31-May-2017

Marked up P&ID with Vendor Data Before Ship


01-Apr
01-Mar Distribution IFH 31-Aug 31-Aug
FAT END
Fire Fighting IFA 28-Jul
Software Design
Advanced
-Alarm SP List & Response Manual
30-Jun Software Design FAT END Solution
26-May -Control Narrative - BPCS Package
P&ID JB Assign
12-May -C&E NOTE:
- SIS
-JB & Terminal
INDEX -LOGIC Batch Shipping - FGS
31-Mar P&ID Refer to ICSS Shipping &
28-Jul 05-Mar SAT Schedule
Study FAT START
PACKAGE -Startup JB Wiring (SPI) 08-Jan-2018
Level 1&2 Alarm Response Manual
28-Apr 01-Dec
Main Cable SW Freeze
24-Feb Schedule (SPI) -SPI
-Process Control Narrative
31-Jan JB Location 01-Sep -Cause & Effect (Process, F&G)
INSTALL. Study (SPI) 28-Jul HW Freeze -Safeguarding Functional Narrative
DESIGN BCD -I/O Database (SPI) -Safeguarding Diagram
30-Jun
-Wiring Database(SPI)
1st Input
- Wiring Database (SPI)
1st Input
31-Mar - I/O Database(SPI) HOLD:
Alarm Work Shop: Sep-17
Study HART INFO(Package Equip) to MAC
27-Jan-2017 -Tie-in (Hard/Soft Design, Schedule) CHAZOP (Company)
-Cause & Effect End Date of FAT Advanced Solution Package, to be discussed with MAC
ICSS MAC PO
NOTE:
This is aligned ICSS schedule with MAC