You are on page 1of 5

HVAC Interview Test

HVAC interview test for a contracting


company in Egypt

Brought to you by: MEP WORK team

WWW.MEPWORK.COM
1- Are you capable of making the calculations of A/C system and
which program do use?

2- Identify the dew point.

3- Identify the relative humidity.

4- Identify the dry temperature degree.

5- Identify the wet temperature degree.

6- Identify the humidity ratio.

7- Identify Enthalpy.

8- Sketch a simple condensing with specific enthalpy and pressure?

9- Which of the following A/C systems is suitable for the down


mentioned buildings? (Package unit - Chilled water - VRV)

(hospital surgery department - hotel building - main control room -


Kitchen)

10- Compare between the package unit system and the chilled
water system and mention the buildings in which we can use both
of them and why?
11- Identify the VRV system and mention the advantages and
disadvantages of it.

12- Mention the types of the compressors used in the A/C systems.
And in which system we can use each one of them.

13- Mention the required points that should be ready for the
choice of the A/C unit.

14 - If we got the following results from the load calculations

(total load = 3.0 ton - Sensible load = 2.50 ton - CFM discharge =
1200 CFM), Which of the following unit should be used?

Unit (1) Total load = 2.5 ton Sensible load = 2.5 ton 1300 CFM

Unit (2) Total load = 3.5 ton Sensible load = * ton 1100 CFM

Unit (3) Total load = 3 ton Sensible load = 2 ton 1400 CFM

15- Which of the following Ducts is more efficient and why? And
what are its disadvantages? a) 50x50 b) 20x125 c) 70x35

16- Which of the following buildings need a larger A/C unit?

a) western side room with a pre cast outer finishing

b) Southern side room with a hollow blocks finishing

c) Northern side room with a glass outer finishing


17- Mention the types of insulation for the pipes and what are the
requirements to demand the insulation process?

18- What are the required points to be ready for preparing the A/C
grills?

19- What are the required conditions distributing the feed fans and
the exhaust fans on the deck?

20- Why should we use primary pump and secondary pump in the
chilled water system?

21- When should we install the expansion tank in the cold water
circle?

22 - What is the usage of the expansion tank in the cold water


circle and the water feeding circle?

23- What are the ways of reducing the vibration caused by the
chillers on deck?

24- What are the required dimensions when installing the


following?

a) Interior A/C wall unit

b) Exterior A/C unit


c) Chiller on deck

d) Flow meter

e) Flow meter