Summary of Materials @ 01.11.2018
Type of Material Location of Source
Sinhgama Borrow Pit

Rottawewa Borrow Pit

Rottawewa Borrow Pit 2

Sub base Diyabeduma Borrow Pit

Sinhagama new Borrow Pit

Galoya Borrow Pit

Debarawewa Borrow Pit

Sinhgama Borrow Pit


Embankment
Rathmale Borrowpit
type 1 and type 2
Diyabeduma Borrow Pit

Sinhgama Borrow Pit

Shoulder Rotawewa Borrow Pit

Diyabeduma Borrow Pit

Asiri Crusher plant Ganewalpura.


ABC
Nawaloka Metal Crusher, Rathmale Minneriya

20mm Concrete Habarana Crusher plant Habarana


Aggregate NCC Crusher plant Minneriya

River sand Mahavali River, Manampitiya

Habarana Crusher plant, Habarana


Quarry Dust
NCC Crusher plant Minneriya
INSEECement (Siam CityLanka Limited)

Cement Ultratech (Ultratech Cement Lanka (pvt) Ltd

Tokyo Super/Nippon (Tokyo Cement Company (Lanka) PLC)

Concrete Mix designs G15/20, G25/20 (Self mixer)

Concrete readymix Orient readymix plant


plant KMCC readymix Plant

Water Minneriya water tank

Betto plasta (Betton Technology Lanka (pvt) Ltd)

Chryso (Chryso Lanka (pvt) Ltd)


Admixture
Daratard 17 (Set retarding Admixture)
Admixture

Daracium 100 (Water reducer and Plasticizer)

Lanwa (Ceylon Steel Corporation (pvt) Ltd)

Melwa (Melwire Rolling (pvt) Ltd)


Steel
GTB (GTB Steel Corporation (pvt) Ltd)

Captain Steel (pvt) Ltd


Access Engineering PLC - Asphalt plant, Vavuniya
Asphalt Wearing Coarse
NCC Asphalt plant, Rathmale, Minneriya.

Bitumen 60/70 (Lankem Ceylon PLC & A.N.I Enterprises (pvt) Ltd)

Cut Back Bitumen-MC/30 (Lankem Ceylon PLC & A.N.I Enterprises (pvt) Ltd)

Bituminous Material Bitumen emulsion-CSS (I) (Lankem Ceylon PLC & A.N.I Enterprises (pvt) Ltd)

Bitumen emulsion-CRS (I) (Lankem Ceylon PLC & A.N.I Enterprises (pvt) Ltd)

Bitumen 60/70 (Bitumen Emulsions (pvt) Ltd)

State Development & Construction Corporation

Hume pipe Dilani Concrete Works (pvt) Ltd)

Central concrete works, Polannaruwa


Tencate Geosynthetics Asia sdn Bhd
Geo textile
Nova Engineering Solutions (pvt) Ltd.

Bitumn Distributor WP LJ-7888

Gabion Box Anping country Long teng Metal products Co. Ltd.

Concrete Beams ICC Precast yard Madapatha

Thermo plastic and T.D.P. Thermoline


Road marking materials Levlin Engineering (pvt) Ltd

Safety way Engineering (pvt) Ltd

Road Sign Boards Dias Engineering


ANY (PVT) LTD
PROGRAMME
OM 0+000 TO 14+540KM
6/03
ls @ 01.11.2018
Submitted date Approved date Remarks
09th March 2017 03rd May 2017

27th September 2017 09th October 2017

10th January 2018 25th January 2018

05th February 2018 08th February 2018

16th February 2018 08th March 2018

3rd April 2018 24th April 2018

27th March 2018 06th April 2018

09th March 2017 03rd May 2017

30th October 2017 11th November 2017

21st February 2018 06th March 2018

09th March 2017 03rd May 2017

16th February 2018 24th February 2018

21st February 2018 06th March 2018

14th June 2017 20th July 2017

10th September 2017 27th December 2017


26th March 2017 20th May 2017

30th October 2017 11th November 2017

26th March 2017 20th May 2017

26th March 2017 20th May 2017

30th October 2017 11th November 2017

27th March 2017 09th June 2017

27th March 2017 09th June 2017

27th March 2017 09th June 2017

26th March 2017 09th June 2017

22nd January 2018 06th March 2018

03rd March 2018 27th May 2018

17th May 2017 18th July 2017

17th May 2017 09th June 2017

17th May 2017 09th June 2017

28th July 2017 28th July 2017


28th July 2017 28th July 2017

08th March 2017 03rd May 2017

08th March 2017 03rd May 2017

08th March 2017 03rd May 2017

19th November 2018 Approved


14th June 2017 29th June 2017
20th December 2017 25th January 2018

13rd March 2017 09th June 2017

13rd March 2017 09th June 2017

13rd March 2017 09th June 2017

13rd March 2017 09th June 2017

17th October 2018 Approved

24th May 2017 09th June 2017

24th May 2017 09th June 2017

19th July 2017 20th July 2017


29th May 2017 12th June 2017

22nd January 2018 25th January 2018

30th October 2017 11th November 2017

11th August 2017 01st September 2017

06th March 2018 19th April 2018

6th Apirl 2018 31st May 2018

29th August 2018 Approved

19th October 2018 Approved

01st November 2018 Approved