You are on page 1of 5

Weather and Environmental Services - QMS Manual

Document Title: Process Owner:


Design and Development Firstname Surname
Document Level: Reference No.: Revision: Page:
Process Description Q2-700-056 7A Page 1 of 5

1.0 SECTION ONE - INTRODUCTION

1.1 Purpose
This process provides a new, changed or acquired off the shelf design, process, procedure,
methodology or technology that addresses a new or changed stakeholder expectation/need. It
produces an operations-ready (i.e. validated) system from a new or changed design, process,
procedure, methodology or technology.

1.2 Scope
This process defines, the steps design and pilot teams must take in order to design a solution to
satisfy a change or new need. This process outlines the need for a new design and the steps for
development and validation of the solution.

1.3 Information ‘Turtle’


Inputs: Outputs:
• Output from Stakeholder Requirements ♦ Documentation of a new design, process,
Process (Q2-700-058), including procedure, methodology, technology
Change Plan ♦ Approved field and office technologies
• National Standards
• Quality Assurance Program Audit
Report
• Information about existing designs,
processes, procedures, methodologies,
technologies

Special Process Requirements: Process Metrics:


♦ N/A • Design fulfills needs as per requirements
• Design is deemed acceptable for
operational use by OMC-H or Regional
Manager

Human Resources: Materials & Equipment:


♦ Staff inventory: composition of the staff ♦ Field and office equipment
includes engineers, hydrologists, ♦ Station facilities and infrastructures
physical scientists, technologists and ♦ Testing tools
support staff
♦ OMH-C, Regional Manager
Linked Processes / Documents: Associated Records:
• CSB and SSC processes • Scientific/engineering Reports & Products
• Q2-423-01 Control of Documents • National Standard Operating Procedures
• Q2-424-01 Control of Records • Specifications and Drawings
• Q1-600-01 Resource Management • Validation and verification reports
• Q2-760-01 Control of Monitoring & • Decision documents from OMC-H, Regional
Measuring Devices Management meetings
• Q2-740-01 Purchasing • Decision documents from Design and Pilot Team
meetings

Approval Authority: Approved by: Date:


Director of Water Survey Firstname Surname March 9, 2016
Printed copies of this document may not be current – refer to the ISO Sharepoint site Form: QF-423-05 Rev.: 2A
Weather and Environmental Services - QMS Manual
Document Title: Process Owner:
Design and Development Firstname Surname
Document Level: Reference No.: Revision: Page:
Process Description Q2-700-056 7A Page 2 of 5

2.0 SECTION TWO – PROCESS FLOWCHART

2.01 Start Design & Development


Process
Q2-700-056

2.02 OMC-H or Regional Manager reviews


need for design

No Design
2.03 required?

OMC-H or Regional Manager facilitates design


2.04
process and assigns a design team

2.05 Design team develops, and verifies design,


process, procedure, methodology or technology

No
2.06 Verification achieved?

Is pilot project No
2.07
required?

2.08 Pilot Team develops


Pilot Project Plan

Pilot Team operates pilot and validates


2.09
design, process, methodology

No
2.10 Validation achieved?

Documentation of a new
Design/Pilot team submits design and pilot results design, process, procedure,
2.11
to OMC-H or Regional Manager for approval methodology, technology

No Implementation Process
Is it approved?
Q2-700-057

Approval Authority: Approved by: Date:


Director of Water Survey Firstname Surname March 9, 2016
Printed copies of this document may not be current – refer to the ISO Sharepoint site Form: QF-423-05 Rev.: 2A
Weather and Environmental Services - QMS Manual
Document Title: Process Owner:
Design and Development Firstname Surname
Document Level: Reference No.: Revision: Page:
Process Description Q2-700-056 7A Page 3 of 5

SECTION THREE – SUPPLEMENTAL INFORMATION


3.1 Process Notes

2.01 Start of the Design and Development Process.

2.02 A review of the design, process, procedure, methodology or technology needs is carried out by
the OMC-H or the regional Manager. The review may include work assignments to sub-
committees, task groups or outside consultants.

If the design, process, procedure, methodology or technology needs can be satisfied within
existing designs, processes, procedures methodologies or technologies then proceed to the
pilot project (step 2.05). Alternately, the needs may identify the requirements for a new or
change to the design, process or technology, procedure, methodology or technology invoking
a design process. The reviewer also defines indicators for verification of the design.

2.03 The OMC-H or the regional Manager facilitates the design process by assigning a Design
Team that may include sub-committees, WSC regional offices task groups or outside
consultants. In some instances, the design process may include the use of, or integration
with, IT infrastructures, in which case CSB/SSC process will be called upon to participate
and/or deliver related components. The Design Team develops the design.

2.04 The Design Team verifies any design changes or new design, process or technology,
procedure, methodology or technology. The verification ensures that the design outputs have
met the input requirements.

2.05 The Design Team assesses if a pilot project is required and if required assembles a Pilot
Team. The Pilot Team may be the same as the Design Team, a sub-set of the Design Team
or composed of new members. If a pilot project is not necessary, proceed to the
Implementation Process (Q2-700-057).

2.06 The Pilot Team prepares a pilot plan which details the design installation and validation criteria
in an operational setting.

2.07 The Pilot Team, with the help of regional representatives, operates the pilot in an operational
environment and identifies implementation requirements (training, user’s guide, installation
guides, etc) and gaps. This activity is critical in preparing for successful implementation
(Implementation Process Q2-700-057).

2.08 The Pilot Team reviews results and validates the solution. Validation is required to ensure that
the resulting design, process, procedure, methodology or technology is capable of meeting
the requirements for the specified application or intended use.(ex; demonstration of
performance).

2.09 Once the validation criteria are met, the Design/Pilot Team submits the design and validation
results to the OMC-H or the regional Manager for their approval.

2.10 OMC-H or the regional Manager may approve the new/changed design, process, procedure,
methodology or technology so the implementation process may begin, may reject the results
(go back to box 2.01) or may terminate the process altogether.

Approval Authority: Approved by: Date:


Director of Water Survey Firstname Surname March 9, 2016
Printed copies of this document may not be current – refer to the ISO Sharepoint site Form: QF-423-05 Rev.: 2A
Weather and Environmental Services - QMS Manual
Document Title: Process Owner:
Design and Development Firstname Surname
Document Level: Reference No.: Revision: Page:
Process Description Q2-700-056 7A Page 4 of 5

3.2 Definitions

Term Definition

Administrator The individual named by a party to a hydrometric agreement to represent


the needs and interests of that party and to approve the activities
undertaken under that agreement.
Client A person, body or agency.
Coordinating A body created by the Administrators of a hydrometric agreement to plan
Committee and manage the activities under that agreement so as to meet the needs
of the stakeholders.
Hydrometric Of or related to measurements and calculations of the velocity, discharge,
volume and other physical parameters of surface waters and surface water
bodies.
Operational Individuals within an operating party that conduct activities
Staff
Network A collection of hydrometric monitoring sites that provide spatial and
temporal information in accordance with specified parameters.
OMC-H Body made of all regional WSC managers and National representatives to
plan and manage the operational activities as to meet the needs of the
stakeholders.
Project Lead Could be any of the following; an individual, sub-committee, working group
or task group
Stakeholder Stakeholders are individuals or organizations (including clients) who are
the direct recipients of product or service, or may have an interest in the
work and policies, (for example, hydrometric agreement administrators,
clients, data users, recreational users, etc.)

Approval Authority: Approved by: Date:


Director of Water Survey Firstname Surname March 9, 2016
Printed copies of this document may not be current – refer to the ISO Sharepoint site Form: QF-423-05 Rev.: 2A
Weather and Environmental Services - QMS Manual
Document Title: Process Owner:
Design and Development Firstname Surname
Document Level: Reference No.: Revision: Page:
Process Description Q2-700-056 7A Page 5 of 5

4.0 SECTION FOUR – DOCUMENT HISTORY

Approval
Initials Name Role Approval Date
AP Firstname Surname OP lead March 9, 2016

Detailed History of Changes


Rev# Date State Description of Changes
1Dv01 Oct 15, NHP QMS QMS documents developed under NHP QMS. Documents were
2004 used to develop WES ISO
1Dv02 March, First Draft Reformatted and edited to fit WES ISO project requirements
2007
1Dv03 Jun 04, Pending Reformatted and edited to fit WES ISO project requirements
2008 Review by
WSC Core
Team
1Dv04 Jun 12, Issued for Reviewed by OMC-H, approved by OP Lead
2008 review &
approval
1A Jun 18, Approved Draft 1Dv04 approved to 1A
2008
2Dv01 Jul 10, Pending review Refining document using input from internal audit, staff training and
2008 by WSC Core others
Team
2Dv02 Aug 07, Pending review Refining document
2008 by WSC Core
Team
2Dv03 Aug 19, Issued for Reviewed by OMC-H, approved by OP Lead
2008 review &
approval
2A Aug 28, Approved Draft 2Dv03 approved to 2A
2008
3A Jun 6, Approved OP and OPSC references altered.
2010
4A Jun 5, Approved Reviewed with minor revisions
2012
5A Dec 18, Approved Reviewed and approved
2013
6D February Reviewed Reviewed with minor revisions
12, 2015
6A March 9 Approved
2015
7A March 9, Approved No change from previous version.
2016

Approval Authority: Approved by: Date:


Director of Water Survey Firstname Surname March 9, 2016
Printed copies of this document may not be current – refer to the ISO Sharepoint site Form: QF-423-05 Rev.: 2A