METHOD STATEMENT FOR THE MSM : 003 part-2

INSTALLATION OF CHILLED Rev. : 0


WATER PIPING SYSTEM Page : 1 of 5
Date : 29.01.01

01. SCOPE
01.1 This procedure covers the procedure for installation, inspection and testing of chilled
water pipe-work & accessories, painting and insulation works.

02. PURPOSE
02.1 Purpose of this procedure is to define the inspection, testing, method and criteria for
installation work for chilled water pipework & accessories to achieve mechanical
completion.

03. REFERENCES
03.1 Specification 1210 S1 – Chilled Water Pipes
03.2 Specification 1212 - Insulation and lagging
03.3 NFPA 90A

04. PROCEDURE
04.1 GENERAL REQUIRMENTS
04.1.1. All material received at site shall be inspected by the engineer’s
representative handled and stored upon receipt.
04.1.2. All installation / Construction / Testing works shall be carried out in
compliance with the safety manual.
04.1.3. Inspection and testing shall be conducted by the site vendor supervisor and /
or be co-ordinated with Mechanical representative.(If applicable)

04.2 INSTALLATION OF CHILLED WATER PIPE SUPPORTS


04.2.1. GENERAL: Install hangers, supports, clamps, and attachments as required to
properly support piping from building structure.
04.2.2. Arrange for grouping of parallel runs of horizontal piping supported together
wherever possible. Install supports with maximum spacing.
04.2.3. Where pipes of various sizes are supported together by trapeze hangers,
space hangers for smallest pipe size or install intermediate supports for
smaller diameter pipes.
04.2.4. Install mechanical-anchor fasteners in concrete after concrete is placed and
completely cured.
04.2.5. Install hangers & supports complete with necessary anchors, inserts, bolts,
rods, nuts, washers & other accessories.
04.2.6. Install hangers & supports to allow controlled movement of piping systems,
permit freedom of movement between pipe anchors, and facilitate action of
Expansion joints, expansion loops, expansion bends, & similar units.
04.2.7. Load Distribution: Install hangers & supports so that piping live and dead
loading and stresses from movement will not be transmitted to connected
equipment.
04.2.8. Insulated Piping: Comply with the following installation requirements.
a. Clamps: Attach clamps, including spacers(if any), to piping with