.00 hr -

4.3.16 Electric grinder 5.00 hr -

4.3.17 Welding plant 5.00 hr -

4.3.18 Compressor 5.00 hr -

Page Total Carried to Collection LKR -

COLLECTION

Page B04/3 -

Page B04/4 -

Page B04/5 -

Summary of Bill No. 01 Carried to Grand Summary LKR -

Note:
Above rates & amount are inclusive of the contractor's profit & overheads.