2.RESTORATION OF OLD TANK PROJECT. 3.NEW HIGHWAY PROJECT. 4.TOWN PLANNING PROJECT. 5.NEW TANK PROJECT. VILLAGE WATER SUPPLY
1.KEYPLAN OF VILLAGE WATER
SUPPLY 2.BLOCK LEVELLINGS 3.LONGITUDINAL SECTION OF VILLAGE WATER SUPPLY RESTORATION OF OLD TANK PROJECT
1.KEYPLAN AND CONTOUR OF OLD
TANK 2.LONGITUDINAL SECTION OF BUND 3.CROSS SECTION OF BUND 4.BLOCKLEVELLING 5.TYPICAL CROSS SECTION OF BUND NEW HIGHWAY PROJECT
1.KEYPLAN OF NEW HIGHWAY
2.LONGITUDINAL SECTION OF HIGHWAY 3.CROSS SECTION OF HIGHWAY 4.BLOCK LEVELLINGS TOWN PLANNING
1. CONTOUR OF TOWN PLANNING AREA
2. LAYOUT OF TOWN PLANNING NEW TANK PROJECT
1. KEYPLAN OF NEW TANK
2. LONGITUDINAL SECTION OF NEW BUND 3. CROSS SECTION OF NEW BUND 4. BLOCK LEVELLING 5. KEYPLAN OF CANAL 6. LONGITUDINAL SECTION OF CANAL 7. CROSS SECTION OF CANAL
Irrigation Works: The Principles on Which Their Design and Working Should Be Based, with Special Details Relating to Indian Canals and Some Proposed Improvements
Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910, Start/End Papers
The New York Tunnel Extension of the Pennsylvania Railroad