CALCULATE SIZE OF DIESEL GENERATOR SET Jignesh.N.Parmar www.electricalnotes.wordpress.com jiguparmar@yahoo.

com
System Voltage ( P-P ) 480 Volt Linear Load: General Equipments, Heater
System Voltage ( P-N ) 277 Volt Non-Linear Load: UPS,Invertor,Ballast,VFD
Future Load Expansion 0% % 1

Average Intermittent Use of Equipment 0.8 (0.7 To 1.0) 0.8

Total Connected Load on Diesel Generator Set Starting Condition Running Condition
Load Full Full Full
Starting Running Diversity Motor Starting Starting Starting
Sr.No Equipment Load Type Supply Qty Load Load Load
Load Kw/Hp P.F P.F Factor Starter Amp Kva Kw
Kva Kw Amp RESULTS
P-7002A Fire Water Jockey Pump Motor 3Ph 1 22.81 Kw 0.85 0.85 0.67 Y-D 87 72 61 18 15 22 Starting Kva 3432
P-7002B Fire Water Jockey Pump Motor 3Ph 1 22.81 Kw 0.85 0.85 0.67 Y-D 87 72 61 18 15 22 Starting Kw 2738
Foam proportioning skid pump Motor 3Ph 1 15 Kw 0.86 0.86 0.73 Dol 153 76 66 13 11 15 Starting Amp 4190
K-7501A Air Compressor A Motor 3Ph 1 180 Kw 0.85 0.85 0.89 Y-D 907 754 641 188 160 227 Running Kva 1290
K-7501B Air Compressor B Motor 3Ph 1 180 Kw 0.85 0.85 0.89 Y-D 907 754 641 188 160 227 Running Kw 1038
K-7501C Air Compressor C Motor 3Ph 1 0 0 0 0 0 #DIV/0! Running Amp #DIV/0!
Z-8001 Nitrogen Generation Package Motor 3Ph 1 6 Kw 0.85 0.85 1 Y-D 34 28 24 7 6 8 Alternator Details
P-9601A Diesel Unloading Pump Motor 3Ph 1 3.5 Kw 0.79 0.79 0.81 Y-D 17 14 11 4 3 4 Voltage (P-N) 277
P-9601B Diesel Unloading Pump Motor 3Ph 1 0 0 0 0 0 #DIV/0! Efficiency 80%
P-9602A Diesel Distribution Pump A Motor 3Ph 1 14.9 Kw 0.81 0.81 0.55 Y-D 49 40 33 10 8 12 Engine Overload Capacity 130% (Appro 130% To 150%)
P-9602B Diesel Distribution Pump B Motor 3Ph 1 0 0 0 0 0 #DIV/0!
200-HVC-95-01A HVAC A ( Electrical Substation) Motor 3Ph 1 60 Kw 0.6 0.6 0.8 Y-D 385 320 192 80 48 96 Required Generator Rating
200-HVC-95-02A HVAC A (Control and Telecom Building) Motor 3Ph 1 60 Kw 0.6 0.6 0.8 Y-D 385 320 192 80 48 96 Generator KVA 2746 (Select D.G near This Value)
200-ETR-00-01 480-208/120 V Essential Power/Lighting Transformer 1 Linear 3Ph 1 40 Kw 0.9 0.9 0.75 40 33 30 33 30 40 Engine KW 1080
200-ETR-00-02 480-208/120 V Essential Power/Lighting Transformer 2 Linear 3Ph 1 40 Kw 0.9 0.9 0.75 40 33 30 33 30 40
200-UPS-90-01 UPS System -Principal Feeder Non-Linear 3Ph 1 60 Kw 0.8 0.8 0.83 120 100 80 100 80 75
200-UPS-90-02 UPS System -Principal Feeder Non-Linear 3Ph 1 60 Kw 0.8 0.8 0.83 120 100 80 100 80 75 Calculate D.G Set Efficiency & Unit Calculate Approximate
200-UPS-90-03 UPS System -Principal Feeder Non-Linear 3Ph 1 60 Kw 0.8 0.8 0.83 120 100 80 100 80 75 Rate of Power Fuel Consumption
200-UPS-90-04 UPS System -Principal Feeder Non-Linear 3Ph 1 60 Kw 0.8 0.8 0.83 120 100 80 100 80 75 D.G Size ( Kva ) 1000
200-EBC-90-01 Battery Charger 125 VDC system - Emergency Linear 3Ph 1 60 Kw 0.85 0.85 0.75 64 53 45 53 45 64 D.G P.F 1 D.G Size (Kva) 115
200-EBC-90-02 Battery Charger 125 VDC system - Emergency Linear 3Ph 1 60 Kw 0.85 0.85 0.75 64 53 45 53 45 64 D.G Running Hours 20 D.G P.F 0.8
200-EDP-90-03 Diesel Generator Auxiliaries supply Linear 3Ph 1 10 Kw 0.75 0.75 1 Y-D 16 13 10 13 10 16 Diesel Consumption (Liter) 1000 D.G Operation Full Load
VFD, DAC, Start System Non-Linear 3Ph 3 Freq.Conv 0 0 0 0 0 #DIV/0! KWH Reading of Meter 10000
Turbine Enclosure Vent Fan Motor #1 Motor 3Ph 3 30 Kw 0.85 0.85 0.75 Y-D 382 318 270 79 68 96 M.F of KWH Meter 1 Required Diesel
Turbine Enclosure Vent Fan Motor #2 Motor 3Ph 3 0 0 0 0 0 #DIV/0! Diesel Rate /Liter (Rs) 40 Liter/Hour 23.11
Lube Oil Cooler Fan Motor #1 Motor 3Ph 3 7.5 Kw 0.85 0.85 0.75 Y-D 96 79 68 20 17 24 Efficiency of D.G 63%
Generator Jacking Oil Motor 3Ph 3 0 0 0 0 0 #DIV/0! KWH/Liter (Unit Per Liter) 10
Lube Oil Tank Immersion Heater Linear 3Ph 3 0 0 0 0 0 #DIV/0! Unit Rate of Power (Rs) 4.0
Pre/Post Lube Pump Motor Motor 3Ph 3 0 0 0 0 0 #DIV/0!