You are on page 1of 6

Scientific Bulletin of the The 6th International Conference on

Politehnica University of Timisoara Hydraulic Machinery and Hydrodynamics


Transactions on Mechanics Special issue Timisoara, Romania, October 21 - 22, 2004

THE REHABILITATION OF THE PUMPING STATIONS

Gheorghiţă PANDELEA, Dr. Eng. *


Chief of Design Department 1
AVERSA SA Bucuresti, Romania
Gheorghe VERTAN, Dr. Eng. Ludovic FURCA, Eng.
ITC - ELINF Timisoara Energetic Adviser
Romania SC BEGA UPSOM SA, Ocna Mures,Romania
Dorel FRÂNC, Eng. Alexandru TEGLAS, Eng.
Mechano – Energetics Director, Chief of Mechano – Energetics Department
SC BEGA UPSOM SA, Ocna Mures,Romania SC BEGA UPSOM SA, Ocna Mures,Romania
*Corresponding author: Street Izbiceni 177, Bucuresti, Romania
Tel.: 0724463578, Fax: (+40) 212520769, Email: aversa-proiectare@rdslink.ro

SUMMARY 1. INTRODUCTION
In this paper is described how to make efficient a The energy obtained by pollution and too expensive
pumping station, endowed with 12 NDS and 18 NDS must be saved.
pumps, manufactured before 1990, and upgraded by In each technical process, including pumping, it can
S.C. AVERSA SA in 2003 - 2004. Such upgrading is and has to be saved on two ways:
also provided in water supply for specific problems. • By the restriction of the process to the essential
In Romania, unlike in the European Union - EU, the (rationalizing, quantitative way);
water registration for the users started later, when the • By maximizing the efficiency of the process
specific consumption became to high. In the future the (optimizing, qualitative way);
water registration shall been extended in the whole The efficiency of the pumping stations, which waste
country. Where the water registration was introduced, much energy, must increase.
it offered an incentive to the users to save the water The Soda Products Works of Ocna Mures - BEGA
step by step, and in some years the specific consump- UPSOM has many pumping stations, operating 24
tion decreased to normal. There also was a decrease hours / day (for the cooling water, hydraulic transport,
of the flow Q and of the pumping head H, and all the and brine), lot of pumps with rated powers of hundreds
pumps chose for high H values before the registration, of kW.
are not corresponding any more. The pumping of the cooling water was optimized
It seems that this matter is not available in EU, by pumps type 12 NDS of 160 kW and 18 NDS of
where long time ago the water was registered, the 400 kW and 500 kW, installed at UPSOM before
users saved the water, the specific consumption have 1990 and upgraded by S.C. AVERSA SA Bucharest
been kept low all the time and the H values didn't in 2003 - 2004.
decrease, meaning a corresponding of the pumps to The upgrading of the existent pumps mainly con-
the requirements. sisting of:
The problem appears everywhere the specific con- • Recovery of the operational clearances.
sumption is to high before the registration that is in • The replacement of the impellers by new variants,
the most cases of Romanian towns, but not only. re-design by improved hydraulic [1].
• Re-using of the rehabilitated housings and the
improvement of the inner part of the housing
roughness (hydraulic channel) by Ceramitech
coating [2].

241
Taking into account the real operating conditions of Table 1. Operating characteristics of a 12 NDS worn
the station, the upgrading is followed up by: pump (n= 1480 rpm).
• To eliminate, in all duties, the operating parameters Q H η Pa
with high-energy consumption by means of the No
(m3/h) (m) (%) (kW)
discharge valves.
1 973.6 44.8 64.3 184.3
• The increasing of the pumps efficiency (over 87.6 %
2 868.8 48.2 64.5 176.7
at 12 NDS [3] and 91 % at 18 NDS [4]).
3 789.9 50.4 64.5 168.2
• Using of driving motors at efficiency and cos F at
4 710.8 52.2 64 157.8
maximum values by loading them near to the rated
power. 5 594.7 54.8 59.5 149.3
6 508.5 56.5 56.1 139.9
The high efficiencies obtained in this case are demon-
7 393.1 57.5 47.7 129.5
strating that the upgrading of the existent NDS pumps
can be lucrative also in many other cases, for example Table 2. Operating characteristics of an upgraded 12
in the water supply. NDS pump ( n= 1480 rpm ).
Q H η Pa
2. ACTUAL RESULTS No
(m3/h) (m) (%) (kW)
The pumping station B of BEGA UPSOM is assuring 1 1287.3 31.7 75.1 148.1
24 h / day cooling water (plus other consumers but 2 1210.4 36 81.1 146.4
with lower flows) up to the upgrading it was equipped
3 1107.2 40.5 84.9 143.8
with:
4 950.7 46.2 87.4 137
• one pump 12 NDS driven at 1480 rpm by an asyn- 5 796.9 51.5 87.6 127.6
chronous motor of 160 kW, 400 V.
6 652.2 55.6 83.3 120
• three pumps 18 NDS driven at 980 rpm by asyn- 7 529.7 58.7 79.2 104.2
chronous motors of 500 kW, 6 kV.
• two pumps 18 NDS driven at 980 rpm by asyn- Table 3. Operating characteristics of a 18 NDS worn
chronous motors of 400 kW, 6 kV. pump ( n= 980 rpm ).

The pumps are pumping decanted water, discharg- Q H η Pa


No
ing in a collector from whom the water is distributed (m3/h) (m) (%) ( kW)
through three pipes to the own CET and to other 1 3050.8 24.3 41.1 491.5
departments. Obvious, during the year, according to 2 2822.4 44.9 71.9 480.9
the environment temperature, the necessary cooling 3 2718.6 48.4 75.6 473.9
water flow changes (in summer being double towards 4 2454.0 53.4 78.3 456.8
the winter time). 5 2012.8 58.1 76.1 418.5
The upgraded pumps have been tested in S.C. 6 1507.3 61.8 69.2 366.3
AVERSA SA stands, before and after upgrading in 7 682.2 64.0 42.6 279.3
order to obtain the characteristic operation curves.
In the tables 1 - 4 there are specified the flow Table 4. Operating characteristics of an upgraded 18
values - Q, pumping heads - H, efficiency - h and NDS pump ( n= 980 rpm ).
absorbed powers - Pa of the 12 NDS and 18 NDS Q H η Pa
pumps, deter-mined before and after the upgrading. No
(m3/h) (m) (%) ( kW)
For the upgraded pump 18 NDS the curve Q-H
1 2978.1 33.4 72.1 375.6
is shown in Figure 1 and the efficiency curve in
2 2875.3 38.0 79.8 373.4
Figure 2.
The low efficiencies of the pumps stated before 3 2728.7 42.7 86.6 366.3
upgrading, can be explained by the degradation of 4 2409.0 51.1 91.3 359.3
some areas of the hydraulic channel of the impel- 5 1971.6 58.6 89.8 350.1
ler and housing, by increasing of the clearances 6 1516.4 64.3 84.9 313.1
and by the appearance of some mechanical de- 7 1046.4 67 72.4 264.2
faults, such as: bearings damage, wear rings and 8 596.6 68.5 51.8 215.4
wear sleeves.

242
88 % as the pump has at maximum diameter to assure
operating of the pump and motor in the area of the
maximum efficiencies, respectively cos F optimum.
We mention that, by increasing the pumps 18 NDS
efficiency, the absorbed power at the shaft at these
pumps decreased so that it allowed the replacement
of the 500 kW motor by a 400 kW motor, efficiently
loaded. (high values for the motor efficiency and cos
F).

3. THE EFFICIENCY OF THE PUMPING


FOR THE WATER SUPPLY
Fig. 1. Curve H = f(Q), n=980 rpm of the NDS 500 – 3.1. Calculus relations
450 – 700 (18 NDS) pump, upgraded for UPSOM.
The average speed of the liquid through a pipe is directly
proportional with the flow Q and inversely proportional
with the area A cross section.
v 1 = c1 × Q A (1)
c1 = constant (according to the measuring units).
The hydraulic losses Hr are directly proportional with
the square of the speed v, or with square of the flow.
Hr = c2 × v 2
(2)
c2 =constant (according to the measuring units).
H3 = c2 × Q 2
(2’)
c2 = constant (according to the measuring unit).
Fig. 2. Efficiency curve h = f (Q), n= 980 rpm of The pumping head H required for a water supply
the NDS 500 – 450 – 700 (18 NDS) upgraded pump station is compound of pumping head H0 (e.q. the
for UPSOM. 4th floor – at higher pumping head the water is
re-pumped by house water supply plant) and of the
Obviously, the upgrading included also the repairing losses Hr in the pipes.
of these defaults which appeared during the years of H = Ho + Hr (3)
operation. Besides these repairing, the upgrading
assured a better hydraulic obtained by: The absorbed power, according to the density of the
• Performing of some re–designed impellers with pumped liquid ρ, to the gravity g, to the pumping head
superior efficiency: H, to the flow Q and to the efficiency h, is obtained
• Improvement of the inner part of the housing rough- by the relation:
ness (hydraulic channel) by Ceramitech coating. P = p×g×H×Q η (4)
We mention that, the upgrading had also an aspect The energy E is proportional with the absorbed
of retrofitting that is adapting the pump unit parameters power P and with the operating time t.
to the actual requirements of the pumping station. So,
besides the requirement to operate at high efficiencies E = P×t (5)
at the necessary H values in the station, without partial Taking into account that power P is various in time,
closing of the discharge valves, there was also imposed the precise relation is:
an efficient loading of the driving motors. Following
this, and not adjusting the operational parameters with E = ∫ Pdt (5’)
discharge valves, using efficiently the available power
of the existent motor of 160 kW at the 12 NDS pump, 3.2. A new specific problem
it was necessary the impeller turning. It was obtained
so a lower efficiency of 87.7 % instead of more than

243
Up to 1999, unlike the West Europe, in Romania but much. Pumps operate for other H values, usually
and not only, the water registration of the individual with discharge valves closed, wasting a lot of energy.
users, was not performed. The issue appears everywhere, where the specific
Therefore unconscious and involuntary, it was water consumption was very high before registration.
encouraged the water waste. The water consume was So this matter appeared or should appear in the mostly
not rationalized. cities of Romania and may be also in other countries.
Following this, the specific consumption increased, Evidently this problem concerns all the cities where it
reaching up to 300 – 400 l / man per day towards the appeared or should appear, but also the suppliers of
normal European values of 90 – 150 l / man per day. solutions and equipment.
The high specific consumption gives high flows Q
through the pipes. 3.3. Solutions for this problem
According to relation (1) high flows Q gives high 3.3.1. At low decreases of H values, the pump impeller
speeds v of the water in the pipes. diameters are getting smaller. So the necessity of the
According to relation (2) high speeds v, gives high partial closing of the discharge valves is eliminated,
hydraulic losses Hr. but there appear other disadvantages:
According to relation (3) the high hydraulic losses • The pump efficiency is slowly decreasing.
Hr, gives high pumping heads H. • The pumps must be dismounted and re – mounted,
According to relation (4) high flows Q and high pump- remaking the alignment of the shafts.
ing heads H, requires high powers of the pumps. • If the H values continue to decrease, the discharge
According to the relations (5) and (5’) the high powers valves have to be closed.
P, requires in time high energy E.
The solution is limited to small H decreases.
In West Europe, the water consumption is registered
for decades. Means that from long time ago the users 3.3.2. The pumps are repeated retrofitted by re-
were interested to save water, consuming only what designing the hydraulic part to be correspond to
is necessary. Therefore in the EU, long time ago the the new conditions Q, H, other then those provided
specific consumption of water is low. by the initial design. The efficiency of the pumps
Following this, the flows Q and the pumping heads may decrease a little.
H are variable, but only for short period of time (hours,
3.3.3. The driving motors are replaced by others
daily, from one season to another).
with lower powers and speeds according to the new
From one year to another, in EU the flows Q and the
decreased H values.
pumping heads H required for the pumping stations
Being of great advantage, in all cases it must be
for the water supply are practically modified only if
calculated if this solution is possible.
the number of users is modified.
Only in 1995 Romania started with organizing the 3.3.4. The pump speed is decreased by using gearbox
registration of the water consumption in five cities. and by the replacement of the planet wheels.
Next will be a general recording all over the country. The replacing of the wheels means the dismounting
In the Romanian cities, were the water registration and re–mounting of the gearbox, and the alignment of
was performed, the consumers were drawn in to save the shafts. There are few cases of pumps with reduction
water. Before recording the water consumption in cities gears but in all this cases must be taken into account
the specific consumes were high. After the recording, this solution.
the specific consumption decreased step by step in In such cases it may be also lucrative the replacing of
some years up to normal European values. the driving motors of the pumps by others with lower
This decrease also reduced the energy consumption, powers (in order to leave an optimum motor loading,
but it raised a new technical problem it seems to be operating at high efficiency and high cos F).
unprecedented.
Once with the water consumption decrease, the flow 3.3.5. On pumps being directly driven by electric
Q goes down, the water speeds v goes down and also motors, between the pumps and motors there are
the hydraulic losses Hr and the pumping heads H. mounted mechanic speed reducers (which have very
For instance, in a city the value from H = 58 m in high efficiencies, ~ 99 %).
1996 now is H = 20 – 25 m, after registration. By means of the reducers, the pump speed is reduced
The matter consists in the fact that, after the (repeatable) at the necessary values, which are corre-
registration the H values are step by step decreasing, sponding, to the decreased H values. In such cases it
may be also lucrative to replace de driving motors of

244
the pumps by others of lower powers (in order to have • Sometimes, the existent motor and / or pump can
an optimum motor loading, operating by high effi- be reused (but upgraded)
ciency and cos F) and with higher speeds (in order
to have as small as possible motors). 4. CONCLUSIONS
The solution needs also the modification of the By upgrading at S.C. AVERSA SA of some existent
foundation. pumps installed before 1990 it was succeed in:
3.3.6. The pumps are replaced by others corresponding • Rising the efficiency of these pumps at international
with the values Q, H after registration. level (over 91 % at 18 NDS).
We underline that, if the pumps will be replace, • Adaptation individually of the pumps at the concrete
according to the records for the individual consume requirements of the pumping station performing also
of water and if this specific consume is high, it is a an optimum loading of the driving motors. It was
risk to use even better pumps. In this case is unavoidable obtained a perfect synergy between the operational
the decreasing of the values Q and mostly H is not parameters of the pump of the motor and of the
according to the registration. pumping installation.
Such a case can be mentioned, where it was simul- • In general, using this upgrading of the existent pumps
taneous projected the pump replacement and the reg- can also obtained in the water supply, global effi-
istration [8]. ciencies bigger than those obtained by some per-
At the pumps selection there have been taken into formed investments and the costs of these upgrading
account the values Q, H resulted by measurements shall be in many cases smaller than the cost of the
before registration. already performed investments.
The project of the pumps replacement was approved • In the water supply of the cities before the water
by a prestigious company from West Europe (where registration of the individual users was performed,
the registration was performed long time ago and did the specific consumes have been very high, after
not decrease the specific consume, but keep them low). registration they are decreasing. So, the required
The result of this uninspired selection was that, imme- values Q and H are decreasing, making the pumps
diately after putting into operation, the pumps had to unsuitable for the high values before registration.
pump with the discharge valves more closed, till a new This matter did not appear in the countries where
investment. The required H values in the network the registration was performed long time ago, but it
decreased considerable as a result of the registration. appeared or shall appear after some time, in mostly
This damaging experience must not be repeated. of the Romania cities and not only.
3.3.7 Converting the supply current of the driving In this work there have been analyzed also the
motors must decrease the pump speed. solutions of this new appeared matter.
At a pumping station, pumping in parallel in the
some network it may be efficient to adjust the speed
at one or maximum two pumps. It is not efficient to BIBLIOGRAPHY
adjust the speed of all pumps, being expensive and 1. PANDELEA Gheorghiţă, Contributions to the
in this case, the global efficiency of each pumping improvement of the operational performances of
group is affected by the converter efficiency and of the the aggregates from the pumping stations; written
possible transformers. paper for the doctor's degree, Bucharest, October
3.3.8. There are new solutions [6], [7] that can 2003
replace the groups built up of a motor a gearbox 2. Ceramitech, Performance testing of pump coatings
and a pump, operating at constant speeds, but easily an end suction centrifugal pump of unit speed,
changeable. National Engineering Laboratory, Glasgow – UK,
Unlike the replaced groups, these modifications do June 1997
not need dismounting of machines and alignments of
3. AVERSA S.A Bucharest, Hydraulic Energetic Test
the shafts.
Sheet of the NDS 350-300-460 pump for Ocna
Further, these solutions have the following advantages:
Mures, 27 Nov. 2003
• Assure high global efficiencies on large operating
4. AVERSA S.A Bucharest, Hydraulic Energetic Test
fields.
Sheet of the NDS 500-450-700 pump for
• Easily adapting to the modified values Q, H of the Ocna Mures, 8 May 2004
initial project.

245
5. The Government Ruling no. 15 / 1995, published in
the Official Gazette, part I, no. 168 from 1.08.1995
6. OSIM Dossier:A00572-2003 Pumping - results and technical possibilities - the
7. OSIM Dossier: A00981-2003 3rd lecture of the Hydraulic Energetic Specialists,
8. VERTAN Gheorghe, MATEI Gheorghe, PAN- Politehnica University of Bucuresti, 28 - 29 May
DELEA Gheorghită, FURCA Ludovic., GÂRDAN 2004
Dumitru, BOITOŞ M. R. The Efficiency of the

246

You might also like