AGUA m3 37.1600
AFIRMADO m3 16.3392
TOTAL
620.71
166.35
5.00
3.00
45.79
4.10
0.10
193.77
14.40
3.00
52.00
13,434.95
51.68
145.04
36.25
76,039.79
128.00
1,024.00
0.10
0.15
441.15
441.15
183.66
75.50
16.00
32.00
0.96
42.91
77.25
153.76
0.13
0.40
429.15
2.03
1,500.00
15.00
8,088.16
3,384.00
45.94
568.96
204.12
5,897.37
84.00
24.00
7.92
61.74
60.00
0.49
49.69
29.00
16.00
212.50
360.00
112.00
155.52
22.68
45.36
45.80
90.10
6.00
49.50
40.00
800.00
20.00
10.00
70.00
60.00
116,000.08
0.050
5,800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIAS
PROYECTO : “CREACION DEL CAMINO VECINAL PUCURHUAY - HUAPA, DE DISTRITO DE TICLACAYAN – PASCO - PASCO”
COSTO
COSTO X
UNIDAD DESCRIPCIÓN DE EQUIPOS LIVIANOS HORA DE
MOBILIDAD
COSTO
COSTO X
UNIDAD DESCRIPCIÓN DE MAQUINARIA AUTOPROPULSADOS HORA DE
MOBILIDAD
CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000
1.00 2.50 25.20
CAMION VOLQUETE 15 M3.
2.00 2.50 25.00
IDA Y VUELTA
Consideraciones:
Los equipos transportados se tomara en cuenta desde la ciudad de Huánuco
RESUMEN
1.0 EQUIPO TRANSPORTADO
2.0 EQUIPO AUTOTRANSPORTADO
TOTAL MOVILIZACION Y DESMOVILIZACION
MAQUINARIAS
LACAYAN – PASCO - PASCO”
COSTO DE
TRASLADO
2,625.00
2,275.00
2,275.00
1,400.00
2,800.00
11,375.00
446.04
225.00
150.00
821.04
63.00
125.00
187.98
15-22 TON)
S/. 187.98
S/. 12,196.04
S/. 12,384.02