CONVENIO N°: 007-2018- PUN/VMVU/

V A L S E M DI C
M. S E M NO V
M. S E M O CT

M. S E M DI C.
NO V I E MB RE

M. S E M S E T
M SEM AGO
S E TI E MB RE

DI CI E MB RE
PROYECTO: “MEJORAMIENTO DE VIV

ME T A CUM
O CTUB RE
A G O S TO
FECHA: 8/6/2018

PRESUPUESTO ( S/. ) HOJA DE METRADOS MES: OCTUBRE 2018 METRADO SEMANAL: OCTUBRE RESUMEN DE METRADO MENSUAL VALORIZACION SEMANAL MES: SETIEMBRE VALORIZACION SEMANAL MES: OCTUBRE

PRECIO UNITARIO

PRECIO PARCIAL

MIÉRCOLES

MIÉRCOLES

MIÉRCOLES

MIÉRCOLES

MIÉRCOLES
DOMINGO

DOMINGO

DOMINGO

DOMINGO
MARTES

VIERNES

MARTES

VIERNES

MARTES

VIERNES

MARTES

VIERNES

MARTES

SEMANA 09

SEMANA 10

SEMANA 12

SEMANA 13

SEMANA 01

SEMANA 02

SEMANA 03

SEMANA 04

SEMANA 05

SEMANA 01

SEMANA 02

SEMANA 03

SEMANA 05
SÁBADO

SÁBADO

SÁBADO

SÁBADO

SEMANA 11
JUEVES

JUEVES

JUEVES

JUEVES

SEMANA 04
LUNES

LUNES

LUNES

LUNES

LUNES
M ETRADO
ITEM PARTIDAS

UNIDAD

10-Oct

11-Oct

12-Oct

13-Oct

14-Oct

15-Oct

16-Oct

17-Oct

18-Oct

19-Oct

20-Oct

21-Oct

22-Oct

23-Oct

24-Oct

25-Oct

26-Oct

27-Oct

28-Oct

29-Oct

30-Oct

31-Oct
1-Oct

2-Oct

3-Oct

4-Oct

5-Oct

6-Oct

7-Oct

8-Oct

9-Oct
01. OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES

01.01. TRABAJOS PRELIMINARES

01.01.01. CARTEL DE OBRA DE 4.00 X 2.50 und 1.00 443.97 443.97 0.02 - - - - - - - - - - - - - - - - - - - - - - - ###

01.02. TRAZO NIVELES Y REPLANTEO PRELIMINAR - - - - - - - - - - - - - - - - - - - - - ###

01.02.01. LIMPIEZA, TRAZOS, NIVELES (REPLANTEO PRELIMINAR) m2 2,342.74 1.80 4,216.93 53.24 42. 00 - - - - - 2, 236. 00 - - - - 2, 236. 00 42. 00 - - - - - - - - - - ###

01.03. SEGURIDAD Y SALUD - - - - - - - - - - - - - - - - - - - - - ###

01.03.01. EQUIPO DE SEGURIDAD INDIVIDUAL glb 44.00 83.50 3,674.00 1.00 42. 00 - - - - - 42. 00 - - - - 42. 00 42. 00 - - - - - - - - - - ###

01.03.02. EQUIPO DE SEGURIDAD COLECTIVA glb 44.00 18.80 827.20 1.00 42. 00 - - - - - - 42. 00 - - - 42. 00 42. 00 - - - - 789.60 - - - - - ###

01.03.03. SEÑALIZACION TEMPORAL DE SEGURIDAD glb 44.00 38.37 1,688.28 1.00 20. 00 - - - - - - 20. 00 - - - 20. 00 20. 00 - 268.59 - 230.22 268.59 - - - - - ###

01.03.04. CAPACITACION EN SALUD Y SEGURIDAD glb 44.00 45.00 1,980.00 1.00 - - - - - - - - - - - - - - - - - - - - - - - ###

01.04. CONTROL DE CALIDAD - - - - - - - - - - - - - - - - - - - - - ###

01.04.01. CONTROL DE HUMEDAD EN MADERA glb 44.00 5.00 220.00 1.00 2 2 1 42. 00 5.00 - - - - - 37. 00 5. 00 - - 42. 00 42. 00 - - 50.00 105.00 30.00 25.00 - - - - ###

01.04.02. CONTROL DE CALIDAD EN FABRICACIÓN DE ADOBE glb 44.00 11.00 484.00 1.00 42. 00 - - - - - - 42. 00 - - - 42. 00 42. 00 - 330.00 88.00 44.00 - - - - - - ###

02. MOVIMIENTO DE TIERRAS - - - - - - - - - - - - - - - - - - - - - ###

02.01. EXCAVACIONES - - - - - - - - - - - - - - - - - - - - - ###

02.01.01. CORTE Y NIVELACION DE TERRENO (APORTE) m3 1,639.92 22.33 36,619.41 37.27 42. 02 - - - - - 1, 566. 00 - - - - 1, 566. 00 42. 02 - - - - - - - - - - ###

02.01.02. EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) m3 391.56 25.12 9,835.99 8.90 42. 08 - - - - - 374. 50 - - - - 374. 50 42. 08 - - - - - - - - - - ###

03. CIMIENTOS - - - - - - - - - - - - - - - - - - - - - ###

03.01. CIMIENTOS CORRIDOS - - - - - - - - - - - - - - - - - - - - - ###

03.01.01. m3 382.06 116.76 44,609.33 8.68 42. 28 - - - - - 367. 00 - - - - 367. 00 42. 28 - - - - - - - - - - ###

03.01.02. CIMIENTO COLUMNA MEZCLA 1:10 + 50% P.G. (MANUAL) m3 5.50 169.57 932.64 0.13 0. 26 40. 46 0.26 - - - - - 5. 00 0. 26 - - 5. 26 40. 46 - - - - 847.85 44.09 - - - - ###

03.02. SOBRECIMIENTOS - - - - - - - - - - - - - - - - - - - - - ###

03.02.01. m3 106.95 177.06 18,936.57 2.43 42. 18 - - - - - 102. 50 - - - - 102. 50 42. 18 - - - - - - - - - - ###

03.02.02. m2 631.49 22.83 14,416.92 14.35 42. 13 - - - - - 604. 50 - - - - 604. 50 42. 13 - - - - - - - - - - ###

03.02.03. m3 2.16 274.07 591.99 0.05 - - - - - - - - - - - - - - - - - - - - - - - ###

03.02.04. m2 24.64 22.83 562.53 0.56 - - - - - - - - - - - - - - - - - - - - - - - ###

04. ESTRUCTURAS DE MADERA - - - - - - - - - - - - - - - - - - - - - ###

04.01. VIGAS COLLAR DE MADERA 3"X2" - - - - - - - - - - - - - - - - - - - - - ###

04.01.01. VIGA COLLAR DE MADERA DE 3"X2" p2 4,047.53 6.04 24,447.08 91.99 42. 00 - - - - - - 3, 864. 00 - - - 3, 864. 00 42. 00 - - 3,334.08 19,448.80 555.68 - - - - - ###

04.01.02. DINTEL DE MADERA 3"X8" p2 2,125.04 6.07 12,898.99 48.30 42. 01 - - - - - - 2, 029. 00 - - - 2, 029. 00 42. 01 - - 1,766.37 10,258.30 291.36 - - - - - ###

04.01.03. FRISO DE MADERA 1 1/2"X3" p2 744.92 6.74 5,020.76 16.93 51. 00 51. 00 51. 00 51. 00 51. 00 51 51. 00 51. 00 51. 00 34. 00 34. 00 34. 00 34. 00 17. 00 17. 00 17. 00 17. 00 17. 00 17. 00 17. 00 42. 17 306.00 289.00 119.00 - - - - 714. 00 - - 714. 00 42. 17 - - - - - 2,062.44 1,947.86 802.06 - - ###

04.02. TIJERALES Y RETICULADOS - - - - - - - - - - - - - - - - - - - - - ###

04.02.01. TIJERAL DE MADERA DE 2"X4" (Techo L=6.8 m) und 176.00 405.61 71,387.36 4.00 12. 00 12. 00 12. 00 12. 00 12. 00 12. 00 12. 00 12. 00 12. 00 8 8. 00 8. 00 8. 00 4. 00 4. 00 4. 00 4. 00 4. 00 4. 00 4. 00 42. 00 72.00 68.00 28.00 - - - - 168. 00 - - 168. 00 42. 00 - - - - - 29,203.92 27,581.48 11,357.08 - - ###

04.02.02. und 88.00 304.81 26,823.28 2.00 6 6 6 6 6 6 6 6 6 4 4 4 4 2 2 2 2 2 2 2 42. 00 36.00 34.00 14.00 - - - - 84. 00 - - 84. 00 42. 00 - - - - - 10,973.16 10,363.54 4,267.34 - - ###

04.02.03. CORREAS DE MADERA 2"X2" p2 4,703.87 6.14 28,881.76 106.91 321 321 321 321 321 321 321 321 321 214 214 214 214 107 107 107 107 107 107 107 42. 04 1,926.00 1,819.00 749.00 - - - - 4, 494. 00 - - 4, 494. 00 42. 04 - - - - - 11,825.64 11,168.66 4,598.86 - - ###

04.03. COLUMNAS Y VIGAS DE MADERA - - - - - - - - - - - - - - - - - - - - - ###

04.03.01. COLUMNA DE MADERA DE 2.8 M X 5" X 5" und 44.00 97.28 4,280.32 1.00 1.00 1.00 1 42. 00 3.00 - - - - - 39. 00 3. 00 - - 42. 00 42. 00 - - - - 3,793.92 291.84 - - - - ###

04.03.02. VIGA DE MADERA DE 2"X4" glb 44.00 72.29 3,180.76 1.00 1 1 1 42. 00 3.00 - - - - - 39. 00 3. 00 - - 42. 00 42. 00 - - - - 2,819.31 216.87 - - - - ###

04.03.03. und 44.00 19.00 836.00 1.00 - - - - - - - - - - - - - - - - - - - - - - - ###

05. COBERTURAS - - - - - - - - - - - - - - - - - - - - - ###

05.01. COBERTURAS - - - - - - - - - - - - - - - - - - - - - ###

05.01.01. COBERTURA CALAMINA 0.30mm, PINTADA m2 2,480.54 31.13 77,219.21 56.38 171. 00 171. 00 171. 00 171. 00 171. 00 171. 00 171. 00 171. 00 171. 00 114. 00 114. 00 114. 00 114 56. 00 54. 00 54. 00 54. 00 54. 00 54. 00 54. 00 42. 12 1,026.00 969.00 380.00 - - - - 2, 375. 00 - - 2, 375. 00 42. 12 - - - - - 31,939.38 30,164.97 11,829.40 - - ###

05.01.02. CUMBRERA PLANCHA GALVANIZADA 0.5mm INC/PINTADO m 361.75 19.69 7,122.86 8.22 - - - - - - - - - - - - - - - - - - - - - - - ###

05.01.03. und 88.00 300.16 26,414.08 2.00 - - - - - - - - - - - - - - - - - - - - - - - ###

05.01.04. ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO m2 5.50 22.83 125.57 0.13 - - - - - - - - - - - - - - - - - - - - - - - ###

05.01.05. m3 1.93 236.07 455.62 0.04 - - - - - - - - - - - - - - - - - - - - - - - ###

06. MUROS Y TABIQUES DE ALBAÑILERIA - - - - - - - - - - - - - - - - - - - - - ###

06.01. MUROS - - - - - - - - - - - - - - - - - - - - - ###

06.01.01. ELABORACION DE ADOBES 0.40 x 0.40 x 0.10 m (APORTE) und 36,740.00 1.31 48,129.40 835.00 42. 00 - - - - - 35, 070. 00 - - - - 35, 070. 00 42. 00 - - - - - - - - - - ###

06.01.02. und 32,736.00 0.66 21,605.76 744.00 42. 00 - - - - - 31, 248. 00 - - - - 31, 248. 00 42. 00 - - - - - - - - - - ###

06.01.03. MOLDES Y CUBIERTA PARA ADOBES und 44.00 180.00 7,920.00 1.00 42. 00 - - - - - 42. 00 - - - - 42. 00 42. 00 - - - - - - - - - - ###

06.01.04. MUROS DE ADOBE e=0.40Mt. REFORZADO m2 2,393.18 15.23 36,448.13 54.39 42. 12 - - - - - 273. 00 2, 018. 00 - - - 2, 291. 00 42. 12 1,660.07 9,138.00 16,615.93 3,320.14 - - - - - - ###

06.01.05. REFUERZO CON CAÑA EN MUROS DE ADOBE glb 44.00 118.09 5,195.96 1.00 42. 00 - - - - - 23. 00 19. 00 - - - 42. 00 42. 00 236.18 1,298.99 708.54 - - - - - - - ###

06.01.06. m2 257.71 70.82 18,251.02 5.86 - - - - - - - - - - - - - - - - - - - - - - - ###

07. REVOQUES Y REVESTIMIENTOS - - - - - - - - - - - - - - - - - - - - - ###

07.01. ENLUCIDO DE YESO - - - - - - - - - - - - - - - - - - - - - ###

07.01.01. FORJADO DE YESO SOBRE MURO DE ADOBE EXTERIOR m2 2,001.72 8.16 16,334.04 45.49 46 46 46 46 4. 04 - - 184.00 - - - - 184. 00 - - 184. 00 4. 04 - - - - - - - 1,501.44 - - ###

07.01.02. ENLUCIDO CON YESO SOBRE MURO DE ADOBE INTERIOR m2 2,749.58 20.36 55,981.45 62.49 63. 00 63. 00 63 63 4. 03 - 189.00 63.00 - - - - 252. 00 - - 252. 00 4. 03 - - - - - - 3,848.04 1,282.68 - - ###

07.01.03. m 689.92 22.92 15,812.97 15.68 - - - - - - - - - - - - - - - - - - - - - - - ###

07.01.04. ENLUCIDO DE YESO/CEMENTO SOBRE PODIOS DE ADOBE m2 62.28 28.56 1,778.72 1.42 - - - - - - - - - - - - - - - - - - - - - - - ###

07.01.05. ENLUCIDO CON YESO/CEMENTO Y BOTAGUA EN VENTANAS m2 54.21 82.68 4,482.08 1.23 - - - - - - - - - - - - - - - - - - - - - - - ###

08. CIELO RASOS - - - - - - - - - - - - - - - - - - - - - ###

08.01. FALSO CIELO RASO - - - - - - - - - - - - - - - - - - - - - ###

08.01.01. CIELO RASO CON FIBROCEMENTO Y AISLANTE TERMICO m2 1,270.10 30.97 39,335.00 28.87 87. 00 87. 00 87. 00 87. 00 87. 00 87. 00 87. 00 87. 00 87. 00 58. 00 58. 00 58. 00 58 35. 16 522.00 493.00 - - - - - 1, 015. 00 - - 1, 015. 00 35. 16 - - - - - 16,166.34 15,268.21 - - - ###

09. PISOS Y PAVIMENTOS - - - - - - - - - - - - - - - - - - - - - ###

09.01. PISOS - - - - - - - - - - - - - - - - - - - - - ###

09.01.01. m2 489.72 3.64 1,782.58 11.13 12. 000 11. 000 11. 000 11. 000 11. 000 5. 03 - - 56.00 - - - - 56. 00 - - 56. 00 5. 03 - - - - - - - 203.84 - - ###

09.01.02. m2 489.72 105.63 51,729.12 11.13 - - - - - - - - - - - - - - - - - - - - - - - ###

09.01.03. m2 436.57 7.18 3,134.57 9.92 - - - - - - - - - - - - - - - - - - - - - - - ###

09.01.04. PISO DE CEMENTO FROTACHADO e=3", F´c=140KG/CM2 m2 373.38 27.36 10,215.68 8.49
ESTADO SITUACIONAL DE EJECUCIÓN D
FECHA NOMBRE DEL
FECHA INICIAL FINAL DEL COORDINADOR
Código PNVR DEL REPORTE REPORTE DE REGIONAL
DE LA SEMANA LA SEMANA TÉCNICO

ARQ. TANIA
C-27-2019 5/27/2019 6/2/2019
ALEJANDRO
DO SITUACIONAL DE EJECUCIÓN DE LOS PROYECTOS - REPORTE

N° DE CONVENIO NOMBRE DEL NÚCLEO EJECUTOR

“MEJORAMIENTO DE VIVIENDA RURAL EN LOS CC.PP.


NE CONVENIO Nº 027-2019-PUN/VMVU/PNVR CERRILLOS, CALUTA Y OTROS - DISTRITO DE SANTA LUCÍA
- PROVINCIA DE LAMPA - DEPARTAMENTO DE PUNO”
YECTOS - REPORTE SEMANAL ACUMULADO 5/27/2019
NÚMERO DE NÚMERO DE
VIVIENDAS
TIPO DE VIVIENDAS
REGIÓN PROVINCIA DISTRITO SEGÚN
VIVIENDA DEDUCIDAS
EXPEDIENTE ACUMULADAS
TÉCNICO

PUNO LAMPA SANTA LUCIA LADRILLO 58


5/27/2019 AL 6/2/2019
MONTO APROBADO SEGÚN EXPEDIENTE TÉCNICO
NÚMERO DE MONTO TOTAL
VIVIENDAS DE DESEMBOLSO,
RESULTANTE COSTO
AUTORIZADO COSTO DIRECTO TOTAL FINANCIADO PNVR
LUEGO DE INDIRECTO
POR EL PNVR
DEDUCIR

58 - 1,529,699.48 187,690.51 1,717,389.99 1,555,461.91


EDIENTE TÉCNICO OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, MOVIMIENTO DE
SEGURIDAD Y SALUD

APORTE BENEF. TOTAL N° BEN. PRESUP. VALOR. % N° BEN.

161,928.08 1,717,389.99 54 3,088.83 2,875.81 93.10% 54


MOVIMIENTO DE TIERRAS CONCRETO SIMPLE CONCRETO

VALOR. VALOR.
PRESUP. % N° BEN. PRESUP. % N° BEN.
ACUM. ACUM.

36,448.50 33,934.76 93.10% - -


CONCRETO ARMADO TIJERALES Y RETICULADOS COBERTURA DE PLA
GALVAN

VALOR. VALOR.
PRESUP. % N° BEN. PRESUP. % N° BEN.
ACUM. ACUM.

- - - -
COBERTURA DE PLANCHA CORRUGADA CIELO RASOS DE FIBROCEMENTO MUR
GALVANIZADA

VALOR. VALOR.
PRESUP. % N° BEN. PRESUP. % N° BEN.
ACUM. ACUM.

- - - -
MUROS REVOQUES ENLUCIDO

VALOR. VALOR.
PRESUP. % N° BEN. PRESUP. % N° BEN.
ACUM. ACUM.

- - - -
ENLUCIDO DE YESO PISOS VERE

VALOR. VALOR.
PRESUP. % N° BEN. PRESUP. % N° BEN.
ACUM. ACUM.

- - - -
VEREDAS ZOCALOS Y CONTRAZOCALOS PUER

VALOR. VALOR.
PRESUP. % N° BEN. PRESUP. % N° BEN.
ACUM. ACUM.

- - - -
PUERTAS VENTANAS INSTALACIONE

VALOR. VALOR.
PRESUP. % N° BEN. PRESUP. % N° BEN.
ACUM. ACUM.

- - - -
INSTALACIONES ELECTRICAS EVACUACION AGUAS PLUVIALES VAR

VALOR. VALOR.
PRESUP. % N° BEN. PRESUP. % N° BEN.
ACUM. ACUM.

- - - -
VARIOS MITIGACION Y LIMPIEZA ACAR

VALOR. VALOR.
PRESUP. % N° BEN. PRESUP. % N° BEN.
ACUM. ACUM.

- - - -
ACARREOS FLETES EJECUCIÓN FÍSIC

VALOR.
VALOR. VALOR.
PRESUP. % N° BEN. PRESUP. % ACUMULADA
ACUM. ACUM. ANTERIOR

- - - - -
EJECUCIÓN FÍSICA RETIROS AUTORIZADOS Y DEVOLUCIONES

VALOR. Devolución Devolución 2da. 3era. Semana


ACUMULADA % 1era. Semana 2da. Semana
1era. Semana Semana
ACTUAL

36,810.57 2.41%
DEVOLUCIONES EJECUCIÓN FINANCIERO (APORTE PNVR)

VALOR. VALOR.
Devolución Devolución 4ta.
4ta. Semana ACUMULADA ACUMULADA %
3era. Semana Semana ANTERIOR ACTUAL

-
OBSERVACIONES DEL COORDINADOR REGIONAL OBSERVACIONES DEL COORDINADOR GENERAL
TÉCNICO
CON DOCUMENTO
SUSTENTATORIO DEL
DEDUCTIVO
FICHA TECNICA DEL NE CONVENIO Nº 027-2019-PUN/VMVU/PNVR

“MEJORAMIENTO DE VIVIENDA RURAL EN LOS CC.PP.


PROYECTO: CERRILLOS, CALUTA Y OTROS - DISTRITO DE SANTA LUCÍA
- PROVINCIA DE LAMPA - DEPARTAMENTO DE PUNO”

UBICACIÓN

Departamento : PUNO

Provincia : LAMPA

Distrito : SANTA LUCIA

CP-Localidades : CERRILLOS, CALUTA, PRADO Y OCCORACHE


DATOS DEL PROYECTO FOT 01: CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE)

Convenio : NE CONVENIO Nº 027-2019-PUN/VMVU/PNVR


Monto Financiado (PNVR) : 1,555,461.91
Desembolso 1 Efectuado : 0.00
Desembolso 2 : 0.00
N° Beneficiarios 58 BENEFICIARIOS
DATOS DE EJECUCIÓN:

Fecha de Inicio de Obra : 5/27/2019

Plazo de Ejecución : 105 dias

Fecha de Término de Obra : 9/8/2019


Ejecución Financiera : 0.00%
INFORMACION RELEVANTE FOT 02: TRAZO, NIVELES (REPLANTEO PRELIMINAR)
EJECUTADO A LA FECHA: CANT. PARTIDA
54 TRAZO, NIVELES (REPLANTEO PRELIMINAR)
54 CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE)
54 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE)
TOTAL 54 MODULOS

FOT 03: EXCAVACION DE ZANJA (APORTE)

OBS. DEL SUPERVISOR: 1.- ANALISIS DEL ASPECTO TECNICO:


* La obra viene ejecutandose normalmente. A.- AVANCE FISICO ACUMULADO 2.41%
B.- MONTO VALORIZADO : S/. 36,810.57
C.- ESTADO DE LA OBRA : EN EJECUCION
D.- FECHA DE INICIO : 5/27/2019
E.- PLAZO DE EJECUCION PROGR. : 105 Dias
F.- FECHA DE TERM. PROGRAMADA : 9/8/2019
G.-AMPLIACION DE PLAZO SOLICIT. -
H.- FECHA DE TERM. REPROGRAMADA : -
I.- FECHA DE TÉRMINO REAL : -
J.- ATRAZO CON RESPE. AL PLAZO EJEC. : -
K.- PLAZO DE EJECUCION TOTAL : -
2.- ANALISIS DEL ASPECTO ECONOMICO:
A.- AVANCE FINANCIERO ACUMULADO : 0.00%
B.- MONTO VALORIZADO : -
C.- PRESUPUESTO DE OBRA : 1,555,461.91
D.- AMPLIACIONES PRESUPUESTALES : -
E.- TOTAL DESEMBOLSADO : 0.00
F.- GASTO TOTAL EFECTUADO : 0.00
CONVENIO N° 027-2019-PUN/VMVU/PNVR
PROYECTO “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CC.PP. CERRILLOS, CALUTA Y OTROS - SANTA LUCÍA - PROVINCIA DE LAMPA - DE
FECHA 6/2/2019

Mes
ÍTEM PARTIDA PPTO Semana
Dia
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01 TRABAJOS PRELIMINARES
1,666.72 Programado
01.01.01 CARTEL DE OBRA DE 4.00x2.50m.
Ejecutado
01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR
3,088.83 Programado
01.02.01 TRAZO, NIVELES (REPLANTEO PRELIMINAR)
Ejecutado
01.03 SEGURIDAD Y SALUD
4,061.16 Programado
01.03.01 EQUIPO DE SEGURIDAD INDIVIDUAL
Ejecutado
1,077.06 Programado
01.03.02 EQUIPO DE SEGURIDAD COLECTIVA
Ejecutado
339.30 Programado
01.03.03 SEÑALIZACION TEMPORAL DE SEGURIDAD
Ejecutado
2,108.88 Programado
01.03.04 CAPACITACION EN SALUD Y SEGURIDAD
Ejecutado
02 MOVIMIENTO DE TIERRAS
01.01 EXCAVACIONES
27,497.73 Programado
02.01 CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE)
Ejecutado
8,950.77 Programado
02.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE)
Ejecutado
03 CONCRETO SIMPLE
03.01 CIMIENTOS
45,382.11 Programado
03.01.01 CIMIENTO CORRIDO DE CONCRETO CICLOPEO MEZCLA CEMENTO HORMIGON 1:10 + 50% P.G.
Ejecutado
11,062.74 Programado
03.01.02 SUMINISTRO DE PIEDRA MEDIANA
Ejecutado
4,895.10 Programado
03.01.03 NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA MEDIANA ( APORTE)
Ejecutado
03.02 SOBRECIMIENTOS
20,909.70 Programado
03.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM
Ejecutado
19,021.66 Programado
03.02.02 ENCOFRADO Y DESENCIOFRADO DE SOBRECIMIENTO h=0.35m
Ejecutado
04 CONCRETO ARMADO
04.01 COLUMNAS
24,715.08 Programado
04.01.01 CONCRETO COLUMNAS f'c=175 kg/cm2
Ejecutado
20,176.21 Programado
04.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
Ejecutado
42,639.70 Programado
04.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNAS
Ejecutado
04.02 VIGAS
31,189.94 Programado
04.02.01 CONCRETO VIGAS f'c=175 kg/cm2
Ejecutado
29,735.48 Programado
04.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS
Ejecutado
20,844.50 Programado
04.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 VIGAS
Ejecutado
05 TIJERALES Y RETICULADOS
58,749.36 Programado
05.01 TIJERAL DE MADERA DE 2"X4"
Ejecutado
30,240.72 Programado
05.02 CORREAS DE MADERA 2"X2"
Ejecutado
3,885.06 Programado
05.03 FRISO DE MADERA DE 2"X1"
Ejecutado
06 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA
75,793.08 Programado
06.01 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA
Ejecutado
8,586.29 Programado
06.02 CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO
Ejecutado
07 CIELO RASOS DE FIBROCEMENTO
47,763.81 Programado
07.01 ESTRUCTURA DE SOPORTE DE PERFILES METALICOS DE CIELO RASO
Ejecutado
44,534.27 Programado
07.02 CIELORASO CON FIBROCEMENTO DE 4MM 1.22MX2.44M
Ejecutado
08 MUROS
163,051.34 Programado
08.01 MURO DE LADRILLO BLOQUER 10X20X30 CM, ANCHO 10 CM
Ejecutado
21,807.01 Programado
08.02 SUMINISTRO E INSTALACION DE POLIESTIRENO DE 2" DENSIDAD 20
Ejecutado
552.83 Programado
08.03 BRUÑAS DE MUROS DE LADRILLO
Ejecutado
09 REVOQUES
1,006.91 Programado
09.01 BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON MORTERO 1:4 E= 1.5 CM
Ejecutado
10 ENLUCIDO DE YESO
59,880.54 Programado
10.01 ENLUCIDO DE YESO EN MURO DE BLOQUER E= 1 cm.
Ejecutado
16,802.16 Programado
10.02 DERRAMES DE VANOS CON YESO E=1.5CM
Ejecutado
11 PISOS
2,691.71 Programado
11.01 BASE DE TIERRA MATERIAL PROPIO COMPACTADO/NIVELADO E= 10 CM
Ejecutado
6,023.25 Programado
11.02 SUMINISTRO DE POLIESTIRENO DE 2" DENSIDAD 20
Ejecutado
1,059.03 Programado
11.03 INSTALACION DE POLIESTIRENO DE E= 2" DENSIDAD 20 ( APORTE)
Ejecutado
4,059.63 Programado
11.04 ACERO DE TEMPERATURA
Ejecutado
14,589.29 Programado
11.05 PISO DE CEMENTO FROTACHADO DE E= 3"
Ejecutado
5,092.14 Programado
11.06 SUMINISTRO DE PIEDRA MEDIANA
Ejecutado
2,814.24 Programado
11.07 NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA MEDIANA E= 0.10 M ( APORTE)
Ejecutado
3,880.87 Programado
11.08 BASE DE MATERIAL PROPIO COMPACTADO/NIVELADO DE 9% A 12% DE HUMEDAD E= 1 CM
Ejecutado
65,739.82 Programado
11.09 PISO DE MADERA MACHIHEMBRADA DE 3/4"X4" + DURMIENTES DE 2"X4"
12 VEREDAS
16,617.14 Programado
12.01 VEREDA DE CONCRETO SIMPLE F'C=140 KG/CM2 E= 10 CM ACABADO FROTACHADO INCLUYE BRUÑADO
12.01 VEREDA DE CONCRETO SIMPLE F'C=140 KG/CM2 E= 10 CM ACABADO FROTACHADO INCLUYE BRUÑADO
Ejecutado
4,087.01 Programado
12.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS
Ejecutado
13 ZOCALOS Y CONTRAZOCALOS
13,958.91 Programado
13.01 ZOCALO DE CEMENTO SOBRE MURO EXTERIOR H=40 CM E= 2 CM INCLUYE BRUÑAS
Ejecutado
13,866.62 Programado
13.02 CONTRAZOCALO DE MADERA CON RODON, DE 5.80 CM X 1.90 CM X 2.40 M
Ejecutado
14 PUERTAS
48,621.40 Programado
14.01 PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE. INSTALACION
Ejecutado
28,689.12 Programado
14.02 PUERTA CONTRAPLACADA DE 0.90X2.10 M. INCLUYE. INSTALACION
Ejecutado
57,378.24 Programado
14.03 PUERTA CONTRAPLACADA DE 0.80X2.10 M. INCLUYE. INSTALACION
Ejecutado
15 VENTANAS
65,293.50 Programado
15.01 VENTANA DE ALUMINIO DE 0.78 X 1.08 M INC/VIDRIO, CON CONTRAVENTANA DE MADERA
Ejecutado
20,918.86 Programado
15.02 VENTANA CENITAL
Ejecutado
16 INSTALACIONES ELECTRICAS
17,837.90 Programado
16.01 INSTALACION ELECTRICA EN MÓDULO
Ejecutado
17 EVACUACION AGUAS PLUVIALES
39,733.48 Programado
17.01 SISTEMA DE EVACUACION DE AGUAS PLUVIALES
Ejecutado
850.16 Programado
17.02 ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO
Ejecutado
657.73 Programado
17.03 CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION
17.03 CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION
Ejecutado
18 VARIOS
29,942.50 Programado
18.01 CONSTRUCCION DE ESTUFA SALUDABLE DE LADRILLO
Ejecutado
5,950.22 Programado
18.02 APOYO DE PEON EN CONSTRUCCION DE ESTUUFA ( APORTE )
Ejecutado
19 MITIGACION Y LIMPIEZA
7,933.24 Programado
19.01 MITIGACION DEL IMPACTO AMBIENTAL (APORTE)
Ejecutado
20 ACARREOS
15,867.06 Programado
20.01 ACARREO DE MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA FINAL (APORTE)
Ejecutado
21 FLETES
21.01 FLETE DE PROVEEDOR AL AMACEN DE OBRA
43,086.90 Programado
21.01.01 COSTO FLETE DESDE EL PROVEEDOR AL ALMACEN DE OBRA (INCLUYE CARGA Y DESCARGA)
Ejecutado
21,543.45 Programado
21.01.02 FLETE TERRESTRE TRANSPORTE DE MATERIALES DE ALMACEN A PUNTA CARRETERA ( INCLUYE CARGA Y
Ejecutado
21.02 FLETE RURAL DEL ALMACEN DE OBRA A LAS VIVIENDAS
118,900.00 Programado
21.02.01 COSTO FLETE TERRESTRE DEL ALMACEN A LAS VIVIENDAS (APORTE)
Ejecutado
Programad
COSTO DIRECTO 1,529,699.48
Ejecutado
P = PROGRAMADO
AVANCE SEMANAL (%)
E = EJECUTADO
P = PROGRAMADO
AVANCE ACUMULADO (%)
E = EJECUTADO

P = PROGRAMADO
AVANCE MENSUAL (%)
E = EJECUTADO
P = PROGRAMADO
AVANCE ACUMULADO (%)
E = EJECUTADO

FECHA
TRANSFERENCIAS FECHA TRAMITE MONTO
RECEPCIÓN
FORMATO N° 23
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

E LAMPA - DEPARTAMENTO DE PUNO”

1° MES - MAYO 2° MES - JUNIO 3° MES - JULIO


1 2 3 4 5 6 7 8
27 AL 31 01 AL 02 03 AL 09 10 AL 16 17 AL 23 24 AL 30 01 AL 07 08 AL 14 15 AL 21

1,666.72

3,088.83
2,875.81

4,061.16

1,077.06

339.30

2,108.88
27,497.73
25,601.37
8,950.77
8,333.39

45,382.11

11,062.74

4,895.10

7,841.14 13,068.56

19,021.66

22,655.49 2,059.59

20,176.21

42,639.70

31,189.94
29,735.48

20,844.50

22,031.01 36,718.35

30,240.72

3,885.09

75,793.21

8,586.29

91,716.38 71,334.96

19,989.70 1,817.25

552.82
5,613.80
1,784.98 1,851.09 1,851.09 1,851.09 594.99

504.92 4,712.63 4,712.63 4,712.63 4,712.63 4,712.63 4,712.63 4,712.63

252.46 2,356.31 2,356.31 2,356.31 2,356.31 2,356.31 2,356.31 2,356.31

1,330.97 12,422.39 12,422.39 12,422.39 12,422.39 12,422.39 12,422.39 12,422.39

41,204.05 25,632.59 134,375.94 75,391.59 44,180.40 82,267.84 133,601.32 116,525.64 180,923.78


36,810.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.37% 8.78% 4.93% 2.89% 5.38% 8.73% 7.62% 11.83%
2.41% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4.37% 13.15% 18.08% 20.97% 26.35% 35.08% 42.70% 54.53%
2.41% 2.41% 2.41% 2.41% 2.41% 2.41% 2.41% 2.41%

41,204.05 2.69% 361,848.36 23.65% 553,920.99


36,810.57 2.41% 0.00 0.00% 0.00
41,204.05 2.69% 403,052.41 26.35% 956,973.40
36,810.57 2.41% 36,810.57 2.41% 36,810.57

FECHA INICIO DE OBRA 5/27/2019


PLAZO DE EJECUCIÓN 105
FECHA DE TERMINO 9/8/2019
PRESUPUESTO TOTAL : S/. 1´717,389.99
COSTO DIRECTO : S/. 1´529,699.48

MES - JULIO 4° MES - AGOSTO 5° MES - SET.


9 10 11 12 13 14 15
22 AL 28 29 AL 31 01 AL 04 05 AL 11 12 AL 18 19 AL 25 26 AL 31 1 AL 1 2 AL 8
47,763.81

16,700.35 27,833.92
755.26 251.75

52,395.46 1,871.26

16,802.16

2,691.71

6,023.25

1,059.03

3,044.72 1,014.91

14,589.29

5,092.14

2,814.24

3,880.87

60,261.50 5,478.32

16,617.14
4,087.07

13,958.79

13,866.62

48,621.40

28,689.12

57,378.24

65,293.50

20,918.86

17,837.90

39,733.48

850.16

493.30 164.43
28,694.90 1,247.60

5,950.22

15,867.06

4,712.63 4,712.63 168.31

2,356.31 2,356.31 84.20

12,422.39 12,422.39 5,767.52

71,886.79 50,983.46 93,672.98 97,767.89 249,490.30 59,166.59 34,809.55 1,247.60 36,571.27


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.70% 9.46% 6.39% 16.31% 3.87% 2.36% 2.39%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
59.23% 68.68% 75.07% 91.38% 95.25% 97.61% 100.00%
2.41% 2.41% 2.41% 2.41% 2.41% 2.41% 2.41%

36.21% 534,907.31 34.97% 37,818.87 2.47%


0.00% 0.00 0.00% 0.00 0.00%
62.56% 1,491,880.71 97.53% 1,529,699.58 100.00%
2.41% 36,810.57 2.41% 36,810.57 2.41%

AMPLIACION DE PLAZO
FECHA Nº DIAS PLAZO VIGENTE FIN DE OBRA OBSERVACIONES
CONVENIO N° 027-2019-PUN/VMVU/PNVR
PROYECTO “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CC.PP. CERRILLOS, CALUTA Y OTROS - SANTA LUCÍA - PROVINCIA DE LAMPA - DE
FECHA 6/2/2019

Mes
ÍTEM PARTIDA PPTO
Semana
Dia
Programado
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 12,341.95
Ejecutado
Programado
02 MOVIMIENTO DE TIERRAS 36,448.50
Ejecutado
Programado
03 CONCRETO SIMPLE 101,271.32
Ejecutado
Programado
04 CONCRETO ARMADO 169,300.91
Ejecutado
Programado
05 TIJERALES Y RETICULADOS 92,875.14
Ejecutado
Programado
06 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA 84,379.37
Ejecutado
Programado
07 CIELO RASOS DE FIBROCEMENTO 92,298.08
Ejecutado
Programado
08 MUROS 185,411.17
Ejecutado
Programado
09 REVOQUES 1,006.91
Ejecutado
Programado
10 ENLUCIDO DE YESO 76,682.70
Ejecutado
Programado
11 PISOS 105,949.98
Ejecutado
Programado
12 VEREDAS 20,704.15
Programado
13 ZOCALOS Y CONTRAZOCALOS 27,825.53
Ejecutado
Programado
14 PUERTAS 134,688.76
Ejecutado
Programado
15 VENTANAS 86,212.36
Ejecutado
Programado
16 INSTALACIONES ELECTRICAS 17,837.90
Ejecutado
Programado
17 EVACUACION AGUAS PLUVIALES 41,241.37
Ejecutado
Programado
18 VARIOS 35,892.72
Ejecutado
Programado
19 MITIGACION Y LIMPIEZA 7,933.24
Ejecutado
Programado
20 ACARREOS 15,867.06
Ejecutado
Programado
21 FLETES 183,530.35
Ejecutado
Programad
COSTO DIRECTO 1,529,699.48
Ejecutado
P = PROGRAMADO
AVANCE SEMANAL (%)
E = EJECUTADO
P = PROGRAMADO
AVANCE ACUMULADO (%)
E = EJECUTADO

P = PROGRAMADO
AVANCE MENSUAL (%)
E = EJECUTADO
P = PROGRAMADO
AVANCE ACUMULADO (%)
E = EJECUTADO

FECHA
TRANSFERENCIAS FECHA TRAMITE MONTO
RECEPCIÓN
FORMATO N° 23
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

E LAMPA - DEPARTAMENTO DE PUNO”

1° MES -
MAYO 2° MES - JUNIO 3° MES - JULIO
1 1B 2 3 4 5 6 7 8 9
27 AL 31 01 AL 02 03 AL 09 10 AL 16 17 AL 23 24 AL 30 01 AL 07 08 AL 14 15 AL 21 22 AL 28
4,755.55 7,586.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2,875.81 - - - - - - - - -
36,448.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33,934.76 - - - - - - - - -
0.00 15,957.84 72,244.91 13,068.56 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 0.00 42,639.70 42,831.70 22,904.09 60,925.42 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 22,031.01 70,844.16 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 84,379.50 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 112,258.90 73,152.21 0.00 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,613.80 52,395.46
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 1,784.98 1,851.09 1,851.09 1,851.09 594.99 0.00
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - - - -
0.00 2,088.35 19,491.33 19,491.33 19,491.33 19,491.33 19,491.33 19,491.33 19,491.33 19,491.33
- - - - - - - - - -
41,204.05 25,632.59 134,375.94 75,391.59 44,180.40 82,267.84 133,601.32 116,525.64 180,923.78 71,886.79
36,810.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.69% 1.68% 8.78% 4.93% 2.89% 5.38% 8.73% 7.62% 11.83% 4.70%
2.41% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2.69% 4.37% 13.15% 18.08% 20.97% 26.35% 35.08% 42.70% 54.53% 59.23%
2.41% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

2.69% 23.65% 36.21%


2.41% 0.00% 0.00%
2.69% 26.35% 62.56%
2.41% 2.41% 2.41%

FECHA INICIO DE OBRA 5/27/2019


PLAZO DE EJECUCIÓN 105 FECHA
FECHA DE TERMINO 9/8/2019
PRESUPUESTO TOTAL : S/. 1´717,389.99
COSTO DIRECTO : S/. 1´529,699.48

JULIO 4° MES - AGOSTO 5° MES - SET.


10 10B 11 12 13 14 14B 15
29 AL 31 01 AL 04 05 AL 11 12 AL 18 19 AL 25 26 AL 31 1 AL 1 2 AL 8
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 64,464.16 27,833.92 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 755.26 251.75 0.00 0.00 0.00
- - - - - - - -
18,673.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
12,818.71 87,652.95 5,478.32 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,704.21
- - - - - - - -
0.00 0.00 27,825.41 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 134,688.76 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 86,212.36 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 0.00 17,837.90 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 0.00 41,076.94 164.43 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 0.00 0.00 34,645.12 1,247.60 0.00
- - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,867.06
- - - - - - - -
19,491.33 6,020.03 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
50,983.46 93,672.98 97,767.89 249,490.30 59,166.59 34,809.55 1,247.60 36,571.27
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.33% 6.12% 6.39% 16.31% 3.87% 2.28% 0.08% 2.39%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
62.56% 68.68% 75.07% 91.38% 95.25% 97.53% 97.61% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

% 34.97% 2.47%
% 0.00% 0.00%
% 97.53% 100.00%
% 2.41% 2.41%

AMPLIACION DE PLAZO
Nº DIAS PLAZO VIGENTE FIN DE OBRA OBSERVACIONES
FECHA: 02/06/2019

PRESUPUESTO BASE
ITEMS DESCRIPCION PARTIDA (01) DEL 27 AL 02 JU
U.M. METRADO P.U. PARCIAL METRADO
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 12,341.95
01.01 TRABAJOS PRELIMINARES 1,666.72
01.01.01 CARTEL DE OBRA DE 4.00x2.50m. und 2.90 574.73 1,666.72 -
01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR 0.00 3,088.83
01.02.01 TRAZO, NIVELES (REPLANTEO PRELIMINAR) m2 2,413.15 1.28 3,088.83 2,246.73
01.03 SEGURIDAD Y SALUD 0.00 7,586.40
01.03.01 EQUIPO DE SEGURIDAD INDIVIDUAL glb 58.00 70.02 4,061.16
01.03.02 EQUIPO DE SEGURIDAD COLECTIVA glb 58.00 18.57 1,077.06
01.03.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 58.00 5.85 339.30
01.03.04 CAPACITACION EN SALUD Y SEGURIDAD glb 58.00 36.36 2,108.88
02 MOVIMIENTO DE TIERRAS 36,448.50
2.01 EXCAVACIONES 0.00 36,448.50
02.01 CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE) m3 1,206.57 22.79 27,497.73 1,123.36
02.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) m3 392.75 22.79 8,950.77 365.66
03 CONCRETO SIMPLE 101,271.32
03.01 CIMIENTOS 0.00 61,339.95
03.01.01 CIMIENTO CORRIDO DE CONCRETO CICLOPEO MEZCLA CEMENTO HORMIGON 1:10 + 50% P.G. m3 261.84 173.32 45,382.11 -
03.01.02 SUMINISTRO DE PIEDRA MEDIANA m3 130.92 84.50 11,062.74 -
03.01.03 NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA MEDIANA ( APORTE) m3 130.92 37.39 4,895.10
03.02 SOBRECIMIENTOS 0.00 39,931.38
03.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM m3 101.79 205.42 20,909.70 -
03.02.02 ENCOFRADO Y DESENCIOFRADO DE SOBRECIMIENTO h=0.35m m2 992.78 19.16 19,021.66 -
04 CONCRETO ARMADO 169,300.91
04.01 COLUMNAS 0.00 87,530.98 -
04.01.01 CONCRETO COLUMNAS f'c=175 kg/cm2 m3 64.19 385.03 24,715.08 -
04.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 724.20 27.86 20,176.21 -
04.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNAS kg 10,606.89 4.02 42,639.70 -
04.02 VIGAS 0.00 81,769.92
04.02.01 CONCRETO VIGAS f'c=175 kg/cm2 m3 91.22 341.92 31,189.94
04.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 948.50 31.35 29,735.48 -
04.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 VIGAS kg 5,185.20 4.02 20,844.50 -
05 TIJERALES Y RETICULADOS 92,875.14 -
05.01 TIJERAL DE MADERA DE 2"X4" und 232.00 253.23 58,749.36
05.02 CORREAS DE MADERA 2"X2" p2 3,678.92 8.22 30,240.72 -
05.03 FRISO DE MADERA DE 2"X1" p2 444.01 8.75 3,885.06 -
06 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA 84,379.37 -
06.01 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA m2 2,380.44 31.84 75,793.08
06.02 CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO m 356.87 24.06 8,586.29 -
07 CIELO RASOS DE FIBROCEMENTO 92,298.08 -
07.01 ESTRUCTURA DE SOPORTE DE PERFILES METALICOS DE CIELO RASO m2 1,045.16 45.70 47,763.81 -
07.02 CIELORASO CON FIBROCEMENTO DE 4MM 1.22MX2.44M m2 1,045.16 42.61 44,534.27
08 MUROS 185,411.17
08.01 MURO DE LADRILLO BLOQUER 10X20X30 CM, ANCHO 10 CM m2 4,234.00 38.51 163,051.34 -
08.02 SUMINISTRO E INSTALACION DE POLIESTIRENO DE 2" DENSIDAD 20 m2 1,581.36 13.79 21,807.01 -
08.03 BRUÑAS DE MUROS DE LADRILLO m 284.96 1.94 552.83 -
09 REVOQUES 1,006.91 -
09.01 BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON MORTERO 1:4 E= 1.5 CM m2 40.72 24.73 1,006.91 -
10 ENLUCIDO DE YESO 76,682.70
10.01 ENLUCIDO DE YESO EN MURO DE BLOQUER E= 1 cm. m2 3,553.74 16.85 59,880.54
10.02 DERRAMES DE VANOS CON YESO E=1.5CM m 1,822.36 9.22 16,802.16 -
11 PISOS 105,949.98 -
11.01 BASE DE TIERRA MATERIAL PROPIO COMPACTADO/NIVELADO E= 10 CM m2 551.58 4.88 2,691.71 -
11.02 SUMINISTRO DE POLIESTIRENO DE 2" DENSIDAD 20 m2 551.58 10.92 6,023.25 -
11.03 INSTALACION DE POLIESTIRENO DE E= 2" DENSIDAD 20 ( APORTE) m2 551.58 1.92 1,059.03 -
11.04 ACERO DE TEMPERATURA m2 551.58 7.36 4,059.63 -
11.05 PISO DE CEMENTO FROTACHADO DE E= 3" m2 551.58 26.45 14,589.29
11.06 SUMINISTRO DE PIEDRA MEDIANA m2 602.62 8.45 5,092.14
11.07 NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA MEDIANA E= 0.10 M ( APORTE) m2 602.62 4.67 2,814.24 -
11.08 BASE DE MATERIAL PROPIO COMPACTADO/NIVELADO DE 9% A 12% DE HUMEDAD E= 1 CM m2 602.62 6.44 3,880.87 -
11.09 PISO DE MADERA MACHIHEMBRADA DE 3/4"X4" + DURMIENTES DE 2"X4" m2 602.62 109.09 65,739.82 -
12 VEREDAS 20,704.15 -
12.01 VEREDA DE CONCRETO SIMPLE F'C=140 KG/CM2 E= 10 CM ACABADO FROTACHADO INCLUYE B m2 480.82 34.56 16,617.14 -
12.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 207.15 19.73 4,087.01
13 ZOCALOS Y CONTRAZOCALOS 27,825.53
13.01 ZOCALO DE CEMENTO SOBRE MURO EXTERIOR H=40 CM E= 2 CM INCLUYE BRUÑAS m2 537.29 25.98 13,958.91 -
13.02 CONTRAZOCALO DE MADERA CON RODON, DE 5.80 CM X 1.90 CM X 2.40 M m 981.36 14.13 13,866.62
14 PUERTAS 134,688.76
14.01 PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 58.00 838.30 48,621.40 -
14.02 PUERTA CONTRAPLACADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 58.00 494.64 28,689.12 -
14.03 PUERTA CONTRAPLACADA DE 0.80X2.10 M. INCLUYE. INSTALACION und 116.00 494.64 57,378.24 -
15 VENTANAS 86,212.36 -
15.01 VENTANA DE ALUMINIO DE 0.78 X 1.08 M INC/VIDRIO, CON CONTRAVENTANA DE MADERA und 174.00 375.25 65,293.50 -
15.02 VENTANA CENITAL und 58.00 360.67 20,918.86
16 INSTALACIONES ELECTRICAS 17,837.90 -
16.01 INSTALACION ELECTRICA EN MÓDULO glb 58.00 307.55 17,837.90 -
17 EVACUACION AGUAS PLUVIALES 41,241.37 -
17.01 SISTEMA DE EVACUACION DE AGUAS PLUVIALES und 116.00 342.53 39,733.48 -
17.02 ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO m2 40.60 20.94 850.16
17.03 CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION m3 2.54 258.95 657.73
18 VARIOS 35,892.72 -
18.01 CONSTRUCCION DE ESTUFA SALUDABLE DE LADRILLO glb 58.00 516.25 29,942.50 -
18.02 APOYO DE PEON EN CONSTRUCCION DE ESTUUFA ( APORTE ) und 58.00 102.59 5,950.22 -
19 MITIGACION Y LIMPIEZA 7,933.24
19.01 MITIGACION DEL IMPACTO AMBIENTAL (APORTE) glb 58.00 136.78 7,933.24
20 ACARREOS 15,867.06 -

20.01 ACARREO DE MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA FINAL (APORTE) 58.00 273.57 15,867.06 -
glb
21 FLETES 183,530.35 -
21.01 FLETE DE PROVEEDOR AL AMACEN DE OBRA 64,630.35

21.01.01 COSTO FLETE DESDE EL PROVEEDOR AL ALMACEN DE OBRA (INCLUYE CARGA Y DESCARGA) 1.00 43,086.90 43,086.90 -
glb
FLETE TERRESTRE TRANSPORTE DE MATERIALES DE ALMACEN A PUNTA CARRETERA
21.01.02 1.00 21,543.45 21,543.45 -
( INCLUYE CARGA Y DESCARGA) glb
21.02 FLETE RURAL DEL ALMACEN DE OBRA A LAS VIVIENDAS 0.00 118,900.00 -
21.02.01 COSTO FLETE TERRESTRE DEL ALMACEN A LAS VIVIENDAS (APORTE) glb 1.00 118,900.00 118,900.00
COSTO DIRECTO 1,529,699.48
(01) DEL 27 AL 02 JUNIO (02) DEL 03 AL 09 JUNIO (03) DEL 10 AL 16 JUNIO (04) DEL 17 AL 23 JUNIO (05) DEL 24 AL 30 JUNIO
VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

2,875.81 93.10% - - 0.00% - - 0.00% - - 0.00% - -


- - - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

25,601.37 93.10% - - 0.00% - - 0.00% - - 0.00% - -


8,333.39 93.10% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -


- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -


- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- - - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -


- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -


- - - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -


- - - -
- - - -
- - - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -


- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -


- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -


- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- - - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -


- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -


- - - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -


- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

- 0.00% - - 0.00% - - 0.00% - - 0.00% - -

36,810.57 2.41% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00


AVANCES
EL 24 AL 30 JUNIO (06) DEL 01 AL 07 JULIO (07) DEL 08 AL 14 JULIO (08) DEL 15 AL 21 JULIO (09) DEL 22 AL 28 JULIO (10) DEL 29 AL 04 AGOS
% METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -


- - - - -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -


0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -


0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -


0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
- - - - -
0.00% - - 0.00% - - 0.00% - - 0.00% - 0.00% 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - 0.00% 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -


0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - 0.00% 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -


- - - - -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -


- - - - -
- - - - -
- - - - -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -


0.00% - - 0.00% - - 0.00% - - 0.00% - 0.00% 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -


0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - 0.00% 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -


0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
- - - - -
0.00% - - 0.00% - - 0.00% - - 0.00% - 0.00% 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - 0.00% 0.00% -


0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - 0.00% 0.00% -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - 0.00% 0.00% -


- - - - -
0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - 0.00% 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - 0.00% 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -


0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% -

0.00% - - 0.00% - - 0.00% - - 0.00% - 0.00% 0.00% -

0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%


(10) DEL 29 AL 04 AGOSTO (11) DEL 05 AL 11 AGOSTO (12) DEL 12 AL 18 AGOSTO (13) DEL 19 AL 25 AGOSTO (14) DEL 26 AL 01 SETIEMBRE
VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- - - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- - - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- - - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- - - -
- - - -
- - - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- - - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- - - -
- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%


- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

- 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%

0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
SALDO
(15) DEL 02 AL 08 SETIEMBRE ACUMULADO
METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %

- - 0.00% - 0.00% 2.90 1,666.72 100.00%


- 0.00%
- - 0.00% 2,246.73 2,875.81 93.10% 166.42 213.02 6.90%
- -
- - 0.00% - - 0.00% 58.00 4,061.16 100.00%
- - 0.00% - - 0.00% 58.00 1,077.06 100.00%
- - 0.00% - - 0.00% 58.00 339.30 100.00%
- - 0.00% - - 0.00% 58.00 2,108.88 100.00%
-
-
- - 0.00% 1,123.36 25,601.37 93.10% 83.21 1,896.36 6.90%
- - 0.00% 365.66 8,333.39 93.10% 27.09 617.38 6.90%
-
-
- - 0.00% - - 0.00% 261.84 45,382.11 100.00%
- - 0.00% - - 0.00% 130.92 11,062.74 100.00%
-
-
- - 0.00% - - 0.00% 101.79 20,909.70 100.00%
- - 0.00% - - 0.00% 992.78 19,021.66 100.00%
- - 0.00%
- - 0.00% - - 0.00% - - 0.00%
- - 0.00% - - 0.00% 64.19 24,715.08 100.00%
- - 0.00% - - 0.00% 724.20 20,176.21 100.00%
- - 0.00% - - 0.00% 10,606.89 42,639.70 100.00%
-
-
- - 0.00% - - 0.00% 948.50 29,735.48 100.00%
- - 0.00% - - 0.00% 5,185.20 20,844.50 100.00%
- - 0.00% - - 0.00% - - 0.00%
-
- - 0.00% - - 0.00% 3,678.92 30,240.72 100.00%
- - 0.00% - - 0.00% 444.01 3,885.06 100.00%
- - 0.00% - - 0.00% - - 0.00%
-
- - 0.00% - - 0.00% 356.87 8,586.29 100.00%
- - - - - 0.00%
- - 0.00% - - 0.00% 1,045.16 47,763.81 100.00%
-
-
- - 0.00% - - 0.00% 4,234.00 163,051.34 100.00%
- - - 1,581.36 21,807.01 100.00%
- - - 284.96 552.83 100.00%
- - - - - 0.00%
- - 0.00% - - 0.00% 40.72 1,006.91 100.00%
-
-
- - 0.00% - - 0.00% 1,822.36 16,802.16 100.00%
- - 0.00% - - 0.00% - - 0.00%
- - 0.00% - - 0.00% 551.58 2,691.71 100.00%
- - 0.00% - - 0.00% 551.58 6,023.25 100.00%
- - 0.00% - - 0.00% 551.58 1,059.03 100.00%
- - 0.00% - - 0.00% 551.58 4,059.63 100.00%
-
-
- - 0.00% - - 0.00% 602.62 2,814.24 100.00%
- - 0.00% - - 0.00% 602.62 3,880.87 100.00%
- - 0.00% - - 0.00% 602.62 65,739.82 100.00%
- - 0.00% - - 0.00% - - 0.00%
- - 0.00% - - 0.00% 480.82 16,617.14 100.00%
-
-
- - 0.00% - - 0.00% 537.29 13,958.91 100.00%
-
-
- - 0.00% - - 0.00% 58.00 48,621.40 100.00%
- - 0.00% - - 0.00% 58.00 28,689.12 100.00%
- - - 116.00 57,378.24 100.00%
- - 0.00% - - 0.00% - - 0.00%
- - 0.00% - - 0.00% 174.00 65,293.50 100.00%
-
- - 0.00% - - 0.00% - - 0.00%
- - 0.00% - - 0.00% 58.00 17,837.90 100.00%
- - 0.00% - - 0.00% - - 0.00%
- - 0.00% - - 0.00% 116.00 39,733.48 100.00%
-
-
- - 0.00% - - 0.00% - - 0.00%
- - -
- - 0.00% - - 0.00% 58.00 5,950.22 100.00%
-
-
- - 0.00% - - 0.00% - - 0.00%

- - 0.00% - - 0.00% 58.00 15,867.06 100.00%

- - 0.00% - - 0.00% - - 0.00%


-

- - 0.00% - - 0.00% 1.00 43,086.90 100.00%


- - 0.00% - - 0.00% 1.00 21,543.45 100.00%

- - 0.00% - - 0.00% - - 0.00%

0.00 0.00% 36,810.57 2.41% 1,001,009.06 65.44%


“MEJORAMIENTO DE VIVIENDA RURAL EN LOS CC.PP. CERRILLOS, CALUTA Y OTROS - DISTRITO DE SANTA LUCÍA - PROVINCIA DE LAMPA - D
PUNO”
NE CONVENIO Nº 027-2019-PUN/VMVU/PNVR

120.00%

100.00%

80.00%

AVANCE
60.00%

40.00%

20.00%

0.00%
1 1B 2 3 4 5 6 7 8 9 10 10B 11 12 13 14 14B 15

SEMANAS

Mes MAYO JUNIO JULIO AGOSTO


Semana 1 1B 2 3 4 5 6 7 8 9 10 10B 11 12 13
27 AL 01 AL 03 AL 10 AL 17 AL 24 AL 01 AL 08 AL 15 AL 22 AL 29 AL 01 AL 05 AL 12 AL 19 AL
Dia 31 02 09 16 23 30 07 14 21 28 31 04 11 18 25
Programado 2.69% 4.37% 13.15% 18.08% 20.97% 26.35% 35.08% 42.70% 54.53% 59.23% 62.56% 68.68% 75.07% 91.38% 95.25%
Ejecutado 2.41% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
AVANCE 2.41% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
A Y OTROS - DISTRITO DE SANTA LUCÍA - PROVINCIA DE LAMPA - DEPARTAMENTO DE
PUNO”
027-2019-PUN/VMVU/PNVR

AGOSTO SETIEMBRE
14 14B 15
26 AL 1 AL 1 2 AL 8
31
97.53% 97.61% 100.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
DATOS DEL NE CONVENIO Nº 027-2019-PUN/VMVU/PN
“MEJORAMIENTO DE VIVIENDA RURAL EN LOS CC.PP. CERRILLOS, CALUTA Y OTROS - DISTRITO DE
NUCLEO EJECUTOR
PROVINCIA DE LAMPA - DEPARTAMENTO DE PUNO”
CONVENIO NE CONVENIO Nº 027-2019-PUN/VMVU/PNVR
CUENTA BANCARIA 405-94334573-0-34 BANCO
COORDINADOR REGIONAL ARQ. TANIA ALEJANDRO
LIQUIDADOR CPC. HUGO REYES BENAVENTE
MONITOR TECNICO ING. ROGER PASCAJA LLALLACACHI
MONITOR SOCIAL LIC. SANDRA CACERES TITO

AGENTES DEL CONVENIO


GESTOR SOCIAL CARLOS ORIHUELA CHAMBI
ESPECIALIDAD SOCIOLOGO CIP
DIRECCION / EMAIL carlosdanielo@hotmail.com
RESIDENTE RICHAR PAYEHUANCA JUSTO
ESPECIALIDAD INGENIERO CIVIL CIP 149389
DIRECCION / EMAIL ruivanz@hotmail.com
SUPERVISOR ARMANDO DANIEL ZAPANA PACHA
ESPECIALIDAD INGENIERO CIVIL CIP 73702
DIRECCION / EMAIL adzapanap@gmail.com
PRESIDENTE TOMAS CONDORI SALAS
SECRETARIO YURI PARISACA PARI
NUCLEO EJECUTOR
TESORERO CATALINA GENOVEVA CABANA ANARA
FISCAL ALBERTA MARTA QUISPE CHOQUE

DATOS GENERALES DEL PROYECTO FECHAS IMPORTANTES


REGION PUNO FECHA FIRMA CONVENIO
DEPARTAMENTO PUNO FECHA 1º VISITA EVALUACION
PROVINCIA LAMPA FECHA DE INICIO DE OBRA
DISTRITO SANTA LUCIA FECHA TERMINO PROGRAMADA.
LOCALIDAD CERRILLOS, CALUTA, PRADO Y OCCORACHE TIEMPO DE EJECUCION
REGION GEOGRAFICA SIERRA DESEMBOLSOS
BENEFICIARIOS DIRECTOS 58 FECHA APERTURA DE CUENTA
CATEGORIA AMBIENTAL FECHA COMP. DE PAGO
COMPROBANTE DE PAGO
FECHA 1ª DESEMBOLSO
MONTO 1º DESEMBOLSO
UN/VMVU/PNVR
TA Y OTROS - DISTRITO DE SANTA LUCÍA -
DE PUNO”
RESUMEN DEL ESTADO FINANCIERO
BCP COSTO DIRECTO 1,529,699.48
MANO DE OBRA CALIFICADA 217,558.18
MANO DE OBRA NO CALIFICADA 250,893.37
MATERIALES 872,784.90
EQUIPO 12,621.05
HERRAMIENTAS 13,855.08
FLETE 161,986.90
DNI 44256934 COSTO INDIRECTO 187,690.51
FONO 953487871 GASTOS GENERALES 79,659.98
GASTOS NÚCLEO EJECUTOR 8,559.94
DNI 42970491 GASTOS FINANCIEROS 265.59
FONO 990447724 RESIDENTE DE OBRA 33,850.00
ASISTENTE DE RESIDENTE 12,250.00
DNI 01552772 SUPERVISION 33,850.00
FONO 952488552 GESTOR SOCIAL 19,255.00
TOTAL 1,717,389.99
DNI 45694431 APORTES BENEFICIARIOS 161,928.08
DNI 01335723 MONTO A TRANSFERIR AL N.E. 1,555,461.91
DNI 02164145 COMPONENTES
DNI 02162588 COSTO DIRECTO 1,529,699.48
COSTO INDIRECTO 187,690.51
ECHAS IMPORTANTES TOTAL 1,717,389.99
RESUMEN
C.D. SIN APORTE DE BENEF. 1,367,771.40
27-05-19 COSTO INDIRECTO 187,690.51
08-09-19 MONTO FINANCIADO PNVR 1,555,461.91
105