You are on page 1of 7

WEEKLY PROGRESS REPORT

PROJECT: INTEGRATED FIELD PLAN EXECUTION SERVICES IN SATELLITE FIELD


Client Contractor Sub-Contractor

Cut Off Date : 23MAY2019 Report no: S340HAL-SRX-PM-WPR-0001

CONTRACT NO:

Client : Vedanta Ltd., (Cairn Oil and Gas)

EPCM : Halliburton Offshore Services Inc.

Sub-Contractor : Sparklet Engineers Pvt. Ltd.

PROJECT : Integrated Field Plan Execution Services in Satellite Field

Execution by

HALLIBURTON OFFSHORE SERVICES INC

WEEKLY PROGRESS REPORT

(REPORT NO: S340HAL-SRX-PM-WPR-0001)

Progress Period: 18MAY2019 to 23MAY2019

Prepared by Reviewed by

MTN SB

422133519.doc Page | 1
WEEKLY PROGRESS REPORT
PROJECT: INTEGRATED FIELD PLAN EXECUTION SERVICES IN SATELLITE FIELD
Client Contractor Sub-Contractor

Cut Off Date : 23MAY2019 Report no: S340HAL-SRX-PM-WPR-0001

TABLE OF CONTENTS

Sr. No. Item Description Page No.


1 Project Synopsis 3
2 Project Management 4
3 Progress Statistics 4
4 HSE status 4
5 QA/QC Status 4
6 Design and Engineering status
7 Procurement Status 4
8 Subcontracting Services 4
9 Construction Status 4
10 Pre-commissioning and Commissioning Status 5
11 Interface 5
12 Reason For Delay And Liquidation Plan 5
13 Area Of Concern And Corrective Action 5
14 7 Days look ahead Plan 5
15 Inputs required from Client 5
16 Annexures 6
16.1 Progress S-Curves 6
16.2 Manpower deployment plan and status 6
16.3 Equipment deployment plan and status 6
16.4 Summary status of milestones 6
16.5 Summary Status – Engineering 6
16.6 Summary Status – Procurement 6
16.7 Summary Status – Sub-contracting 6
16.8 Construction Commodity Status 6
17 Attachments 6

422133519.doc Page | 2
WEEKLY PROGRESS REPORT
PROJECT: INTEGRATED FIELD PLAN EXECUTION SERVICES IN SATELLITE FIELD
Client Contractor Sub-Contractor

Cut Off Date : 23MAY2019 Report no: S340HAL-SRX-PM-WPR-0001

422133519.doc Page | 3
WEEKLY PROGRESS REPORT
PROJECT: INTEGRATED FIELD PLAN EXECUTION SERVICES IN SATELLITE FIELD
Client Contractor Sub-Contractor

Cut Off Date : 23MAY2019 Report no: S340HAL-SRX-PM-WPR-0001

1. Project Synopsis

1.1 Project Name : Integrated Field Plan Execution Services in Satellite Field
1.2 Client : Vedanta Ltd. (Cairn Oil & Gas)
1.3 Contractor : Halliburton Offshore Services Inc.
1.4 Location : Barmer, Rajasthan
1.5 LoA Date : 01MAY2019
Contractual
1.6 : 01JULY2020
Completion
1.6 Scope of Work : Surface Facilities

422133519.doc Page | 4
WEEKLY PROGRESS REPORT
PROJECT: INTEGRATED FIELD PLAN EXECUTION SERVICES IN SATELLITE FIELD
Client Contractor Sub-Contractor

Cut Off Date : 23MAY2019 Report no: S340HAL-SRX-PM-WPR-0001

2. Project Management

3. Progress Statistics
Weekly Cumulative
Description Wtg.
Plan Actual Variance Plan Actual Variance

Design and Engineering 5


Procurement 50
Construction 45
Total 100%

4. HSE Status

Description KPI Last Week This Week To Date

Total Project Man hours


Safe man hours
Mgt. safety meetings
Employee safety meetings
Safety Audits
First aid cases
Security Incidents
Lost Time cases
Medical Treatment
Near Misses

Drilling Surface Facility


Description HOSI Total
Contractor (Sparklet)
Open
Closed
Total YTD

Key HSE Achievements for the Week

5. QA / QC Status

422133519.doc Page | 5
WEEKLY PROGRESS REPORT
PROJECT: INTEGRATED FIELD PLAN EXECUTION SERVICES IN SATELLITE FIELD
Client Contractor Sub-Contractor

Cut Off Date : 23MAY2019 Report no: S340HAL-SRX-PM-WPR-0001

6. Design and Engineering Status:


Activities carried out during the week:
i) Site Visit
ii)
7. Procurement Status:
Activities carried out during the week:
i)
ii)
8. Sub-Contracting Services:

9. Construction Status:
Activities carried out during the week:
i)
ii)
10. Pre-Commissioning and Commissioning:

11. Interface:

12. Reason for Delay and Liquidation Plan:

13. Areas of Concern and Corrective Action:

14. Seven Day Look Ahead Plan


 Project Management

 QA / QC

 Design And Engineering
422133519.doc Page | 6
WEEKLY PROGRESS REPORT
PROJECT: INTEGRATED FIELD PLAN EXECUTION SERVICES IN SATELLITE FIELD
Client Contractor Sub-Contractor

Cut Off Date : 23MAY2019 Report no: S340HAL-SRX-PM-WPR-0001


 Procurement Status
 Construction Status

15. Inputs required from Client

16. Annexures

17. Attachments

422133519.doc Page | 7