PDVSA

ENGINEERING DESIGN MANUAL


VOLUME 18–I

ENGINEERING SPECIFICATION

PDVSA N° TITLE

L–STC–001 CONCRETE DESIGN PROCEDURE

1 NOV.93 GENERAL REVISION 4 L.T. E.J. A.N.

0 DEC.85 FOR APPROVAL 5 J.S. J.G. E.S.

REV. DATE DESCRIPTION PAG. REV. APPD. APPD.

APPD.BY José Gilarranz DATE DEC.85 APPD.BY Eduardo Santamaria DATE DEC.85

E PDVSA, 1983 ESPECIALISTAS


ENGINEERING SPECIFICATION PDVSA L–STC–001

PDVSA
REVISION FECHA
CONCRETE DESIGN PROCEDURE
1 NOV.93
Página 1
.Menú Principal Indice manual Indice volumen Indice norma

Index
1 SCOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2 REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.1 Project Engineering Guides . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.2 Engineering Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.3 Industry References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
3 DESIGN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
3.4 Schedule of Test Cylinders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
ENGINEERING SPECIFICATION PDVSA L–STC–001

PDVSA
REVISION FECHA
CONCRETE DESIGN PROCEDURE
1 NOV.93
Página 2
.Menú Principal Indice manual Indice volumen Indice norma

1 SCOPE
This section deals with basic practices and minimum requirements governing the
selection of materials and design criteria for all concrete and is not intended to
replace the judgment of the design engineer.

2 REFERENCES
2.1 Project Engineering Guides
90615.1.003 Concrete Design
90615.1.004 Reinforced Concrete Beams
90615.1.005 Reinforced Concrete Columns
90615.1.001 Pile Foundations
90615.1.007 Vertical Vessel Foundations
90615.1.008 Horizontal Vessel Foundations
90615.1.010 Storage Tank Foundations

2.2 Engineering Specifications


A–211 Concrete Material & Construction
A–251 Concrete Bellow Grade–Design
AE–213–T Road – Reinforced Concrete
AG–212–PT Concrete Dikes for Storage Tanks
JA–251 Concrete Structure Design

2.3 Industry References


ACI American Concrete Institute
ANSI American National Standards Institute
UBC Uniform Building Code
ASTM C94 Ready Mix Concrete
ASTM C150 Portland Cement
ASTM C192 Mixing and Curing Concrete Test Specimens in the
Laboratory

3 DESIGN
3.1 A statement covering the properties of the materials and the proportion by weight
of cement, water, aggregates and additives proposed for each class of concrete
required for the job shall be submitted by the contractor.

3.2 Design strength of concrete mixes shall be not less than those given in the
following:
ENGINEERING SPECIFICATION PDVSA L–STC–001

PDVSA
REVISION FECHA
CONCRETE DESIGN PROCEDURE
1 NOV.93
Página 3
.Menú Principal Indice manual Indice volumen Indice norma

COMPRESSIVE
USE STRENGTH psi
kg/cm 2
Low strength conc. for filling purposes 100 1500
mass is the principal requirement
Conc. on or below grade such as footings, 140 2000
pile caps, tie beams, grade beams,
anchor blocks, catch basins, pumps
blocks, paving and sidewalks
Buildings, covers, girders, beams, slabs, 175 2500
stands and columns not exposed to
weather
Cast in place piling 175 2500
Bolster, girders, beams, slabs, piers and 250 3000
columns exposed to weather super
structures, concrete structures over sea
and lacustrine water, pipe supports
concrete for fireproofing
Precast pipe, crossbeam, precast conc. 250 3500
sills, ornamental conc., chimneys,
foundation in areas in contact with sulfuric
acid or sea water, separators and
reservoirs
Precast prestressed con. structures and 280 4000
precast piling
Prestressed piling Exposed to sea water 350 5000

3.3 The values shown in 3.2 represent 28 day compressive strength of normal
portland cement concrete or 7 day compressive strenght of high–early strength
conc. as determined by test on 152 mm. (6 in.) diameter by 305 mm. (12 in.) height
cylinder per Covenin 340 through to 346 (ASTM C192).

3.4 Schedule of Test Cylinders


Min. N° of
Quantity of Conc. 7 Days 8 Days
Cylinders
30 m3 or less 2 1 1
30 – 75 m3 yds. 4 2 2
75 m3 and over 6 3 3

3.5 Test specimen shall be taken and tested by an approved laboratory in accordance
with Covenin 1680, 484 (ASTM Specification C172, C31, and C39, latest issue).
Results of test shall immediatley be submitted to PDVSA’s representative.
ENGINEERING SPECIFICATION PDVSA L–STC–001

PDVSA
REVISION FECHA
CONCRETE DESIGN PROCEDURE
1 NOV.93
Página 4
.Menú Principal Indice manual Indice volumen Indice norma

3.6
a. Where the ultimate 28 day compressive strength of concrete in test cylinder
falls below the strength specified for the class of conc. tested, at below
proportional minimum 7 day strengths, the proportions, water content or
temperature conditions shall be changed to secure the required strength.
b. Concrete temperatures should be kept within desirable limits using methods
recommended in Covenin 1680, 486 (ACI 305).

3.7 A slump test shall be performed to each test cylinder taken and results recorded
will be submitted in the same report.

RECOMMENDED SLUMPS Slump in mm.


S.N°°
Type of Construction max. min.
1 Exposed roof slabs 50 25
2 Heavy mass construction 50 25
3 Pavements 75 25
4 Plain footings 75 25
5 Reinforced foundations walls and footings 75 25
6 Columns, beams, reinforced walls and slabs 100 25
Note: Max slump may be increased 25 mm. for methods of consolidation other
than vibration.

3.8 Where cylinder tests indicate strengths below those specified, at the discretion of
the PDVSA’s representative, cores shall be taken of the work as builts, and tested
in accordance with Covenin 345 (ASTM Specification C–42), latest revision. If the
tests of the core samples indicate concrete of specified strength of cores shall be
defined in each particular project, but in no case shall be less than fifteen percent
below the herein specified values. If the core tests indicate strenght of fifteen
percent or more below those specified, the cost of coring and testing shall be at
the contractor’s expense, remove all unstisfactory concrete from the work and
replace it with sound concrete of the specified strength.