You are on page 1of 1

DATOS: SOLUCIONARIO:

Materia Prima
PRODUCTO Piedra Caliza Yeso Puzolanico Antes de 5% Despues de las
Mermas Mermas
Cemento Tipo I 70% 30% 0% METODO 1: 95%
Cemento Atlas 60% 20% 20% LINEA A CALIZA YESO PUZOLANA TOTAL CEMENTO (kg) CEMENTO (Bolsas)

Costo (u.m./Kg) 0.37 0.14 0.2 70% 30% 0%

TIPO 1 464,210.53 + 198,947.37 + 0.00 = 663,157.89 = 630,000.00 Kg 15,000.00 Bolsas

u.m. / Bolsa u.m. / Kg

Costo Mano de Obra 0.5 0.012

Costo Maquinaria 1 0.024 630,000.00


PRODUCTIVIDAD
CEMENTO TIPO 1 = 199,610.526 7,500.000 15,000.000
= 2.84 kg/u.m. 0.35 u.m/Kg

Capicidad LINEA A 630000 kg/dia MD MO MQ


Capicidad LINEA B 672000 kg/dia

1 Bolsa (kg) 42 kg Antes de 3% Despues de


Mermas Mermas

97%
LINEA B CALIZA YESO PUZOLANA TOTAL CEMENTO (kg) CEMENTO (Bolsas)

60% 20% 20%

ATLAS 415,670.10 + 138,556.70 + 138,556.70 = 692,783.51 = 672,000.00 Kg 16,000.00 Bolsas

RESPUESTAS:
672,000.00
PRODUCTIVIDAD = = 2.99 kg/u.m. 0.33 u.m/Kg
CEMENTO ATLAS
a) . Productividad: 200,907.216 8,000.000 16,000.000

MD MO MQ

PRODUCTIVIDAD CEMENTO TIPO 1 = 2.84 kg/u.m.

Antes de 5% Despues de
PRODUCTIVIDAD CEMENTO ATLAS = 2.99 kg/u.m.
METODO 2:
Mermas Mermas

95%
LINEA A CALIZA YESO PUZOLANA TOTAL CEMENTO (kg) CEMENTO (Bolsas)

b). Incremento de Productividad: 60% 20% 20%

ATLAS 397,894.74 + 132,631.58 + 132,631.58 = 663,157.89 = 630,000.00 Kg 15,000.00 Bolsas

INCREMENTO DE PRODUCTIVIDAD
CEMENTO TIPO 1 = 1.89%

630,000.00
PRODUCTIVIDAD
CEMENTO ATLAS = 192,315.789 7,500.000 15,000.000
= 2.93 kg/u.m. 0.34 u.m/Kg
INCREMENTO DE PRODUCTIVIDAD
CEMENTO ATLAS = -1.85%
MD MO MQ

Antes de 3% Despues de
Mermas Mermas

97%
LINEA B CALIZA YESO PUZOLANA TOTAL CEMENTO (kg) CEMENTO (Bolsas)

70% 30% 0%

TIPO 1 484,948.45 + 207,835.05 + 0.00 = 692,783.51 = 672,000.00 Kg 16,000.00 Bolsas

672,000.00
PRODUCTIVIDAD = = 2.89 kg/u.m. 0.35 u.m/Kg
CEMENTO TIPO 1
208,527.835 8,000.000 16,000.000

MD MO MQ