You are on page 1of 26

Table of Contents

1. Project Overview................................................................................................ 2
2. Scope .................................................................................................................. 2
3. Abbreviation and Definition .............................................................................. 2
3.1. Abbreviation .......................................................................................................................... 2
3.2. Definition ................................................................................................................................ 3

4. Reference ........................................................................................................... 3
4.1. COMPANY Document ........................................................................................................... 3
4.2. Code Reference Document .................................................................................................. 3

5. Calculation Basis ............................................................................................... 3


6. Material Properties ............................................................................................ 3
6.1. Scaffolding Tubes Material .................................................................................................. 3
6.2. MEVA Formwork H20 Girder Material ................................................................................. 4
6.3. Push-Pull Props RSS II Material .......................................................................................... 4
6.4. Push-Pull Props Kickers AV Material .................................................................................. 5
6.5. Calculation for Roof Slab Formwork Support .................................................................... 5
6.5.1. Modelling Description ...................................................................................................... 5
6.5.2. Loading Definition............................................................................................................ 8
6.5.3. Loading Methodology ...................................................................................................... 9
6.5.4. Structural Analysis Result ............................................................................................. 11
6.5.5. Structural Capacity Check ............................................................................................. 13
6.6. Calculation for Roof Beam Formwork Support ................................................................ 14
6.6.1. Modelling Description .................................................................................................... 14
6.6.2. Loading Definition.......................................................................................................... 16
6.6.3. Loading Methodology .................................................................................................... 17
6.6.4. Structural Analysis Result ............................................................................................. 19
6.6.5. Structural Capacity Check ............................................................................................. 20
APPENDIX-1 Average Wind Speed Record at Bintuni ........................................ 21
APPENDIX-2 Detail Calculation ............................................................................. 22
APPENDIX-3 MEVA Girder Catalogue .................................................................. 23
APPENDIX-4 BS-1139 Scaffolding Mill Certificate ............................................... 24

Page 1 of 24
6.4. Push-Pull Props Kickers AV Material

Kickers AV properties in accordance to PERI catalogue

Table-4
Description Value Unit
Perm. Compressive force Pu 14.2 kN
Perm. Tension force Tu 26.3 kN

6.5. Calculation for Roof Slab Formwork Support

6.5.1. Modelling Description

The roof formwork form work will be supported by BS scaffolding tubes. These supports will sustain
dead load and live load. The configuration of wall formwork as shown on Figure 14. The brace
connection is considered as pinned tipe. The calculation is assessed for particular section as shown
on Figure 15.

Figure 14. Roof slab formwork configuration

Page 5 of 24
Figure 15. Roof slab formwork configuration

Figure 16. Roof Slab Scaffolding Support configuration section view

Page 6 of 24
Figure 17. Roof Slab Scaffolding Support configuration elevation view

Figure 18. Structural Analysis Model by Staad Pro

Page 7 of 24
Figure 19. Supports/bracings are considered as pinned connection

6.5.2. Loading Definition

The load applied on the wall formwork as follow:


a. Dead Load (DL)
• Scaffolding self-weight DLscaff
• Meva deck Dlform = 70 kg/m2
• Meva Girder DLgir = 5.47 kg/m
• Wet Concrete Slab DLconc = 62.5 kg/m2

b. Live Load
• Working live load LLcst = 250 kg/m2

c. Wind Load (WL)


60 % load reduction for temporary facility
• P (Wind load) = windward = 0.49 kN/m2

Wind Load X Direction


• Surface area = 0.7 x 0.3 = 0.21 m2
• Wind load = 0.1 kN (For detail calculation see attachment ,,,)

d. Seismic Load
For temporary condition the acceleration my be reduced, and to be applied as 20% acceleration.
Total Weight
• Length of model = 2.8 m
• Tributary width = 0.7 m

Page 8 of 24
Self weight = 1.69 kN
Unmodeled DL = 17.864 kN
Total Mass = 19.554 kN
Vx = ……………(For detail calculation see attachment
2)
= 0.21353 kN

6.5.3. Loading Methodology

The loads will applied perpendicular to the roof formwork (plywood) and transferred to each
secondary girder, and calculated/designed for tributary area as 700 mm of width. The load from
secondary girder will be transferred to primary girder which supported by scaffolding support. The
load pattern tributary area assessed for one girder (secondary girder) and the arrangement will be
applied to the othe girder. The load considered as length uniform load which applied to secondary
girder as basis for load input on structural analysis program.

Figure 20. Loading Transfer Philosophy

The applied load on each girder can be calculated as follow:

• Girder to girder distance lg = 300 mm


= 0.3 m
• Roof Slab Thickness Tslab = 250 mm
= 0.25 m
• Dead Load Calculation
o Formwork length uniform load qlfom = Dlform x lg
= 70 x 0.3
= 21 kg/m
o Secondary girder uniform load qLgir = DLgir
= 5.47 kg/m
o Dead Load DL = qlform + qLgir
= 21 + 5.47

Page 9 of 24
= 26.47 kg/m
• Live Load Calculation
o Concrete length uniform load qconc = LLconc x Tslab x lg
= 2400 x 0.25 x 0.3
= 180 kg/m
o Construction length uniform load qcst = LLcst x lg
= 235 x 0.3
= 70.5 kg/m
o Live Load LL = qconc+ qLcst
= 180 + 70.5
= 250.5 kg/m

Typical loading for each girder as shown on Figure 19.

The applied load combination refers to ASCE/SEI 7-10 Section 2.3 as follow:
• COMB1 = 1.D
• COMB2 = 1.D + 1.L
• COMB3 = 1.D + 0,75.L
• COMB4 = 1.D + 1.WL
• COMB5 = 1.D + 0,7E
• COMB6 = 1.D + 0,75L + 0,75.W
• COMB7 = 1.D + 0,75L + 0.75.E
• COMB8 = 1.D + 0,6D + 1.W
• COMB9 = 1.D + 0,6D + 0,7.E

Figure 21. Roof Slab formwork support loading

Page 10 of 24
6.5.4. Structural Analysis Result

The output forces assessed for formwork support (scaffolding tube) and MEVA girder H20.

Maximum axial load for formwork support frame taken for 10 highest force members in consecutive
order

Table-21
Analysis Design Actual Allowable Normalized Ratio
Beam
Property Property Ratio Ratio (Actual/Allowable)
1 PIPE PIPE 0.032 1 0.032
2 PIPE PIPE 0.244 1 0.244
3 PIPE PIPE 0.158 1 0.158
4 PIPE PIPE 0.247 1 0.247
5 PIPE PIPE 0.062 1 0.062
6 PIPE PIPE 0.239 1 0.239
7 PIPE PIPE 0.059 1 0.059
8 PIPE PIPE 0.239 1 0.239
9 PIPE PIPE 0.062 1 0.062
10 PIPE PIPE 0.047 1 0.047
11 PIPE PIPE 0.062 1 0.062
12 PIPE PIPE 0.006 1 0.006
13 PIPE PIPE 0.063 1 0.063
14 PIPE PIPE 0.007 1 0.007
15 PIPE PIPE 0.061 1 0.061
16 PIPE PIPE 0.006 1 0.006
17 PIPE PIPE 0.034 1 0.034
18 PIPE PIPE 0.01 1 0.01
19 PIPE PIPE 0.05 1 0.05
20 PIPE PIPE 0.09 1 0.09
21 PIPE PIPE 0.015 1 0.015
22 PIPE PIPE 0.093 1 0.093
23 PIPE PIPE 0.004 1 0.004
24 PIPE PIPE 0.063 1 0.063
25 PIPE PIPE 0.007 1 0.007
26 PIPE PIPE 0.046 1 0.046
27 PIPE PIPE 0.002 1 0.002
28 PIPE PIPE 0.044 1 0.044
29 PIPE PIPE 0.09 1 0.09
30 PIPE PIPE 0.009 1 0.009
31 PIPE PIPE 0.065 1 0.065
32 PIPE PIPE 0.004 1 0.004
33 PIPE PIPE 0.089 1 0.089
34 PIPE PIPE 0.002 1 0.002
35 PIPE PIPE 0.048 1 0.048

Page 11 of 24
36 PIPE PIPE 0.016 1 0.016
37 PIPE PIPE 0.046 1 0.046
38 PIPE PIPE 0.067 1 0.067
39 PIPE PIPE 0.046 1 0.046
40 PIPE PIPE 0.089 1 0.089
41 PIPE PIPE 0.016 1 0.016
42 PIPE PIPE 0.09 1 0.09
43 PIPE PIPE 0.012 1 0.012
44 PIPE PIPE 0.16 1 0.16
45 PIPE PIPE 0.048 1 0.048
46 PIPE PIPE 0.005 1 0.005
47 PIPE PIPE 0.005 1 0.005
48 PIPE PIPE 0.068 1 0.068
49 PIPE PIPE 0.007 1 0.007
50 PIPE PIPE 0.065 1 0.065
51 PIPE PIPE 0.004 1 0.004
52 PIPE PIPE 0.061 1 0.061
53 PIPE PIPE 0.018 1 0.018
54 PIPE PIPE 0.003 1 0.003
55 PIPE PIPE 0.004 1 0.004
56 PIPE PIPE 0.004 1 0.004
57 PIPE PIPE 0.005 1 0.005
58 PIPE PIPE 0.005 1 0.005
59 PIPE PIPE 0.005 1 0.005
60 PIPE PIPE 0.005 1 0.005

Maximum Bending Moment for formwork support frame due to self-weight

Page 12 of 24
6.5.5. Structural Capacity Check

Design check result refer to structure analysis program as shown on figure 22

Figure 22. Design Check Result

Page 13 of 24
6.5.5.1. Deflection Check

Horizontal Vertical Horizontal Resultant Rotational


Node L/C X mm Y mm Z mm mm rX rad rY rad rZ rad
Max X 36 13 GENERATED AISC GENERAL 8 0.494 -0.244 0 0.551 0 0 0
Min X 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Max Y 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Min Y 7 7 GENERATED AISC GENERAL 2 0.354 -0.347 0 0.496 0 0 0
Max Z 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Min Z 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Max rX 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Min rX 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Max rY 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Min rY 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Max rZ 3 7 GENERATED AISC GENERAL 2 0.345 -0.18 0 0.389 0 0 0.001
Min rZ 2 7 GENERATED AISC GENERAL 2 0.362 -0.173 0 0.401 0 0 -0.001
Max Rst 36 7 GENERATED AISC GENERAL 2 0.491 -0.256 0 0.553 0 0 0

6.6. Calculation for Roof Beam Formwork Support

6.6.1. Modelling Description

The roof formwork form work will be supported by BS scaffolding tubes. These supports will sustain
dead load and live load. The configuration of wall formwork as shown on Figure 1. The brace
connection is considered as pinned tipe

Figure 23. Roof slab formwork configuration

Page 14 of 24
Figure 24. Roof Slab Scaffolding Support configuration section view

Figure 25. Supports/bracings are considered as pinned connection

Page 15 of 24
Figure 26. Supports/bracings are considered as pinned connection

6.6.2. Loading Definition

The load applied on the beam formwork as follow:


e. Dead Load (DL)
The selfweight of scaffolding pipe is determined directly in the Software analysis as 1 g
The analysis is set for Tributary area 700 mm
• Scaffolding self-weight DLscaff
• Meva deck Dlform = 70 kg/m2
• Meva girder DLgir = 5.47 kg/m
• Wet concrete beam (1200x400mm) DLconc = 2232 kg/m

f. Live Load
• Working live load LLcst = 250 kg/m2
= 2.46 kN/m2

Tributary width = 0.9 m


Tributary length = 0.7 m
Point load = 0.7749 kN

g. Wind Load (WL)


60 % load reduction for temporary facility
• P (Wind load) = windward = 0.49 kN/m2

Wind Load X Direction


• Surface area = 0.7 x 0.3 = 0.21 m2
• Wind load = 0.1 kN

Page 16 of 24
h. Seismic Load
For temporary condition the acceleration my be reduced, and to be applied as 20% acceleration.
Total Weight
• Length of model = 2.8 m
• Tributary width = 0.9 m
Self weight = 0.626 kN
Unmodeled DL = 15.92 kN
Total Mass = 16.546 kN
Vx = 0.180682 kN

6.6.3. Loading Methodology

The live load will applied perpendicular to the roof formwork (plywood) and transferred to each
secondary girder. The load from secondary girder will be transferred to primary girder which
supported by scaffolding support. The load pattern tributary area assessed for one girder (secondary
girder) and the arrangement will be applied to the othe girder. The load considered ad length uniform
load which applied to secondary girder as basis for load input on structural analysis program.

Figure 22 Loading Transfer Philosophy top view

Figure 23. Loading Transfer Philosophy section view

Page 17 of 24
The applied load on each girder can be calculated as follow:

• Girder to girder distance lg = 250 mm


= 0.25 m
• Roof Slab Thickness Tbalk = 1200 mm (Taken for highest balk dimension)
= 1.2 m

• Dead Load Calculation


o Formwork length uniform load qlfom = Dlform x lg
= 70 x 0.25
= 17.5 kg/m
o Secondary girder uniform load qLgir = DLgir
= 5.47 kg/m
o Dead Load DL = qlform + qLgir
= 17.5 + 5.47
= 22.97 kg/m

• Live Load Calculation


o Concrete length uniform load qconc = LLconc x Tbalk x lg
= 2400 x 1.2 x 0.25
= 720 kg/m
o Construction length uniform load qcst = LLcst x lg
= 235 x 0.25
= 58.75 kg/m
o Live Load LL = qconc+ qLcst
= 720 + 58.75
= 778.75 kg/m

Typical loading for each girder as shown on Figure 24.

The applied load combination refers to ASCE/SEI 7-10 Section 2.3 as follow:
• COMB1 = 1.D
• COMB2 = 1.D + 1.L
• COMB3 = 1.D + 0,75.L
• COMB4 = 1.D + 1.WL
• COMB5 = 1.D + 0,7E
• COMB6 = 1.D + 0,75L + 0,75.W
• COMB7 = 1.D + 0,75L + 0.75.E
• COMB8 = 1.D + 0,6D + 1.W
• COMB9 = 1.D + 0,6D + 0,7.E

Page 18 of 24
Figure 24. Loading Transfer Philosophy section view

6.6.4. Structural Analysis Result

The output forces assessed for formwork support (scaffolding tube) , UNP80, and MEVA girder H20.

Maximum axial load for formwork support frame taken for 10 highest force members in consecutive
order

Table-29
Analysis Design Actual Allowable Normalized Ratio
Beam
Property Property Ratio Ratio (Actual/Allowable)
1 PIPE PIPE 0.097 1 0.097
2 PIPE PIPE 0.011 1 0.011
3 PIPE PIPE 0.089 1 0.089
5 PIPE PIPE 0.097 1 0.097
6 PIPE PIPE 0.023 1 0.023
9 PIPE PIPE 0.003 1 0.003
11 PIPE PIPE 0.119 1 0.119
12 PIPE PIPE 0.122 1 0.122
13 PIPE PIPE 0.119 1 0.119
16 PIPE PIPE 0.002 1 0.002
18 PIPE PIPE 0.117 1 0.117
21 PIPE PIPE 0.013 1 0.013
22 PIPE PIPE 0.089 1 0.089
23 PIPE PIPE 0.116 1 0.116
24 PIPE PIPE 0.116 1 0.116
25 PIPE PIPE 0.005 1 0.005
26 PIPE PIPE 0.005 1 0.005
27 PIPE PIPE 0.005 1 0.005

Page 19 of 24
6.6.5. Structural Capacity Check

Design check result refer to structure analysis program as shown on figure 25

Figure 25. Design Check Result

6.6.5.1. Deflection Check

Horizontal Vertical Horizontal Resultant Rotational


Node L/C X mm Y mm Z mm mm rX rad rY rad rZ rad
Max X 2 10 GENERATED AISC GENERAL 5 0.535 -0.378 0 0.655 0 0 0
Min X 2 17 GENERATED AISC GENERAL 12 -0.245 -0.249 0 0.35 0 0 0
Max Y 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Min Y 3 13 GENERATED AISC GENERAL 8 0.459 -0.433 0 0.631 0 0 0
Max Z 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Min Z 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Max rX 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Min rX 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Max rY 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Min rY 1 6 GENERATED AISC GENERAL 1 0 0 0 0 0 0 0
Max rZ 1 17 GENERATED AISC GENERAL 12 0 0 0 0 0 0 0
Min rZ 4 10 GENERATED AISC GENERAL 5 0 0 0 0 0 0 -0.001
Max Rst 3 10 GENERATED AISC GENERAL 5 0.534 -0.41 0 0.673 0 0 0

Page 20 of 24
APPENDIX-2 Detail Calculation

Page 22 of 24
A2.1 Dead Load
The selfweight of Scaffolding pipe is determined directly in the Software analysis as 1 g

The analysis is set for Tributary area 700 mm


Un-modelled Dead load
2
- Meva deck = 70 kg/m
- Meva girder = 5.47 kg/m
2
- Wet Concrete Slab = 62.5 kg/m (250 mm Thickness)

+
-Total un-modelled Dead load = 132.5 kg/m
2
=
Tributary width = 0.7 m

Line load = 6.38 kN/m

A2.2 Live Load


2
Working Live Load = 250.00 kg/m
2
2.46 kN/m
Tributary width = 0.7 m

Line load = 1.722 kN/m

A2.2 Wind Load


RC = Risk category = II
v = Basic wind speed = 40.90 m/s
E Exposure category = c
Kd = Wind directionality factor = 0.85
Kzt = Topographic factor 1.00
z = Height of structure = 3.00 m
Lx = Width of building in X Direction = 30.00 m
Lz = Width of building in Z Direction = 70.00 m
= = 274.32 m
a = = 9.50
Kz = Velocity pressure coef. = 0.85
= 2.01 * (z/z )(Zia) for 4.50 m ::; z ::; z 9
9

= 2.01 * (4.5/z )(Zia) for< 4.5


9
2
qz = Velocity pressure = 0.74 kN/m
2
= 0.613 * Kd * Kzt * Kz * V

h = Mean roof height = 5.48 m


Kzh = Velocity pressure coef. = 0.88
= 2.01 * (z/z )(Z/a) for 4.50 m ::; z ::; z 9
9

= 2.01 * (4.5/z )(Z/a) for< 4.5


9
2
qh = Velocity pressure mean roof heigh = 0.77 kN/m
2
= 0.613 * Kd * Kzt * Kz * V

- Wind load for roof Open structure Toward Away


GCpi = Internal Pressure Coefficient (Table 26.11-1) = 0 0
G = Gust Effect = 0.85
Cp = External Pressure Coefficient (Fig- 27.4-1, 27.4-2)
p qGCp - qi(GCpi)
h/Lx = 0.18
h/Lz = 0.08
Lx/Lz = 0.43
Lz/Lx = 2.33
Wind X Dir (Normal to ridge)
Cd = Windward Wall = 1.30 Backisting

P (Wind Lo= Windward Wall = 0.81

60% load reduction for Temporary Facility

P (Wind La = Windward = 0.49


WIND LOAD X DIRECTION
Surface area= 0.7 * 0.3 = 0.21 m2
Wind load = 0.1 kN

_ _...,.,....,o -·~-~-vv o..Q ~.·•v~·v- ~ ~-v---• (J/J • Y __ .. v•v• ••••·().


i
I II II i
i I
;I'
b--·· ········-········J:,··-·················--~·-···-·--··········-~---····---+~-- ·0
' I ! : I
! i ' I /
i I II
I . .Y
I /!
I I I ! I
~- --<·,( I .~
i . 1/ I
~I ' I I
i' ~~· I I
: ' I 'I /
~~-o--+-J~-Q
I 1/ I . I
j if : i
! /1 I i
I /! I I
i /I I I
l/'"
~ .
I
o- ' - -l - -09- -o.o- - -<>
: I
I
I
' ~
. II
I
13 ~ ~ ~
A2.4 Seismic Load h
3.8.1 Static Seismic Force- Equivalent Lateral Force
RC = Risk category = 2
sc = Seismic design category = D
Rz = Response modification coeff. = 3.250
Transverse Steel Ordinary Concentrically Braced Frame
Rx = Response modification coeff. = 3.250
Longitudinal Steel Ordinary Concentrically Braced Frame
TL = Long-period transition period = 10
p = Redundancy factor = 1.3
OBECase

le = Importance factor = 1.500

OBECase
Design
Sos = spectral = 0.630
20% = 0.126 Temporary facility
ues1gn
So1 = c:nor-tr:ol = 0.365
20% = 0.073 Temporary facility

OBECase
To = 0.2 So1/Sos = 0.116

Ts = So1/Sos = 0.579

Ugger Limit on Calculated Period


Type = Structure type = Steel eccentrically braced frame
Cu = Response modification coeff. = 1.40
c, = = 0.073
X = = 0.750
hn = Structural height = 5.000 m

Tx = Ct * hnx = 0.244 sec

check :
Tx-max :5 Cu * C, * hnx

= 1.4 * 0.0731 * (5" 0.75) = 0.342 sec OK!


0.342 sec OK!
Tx- max < 3.5 T 5

= 3.5 * 0.701 = 2.452 sec OK!


Tx- used = Min(Tx-max, Tx) = 0.244 sec
2/3 MCER Case
= Seismic response coeff.
= S0 s I (Rx lie) = 0.287
= 0.244 s, S ax-E = 0.244

C sx -max = = 0.11 3
(Rx lie)
C s- min = 0.044 S 0 s le 2: 0.01 = 0.042
C s - min = 0.5 S 1 I (R lie) for S 1 2: 0.6 g
C sx- used = 0.042
C sx- used = 0.042
Vx = Seismic base shear = 1.3 * 0.042 * 'i.Wt
= p* C sx * 'i.Wt empty condition
= 0.0546 * 'i.Wt
For Temporary condition the acceleration may be reduced, and to be applied as 20% acceleration
Vx = 0.011 * 'i.Wt

Total Weight

Length of model = 2.8 m


Tributary width = 0.7 m
1 Self weight = 1.69 kN
2 Unmodeled DL = 17.864 kN

Total Mass = 19.554 kN

Vx = 0.21353 kN
A2 Loading Input

A2.1 Dead Load


The selfweight of Scaffolding pipe is determined directly in the Software analysis as 1 g

The analysis is set for Tributary area 700 mm


Un-modelled Dead load Length Qty
2
- Meva deck = 70 kg/m 1.1
- Meva girder = 5.47 kg/m 2.00
-Wet Concrete Beam (1200x400) = 2232 kg/m

Tributary Length = 0.7 m

Point Load = 7.96 kN

A2.2 Live Load


2
Working Live Load = 250.00 kg/m
2
2.46 kN/m
Tributary width = 0.9 m
Tributary length = 0.7 m
Point Load = 0.7749 kN

A2.2 Wind Load


RC = Risk category = II
v = Basic wind speed = 40.90 m/s
E Exposure category = c
Kd = Wind directionality factor = 0.85
Kzt = Topographic factor = 1.00
z = Height of structure = 3.00 m
Lx = Width of bu ilding in X Direction = 30.00 m
Lz = Width of building in Z Direction = 70.00 m
= = 274.32 m
a = = 9.50
Kz = Velocity pressure coef. = 0.85
= 2.01 * (z/z ) (2ta) for 4.50 m ::; z::; z
9 9
2
= 2.01 * (4.5/z ) ( /a) for< 4.5
9
2
qz = Velocity pressure = 0.74 kN/m
= o.613 * Kd * Kzt * Kz * V2
h = Mean roof height = 5.48 m
Kzh = Velocity pressure coef. = 0.88
= 2.01 * (z/z ) (Zi a) for 4.50 m ::; z ::; z 9
9

= 2.01 * (4.5/z 9 ) (2ta) for < 4.5


2
qh = Velocity pressure mean roof heigh = 0.77 kN/m
2
0.61 3 * Kd * Kzt * Kz * V

-Wind load for roof Open stru cture Toward Away


GCpi = Internal Pressure Coefficient (Table 26.11-1) = 0 0
G = Gust Effect = 0.85
Cp External Pressure Coefficient (Fig- 27.4-1, 27 .4-2)
p = qGCp - qi(GCpi)
h/Lx = 0.18
h/Lz = 0.08
Lx/Lz = 0.43
Lz/Lx = 2.33
Wind X Dir (Normal to ridge)
Cd = Windward Wall = 1.30 Backisting

P (Wind Lo= Windward Wall = 0.81

60% load reduction for Temporary Facility

P (Wind Lo = Windward = 0.49


WIND LOAD X DIRECTION
Surface area= 0.7 * 0.3 = 0.21 m2
Wind load = 0.1 kN
A2.4 Seismic Load h
3.8.1 Static Seismic Force - Equivalent Lateral Force
RC = Risk category = 2
sc = Seismic design category = D
Rz = Response modification coeff. = 3.250
Transverse Steel Ordinary Concentrically Braced Frame
Rx = Response modification coeff. = 3.250
Longitudinal Steel Ordinary Concentrically Braced Frame
TL = Long-period transition period = 10
p = Redundancy factor = 1.3
OBECase

le = Importance factor = 1.500

OBECase
Design
Sos = spectral = 0.630
20% = 0.126 Temporary facility
ues1gn
So1 = <!nt:>rtr<:>l = 0.365
20% = 0.073 Temporary facility
OBECase
To = 0.2 S 01 /S 0s = 0.116
Ts = So1/Sos = 0.579

U~:;mer Limit on Calculated Period


Type = Structure type = Steel eccentrically braced frame
Cu = Response modification coeff. = 1.40
ct = = 0.073
X = = 0.750
hn = Structural height = 4.500 m

Tx = Ct * hnx = 0.226 sec

check:
Tx- max :5 Cu * Ct * hnx

= 1.4 * 0.0731 * (4.5" 0.75) = 0.316 sec OK!


0.316 sec OK!
Tx- max < 3.5 T5

= 3.5 * 0.701 = 2.452 sec OK!


Tx- used = Min(Tx-max, Tx) 0.226 sec
2/3 MCER Case
= Seismic response coeff.
= S 0 s I (Rx I Ie) = 0.287
for Tx = 0.226 s, = 0.226

Csx -max = = 0.104


(Rx I le)
Cs-min = 0.044 S0 s le ;:: 0.01 = 0.042
Cs-min = 0.5 S 1 I (RIle) for S 1 ;:: 0.6 g
Csx- used = 0.042
Csx- used = 0.042
Vx = Seismic base shear = 1.3 * 0.042 * l..Wt
p * Csx * l..Wt empty condition
= 0.0546 * l..Wt
For Temporary condition the acceleration may be reduced, and to be applied as 20% acceleration
Vx = 0.011 * l..Wt

Total Weight

Length of model = 2.8 m


Tributary width = 0.9 m
1 Self weight = 0.626 kN
2 Unmodeled DL = 15.92 kN

Total Mass = 16.546 kN

Vx 0.180682 kN