You are on page 1of 2

GAIL (INDIA) LIMITED

Regd. Office: 16, BhikaijiCama Place, R.K. Puram, New Delhi-110066,


India.
Tel:No.:00 91 11 26182955: FAX NO.:00 91 11 26185941

ANNEXURE-2
FORMAT FOR DAILY LOG-SHEET
DAILY LOG FOR QUALITY SURVEILLANCE JOB BY M/S. RINA INDIA PVT. LTD.
PIPELINE LAYING AND ASSOCIATED FACILITIES FOR
Project Name BOKARO-ANGUL PIPELINE PROJECT (BAPL), (30" DIA Dated: 01-06-2019
X 97.1 KM)
Location/Spread No. III Inspector In Time 9:00 AM
Name of GAIL I/C Shri. UVVS RAO ( Chief Manager) Inspector Out Time 6:00 PM
Name of RINA Inspector Mr. Shahroz Alam

A
.
Details of Job Assigned by GAIL I/C:
Contractor Name: M/S ACE PIPELINE CONTRACTS PVT.LTD
Contract No.:
P.O No.:

B
Has GAIL Provided Vehicle to Inspector as per Contract? (Yes/ No) Yes
.
C
If NO, then Total Distance (Kms.) Traveled by Inspector (Clause 4 of Price / Schedule of Rates):
.
D
Details of Job Performed by Inspector:
.

Today’s Surveillance Inspection/Monitoring details-

Contractor Name: M/S ACE PIPELINE CONTRACTS PVT.LTD


Line Pipe Material: API 5L GR X70 PSL 2
SIZE: 30”X12.5 /14.8 mm Thick

1. Monitored Trenching Excavation work at CH: 334 and found satisfactory.

3. CH: 315.000, Tie-In welding:


Monitored Free Tie-In Fit-Up, welding. Verified pre-cleaning, root gap, Electrode correctness, Pre-
heat temperature as per approved WPS, verified Welders ID card and found satisfactory. Electrodes:
E6010 (Root pass welding), E8010-P1 (Hot pass, Fill-up and Capping welding) Joint number KM-
315/T-23 welder No.15/22(Trench side/ROU side)

Observation:-

S. No. Observation Open/Closed


Plastic grating (Neoprene sheet) balance where pipeline crosses under Closed
01 high tension electric wires except some location.
End Cap were not available in lowered section at CH322/M15 to Open
02 CH323/M38. Instructions were given to make sure end caps are available
at every point

Bid Document No. / E-Tender No. 8000012893 Page 161 of 187


Alertness: NIL

Imperfections: NIL

Nonconformity (NCR): NIL

Reference Documents:
1. Specification for Mainline construction(Onshore).MEC/S/05/21/01
2. Welding Specification for Onshore Pipeline, MEC/S/05/21/02
3. API 1104
4. Work procedure for trench excavation A18-058-PLN-W1-13
5. Work procedure for Lowering & backfilling work A18-058-PLN-W1-13

SITE PHOTO GRAPH’s

Pre Heating Work at CH-315 Tie In Welding work at CH-315

GAIL
RIPL
Signature
Name SHAHROZ ALAM
Designation INSPECTION ENGINER
Date 01-06-2019