You are on page 1of 120

Conctractor :

Consultant : LAPORAN HARIAN

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI / TANGGAL : Senin,08 April 2019

I URAIAN KEGIATAN SAT VOL KETE


Pemancangan spun pile Ø600 stock pile bridge area Pier pont Final
1 Point 5 Finish, Final set
sheet 2nd, 54C,54E,54G, new final shet 53E,53G

2 Joint splacing ke 1 spun pile Ø600 stock pile bridge 53C,53I Point 2 On Progress

3 Cutting Spun pile area Fuel Tank 2000 KL Point 6 On Progress

4 Repair hammer DD5.6 Team 2 Unit 1 On Progress

II TENAGA UTAMA PERALATAN MAT


No. Posisi Jumlah No. Jenis Peralatan Quantity No. Material
A Staff / Karyawan A Peralatan Ringan Vol. Sat. A Material Alam
1 Project Manager 1 1 Webing sling 2 pcs
2 Site Manager 1 2 Segel 18 Ton
3 Site Engineering 2 3 Ladder 1 Unit
4 Project Control 1 4 Hammer 5,6T 1 Unit
5 HRD site 1 5 Trafo Las 4 Unit
6 Supervisor 2 6 Cutting tos 1 Set
7 HSE 2 7 Genset 250 1 Set
8 QA/QC 1 8 Hammer 4,5T 1 Unit
9 Logistick 3
10 Surveyor 2
B Tenaga Kerja B Peralatan Berat B Material Pabrikan b
1 Ass Surveyor 1 1 Crane 45 T 1 Unit 1 Spun pile Ø 600;L1
2 Formen 3 2 Crane 50 T 1 Unit
3 Formen Tukang 2 3 Crane 55 T 1 Unit
4 Fitter 1 5 Mobil Trailer 1 Unit
5 Welder 6 6 Exavator PC 200 1 Unit
6 Tukang 2
7 Operator crane 3
8 Rigger 1
9 Fitter 1
10 Semi skill 4
11 Driver Trailler 1
12 Operator exavator 1
13 Driver ELF dan LV 2
14 Helper 7
15 House Keeping/Office girls 3
III Rencana Kerja Selasa,09-04-2019 Kond

1 Pemancangan bottom spun pile Ø600 stock pile bridge area Pier 44C,44E,44G,44I
01.00
2 Perbaikan hammer 02.00
3 Cutiing Spun pile area Fuel Tank 03.00
04.00
05.00
06.00
07.00
08.00
09.00
10.00
11.00
12.00
13.00
Working Time

PT. BANGUN ARTA HUTAMA

Hendrisman Andreas Bambang Suryo Frans


Project Control Site Manager Projec
Project Owner :

LAPORAN HARIAN

CONST/AGREEMENT/1/2019
E SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
NDLING ONSHORE STOCK PILE BRIDGE
AN PT GAM-SEMPAYAU
April 2019

KETERANGAN

Finish, Final set

On Progress

On Progress

On Progress

MATERIAL
Material Quantity
Material Alam Vol. Sat.

Material Pabrikan by (GAM)


Spun pile Ø 600;L12m 5 Batang

Kondisi Cuaca

13.00
14.00 Cerah
15.00
16.00 Hujan
17.00
18.00 Gerimis
19.00
20.00 Mendung
21.00
22.00
23.00
24.00
01.00
Working Time 07.00-21.00

Frans Mangatur
Project Manager
Conctractor :

DAFTAR ABSENSI KESELURUHAN


Consultant : PT. BANGUN ARTA HUTAMA

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI / TANGGAL : Senin,08 April 2019
NO NAME POSITION ABSENCE
OFFICE
1 Frans Mangatur Project Manager 1
2 Bambang Suryo Site Manager 1
3 Hendrisman Project Control 1
4 Rajama Sahala Site HRD 1
5 Yuliadi Site Engineering 1
6 Urip Site Engineering 1
7 Tri Agus R Supervisor 1
8 Gihon Pane Supervisor 1
9 Eric R QAQC 1
10 Boy S Logistic 1
11 Nataniel Manalu Logistic 1
12 M Indra Surveyor 1
13 Yayan Mulyana Surveyor 1
14 Dwi Bagus Setiawan Admin Finance 1
15 Dwi Beniawan Alpan HSE Officer 1
16 Wisnu Catur rangga HSE Officer 1
JUMLAH 16
SITE
1 Sudirman Fitter 1
2 Suroso Fitter 1
3 Saeful Bakri Fitter 1
4 Agus Budi Fitter 1
5 Madropiu Formen 1
6 Hariolang Formen 1
7 Mugiono Formen Tukang 1
8 Suratman Forman Tukang 1
9 M. Hardi Ass Surveyor 1
10 Sahroni Welder 1
11 Setiyono Welder 1
12 Ayib Sarifuddin Welder 1
13 Agus Rahayu C Welder 1
14 Sukirman Welder 1
15 Gunawan Suroso Welder 1
16 Didi Suwandi Welder 1
17 Soedjanitya Tukang 1
18 Supardi Tukang 1
19 Saiful Operator Crane 45 T 1
20 Selamet Widodo Rigger 1
21 Saptanto A.N Semi Skill 1
22 Bario Semi Skill 1
23 Nurul Fahmi Semi Skill 1
24 Iwan Kurniawan Semi Skill 1
25 Sutrisno Welder 1
26 Ahmad Pambudi Welder 1
27 Agus Tikno Welder 1
28 Surya mualim Fitter 1
29 Bacturahman Semi Fitter 1
JUMLAH 29
TOTAL 45

PT. BANGUN ARTA HUTAMA

Hendrisman Andreas Bambang Suryo


Project Control Site Manager
Hendrisman Andreas
Project Control

Conctractor :

DAFTAR ABSENSI KESELURUHAN


Consultant : PT. BANGUN ARTA HUTAMA

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI / TANGGAL : Senin,08 April 2019

NO NAME POSITION ABSENCE


SITE
1 Jery Operator Crane 50 T 1
2 Eko Budi Arno Operator Crane 55 T 1
3 Mursida Ass Operator crane 1
4 Yusfa Muhtar Ass Operator crane 1
5 Nanang Driver Trailler 1
6 Wawan Setiawan Operator exavator 1
7 Dede Yusuf Electrical 1
8 Amri Manurung Driver ELF 1
9 Adi Setyo Nugroho Driver LV 1
10 Rohmat Hadi Helper tukang 1
11 Adi saputra Helper ME 1
12 Muliading Helper ME 1
13 Much. Abdienakasta Helper Pancang 1
14 Daviansyah House Keeping 1
15 Teguh Santoso House Keeping 1
16 Defri Helper ME 1
17 Reni Suherlina Office Girls 1
18 Hamzah Helper Pancang 1
JUMLAH 18
GRAND TOTAL 63

PT. BANGUN ARTA HUTAMA

Hendrisman Andreas Bambang Suryo


Project Control Site Manager
Project Owner :

TAR ABSENSI KESELURUHAN


T. BANGUN ARTA HUTAMA

ORT COAL TERMINAL (SPCT) PROJECT

WORKING TIME REMARKS


OFFICE
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
160
SITE
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
290
450

BANGUN ARTA HUTAMA

Bambang Suryo Frans Mangatur


Site Manager Project Manager
Project Owner :

TAR ABSENSI KESELURUHAN


T. BANGUN ARTA HUTAMA

ORT COAL TERMINAL (SPCT) PROJECT

WORKING TIME REMARKS


SITE
10
10
10
10
10
10
10
10 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
160

610

BANGUN ARTA HUTAMA

Bambang Suryo Frans Mangatur


Site Manager Project Manager
Conctractor : Project Owner :

Consultant : DOKUMENTASI

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI/TANGGAL : Senin,08 April 2019

Piling area Pier pont Final sheet 2nd, 54C,54E,54G,


new final shet 53E,53G Perbaikan hammer DD 5.6

Perbaikan hammer DD 5.6 Cutting Spun Pile Area Fuel Tank

Joint Spun Pile Area Pier Joint Spun Pile Area Pier
LAY OUT PEMANCANGAN SPUN PILE ø 600, L 12M & 9M AREA STOC
08 APRIL 2019

Mess Bukit

Desa Sempayau

A
B P26 P27 P28
C
D
E
F
G
H
I
J
K

52 53 54 55 56 57 58 59
E
F
G
H
I
J
K

52 53 54 55 56 57 58 59

ON PROGRESS

PILING FINISHED

FINAL SET
UN PILE ø 600, L 12M & 9M AREA STOCK PILE BRIDGE
08 APRIL 2019

Abutment 2
P29

4 55 56 57 58 59 60 61 62
4 55 56 57 58 59 60 61 62
LAY OUT PEMANCANGAN SPUN PILE ø 600, L 12M & 9M AREA STOC
08 APRIL 2019

Mess Bukit

Desa Sempayau

A P20 P21 P22 P23


B
C
D
E
F
G
H
I
J
K

40 41 42 43 44 45 46 47 48 49
D
E
F
G
H
I
J
K

40 41 42 43 44 45 46 47 48 49

ON PROGRESS

PILING FINISHED
UN PILE ø 600, L 12M & 9M AREA STOCK PILE BRIDGE
08 APRIL 2019

P24 P25

2 43 44 45 46 47 48 49 50 51
2 43 44 45 46 47 48 49 50 51
LAY OUT PEMANCANGAN SPUN PILE ø 600, L 12M & 9M AREA STOC
08 APRIL 2019

Mess Bukit

Desa Sempayau

A Abutment 2 P01 P02 P03


B
C
D
E
F
G
H
I
J
K

1 2 3 3' 3" 4 5 6 7
F
G
H
I
J
K

1 2 3 3' 3" 4 5 6 7

ON PROGRESS

PILING FINISHED

FINAL SET
UN PILE ø 600, L 12M & 9M AREA STOCK PILE BRIDGE
08 APRIL 2019

P03 P04 P05

4 5 6 7 8 9 10 11
4 5 6 7 8 9 10 11
Conctractor :

Consultant : LAPORAN HARIAN

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI / TANGGAL : Rabu,10 April 2019

I URAIAN KEGIATAN SAT VOL KETE


Pemancangan spun pile Ø600 stock pile bridge area Pier pont Final
1 Point 6 Finish, Final set
sheet 53I, 52E, 52G, 52I, 51G & 51D

2 Joint splacing ke 1 spun pile Ø600 stock pile bridge 52E,52G,52I,50C Point 3 On Progress

Piling Bottom Pier 41C, 40i, 40G, 40E, 40C, 39i, 39C, 39E, 39C, 38i,
3 Point 24 On Progress
38G, 38E, 38C, 37i, 37G, 37E, 37C, 36i, 36G, 36E, 36C, 35i, 35G, 35E

4 Cutting Spun pile area Fuel Tank 2000 KL Point 31 On Progress

II TENAGA UTAMA PERALATAN MAT


No. Posisi Jumlah No. Jenis Peralatan Quantity No. Material
A Staff / Karyawan A Peralatan Ringan Vol. Sat. A Material Alam
1 Project Manager 1 1 Webing sling 2 pcs
2 Site Manager 1 2 Segel 18 Ton
3 Site Engineering 2 3 Ladder 1 Unit
4 Project Control 1 4 Hammer 5,6T 1 Unit
5 HRD site 1 5 Trafo Las 4 Unit
6 Supervisor 2 6 Cutting tos 1 Set
7 HSE 2 7 Genset 250 1 Set
8 QA/QC 1 8 Hammer 4,5T 1 Unit
9 Logistick 3
10 Surveyor 2
B Tenaga Kerja B Peralatan Berat B Material Pabrikan b
1 Ass Surveyor 1 1 Crane 45 T 1 Unit 1 Spun pile Ø 600;L1
2 Formen 3 2 Crane 50 T 1 Unit
3 Formen Tukang 2 3 Crane 55 T 1 Unit
4 Fitter 1 5 Mobil Trailer 1 Unit
5 Welder 6 6 Exavator PC 200 1 Unit
6 Tukang 2
7 Operator crane 3
8 Rigger 1
9 Fitter 1
10 Semi skill 4
11 Driver Trailler 1
12 Operator exavator 1
13 Driver ELF dan LV 2
14 Helper 7
15 House Keeping/Office girls 3
III Rencana Kerja Kamis,12-04-2019 Kond

1 Pemancangan bottom spun pile Ø600 stock pile bridge area Pier 19 s.d Pier 18
01.00
2 Join Spun Pile 02.00
3 Final Sheet 3 Poin 03.00
4 Cutting Spun Pile area Fuel Tank & Lean Concrete Applicated 04.00
05.00
06.00
07.00
08.00
09.00
10.00
11.00
12.00
13.00
Working Time

PT. BANGUN ARTA HUTAMA

Erikson Herman P S Bambang Suryo Frans


Document Control Site Manager Projec
Project Owner :

LAPORAN HARIAN

CONST/AGREEMENT/1/2019
E SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
NDLING ONSHORE STOCK PILE BRIDGE
AN PT GAM-SEMPAYAU
pril 2019

KETERANGAN

Finish, Final set

On Progress

On Progress

On Progress

MATERIAL
Material Quantity
Material Alam Vol. Sat.

Material Pabrikan by (GAM)


Spun pile Ø 600;L12m 22 Batang

Kondisi Cuaca

13.00
14.00 Cerah
15.00
16.00 Hujan
17.00
18.00 Gerimis
19.00
20.00 Mendung
21.00
22.00
23.00
24.00
01.00
Working Time 07.00-21.00

Frans Mangatur
Project Manager
Conctractor :

DAFTAR ABSENSI KESELURUHAN


Consultant : PT. BANGUN ARTA HUTAMA

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI / TANGGAL : Rabu,10 April 2019
NO NAME POSITION ABSENCE
OFFICE
1 Frans Mangatur Project Manager 1
2 Bambang Suryo Site Manager 1
3 Hendrisman Project Control 1
4 Rajama Sahala Site HRD 1
5 Yuliadi Site Engineering 1
6 Urip Site Engineering 1
7 Erikson Herman Site Engineering 1
8 Tri Agus R Supervisor 1
9 Galang Jati Perkasa QC 1
12 Nataniel Manalu Logistic 1
13 M Indra Surveyor 1
13 Yayan Mulyana Surveyor 1
15 Erdi Mardianto Logistic 1
16 Dwi Beniawan Alpan HSE Officer 1
JUMLAH 14
SITE
1 Sudirman Fitter 1
2 Suroso Fitter 1
3 Saeful Bakri Fitter 1
4 Surya mualim Fitter 1
5 Agus Budi Fitter 1
6 Madropi Foreman 1
7 Hari Yolan Foreman 1
8 Suratman Foreman 1
9 Mugiono Carpenter Foreman 1
10 M. Hardi Ass. Surveyor 1
11 Egi Triana Ass. Surveyor 1
12 Sahroni Welder 1
13 Setiyono Welder 1
14 Ayib Sarifuddin Welder 1
15 Agus Rahayu C Welder 1
16 Sukirman Welder 1
17 Gunawan Suroso Welder 1
18 Dudi Suwandi Welder 1
19 Sutrisno Welder 1
20 Ahmad Pambudi Welder 1
21 Agus Tikno Welder 1
22 Suprapdi Welder 1
23 Soedjanitya Carpenter 1
24 Suprapdi Carpenter 1
25 Saifullah Operator Crane 45 T 1
26 Slamet Widodo Rigger 1
27 Saptanto A.N Semi Skill 1
28 Dede Yusuf Elektrikal 1
29 Bario Semi Skill 1
30 Nurul Fahmi Semi Skill 1
31 Iwan Kurniawan Semi Skill 1
32 Baeturahman Semi Fitter 1
JUMLAH 32
TOTAL 46

PT. BANGUN ARTA HUTAMA

Bambang Suryo
Site Manager

Erikson Herman P S
Document Control

Conctractor :
Conctractor :

DAFTAR ABSENSI KESELURUHAN


Consultant : PT. BANGUN ARTA HUTAMA

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI / TANGGAL : Rabu,10 April 2019

NO NAME POSITION ABSENCE


SITE
1 Jery Operator Crane 50 T 1
2 Eko Budi Arno Operator Crane 55 T 1
3 Mursida Rigger 1
4 Yusfa Muhtar Ass Operator crane 1
5 Nanang Driver Trailler 1
6 Wawan Setiawan Operator exavator 1
7 Dede Yusuf Electrical 1
8 Amri Manurung Driver ELF 1
9 Adi Setyo Nugroho Driver LV 1
10 Rohmat Hadi Helper tukang 1
11 Hadi saputra Helper ME 1
12 Mulyadin Helper ME 1
13 Much. Abdinerasta Helper Pancang 1
14 Daviansyah House Keeping 1
15 Teguh Santoso House Keeping 1
16 Defri Helper ME 1
17 Reni Suherlina Office Girls 1
18 Hamzah Helper Pancang 1

JUMLAH 18
GRAND TOTAL 64

PT. BANGUN ARTA HUTAMA

Erikson Herman P S Bambang Suryo


Document Control Site Manager
Project Owner :

TAR ABSENSI KESELURUHAN


T. BANGUN ARTA HUTAMA

ORT COAL TERMINAL (SPCT) PROJECT

WORKING TIME REMARKS


OFFICE
10
10
10
10
10
10
10
10
10
10
10
10
10
10
140
SITE
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
320
460

BANGUN ARTA HUTAMA

Bambang Suryo
Site Manager

Frans Mangatur
Project Manager
Project Owner :

TAR ABSENSI KESELURUHAN


T. BANGUN ARTA HUTAMA

ORT COAL TERMINAL (SPCT) PROJECT

WORKING TIME REMARKS


SITE
10
10
10
10
10
10
10
10 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal

160
620

BANGUN ARTA HUTAMA

Bambang Suryo Frans Mangatur


Site Manager Project Manager
Conctractor : Project Owner :

Consultant : DOKUMENTASI

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI/TANGGAL : Rabu,10 April 2019

Piling area Pier pont Final sheet 3 Point Piling area Pier pont Bottom 19 Point

Piling area Pier pont Bottom 19 Point


fuel tank Pile area Pier

Cutting Area Fuel Tank Cutting Area Fuel Tank


LAY OUT PEMANCANGAN SPUN PILE ø 600, L 12M & 9M AREA STOC
10 APRIL 2019

P26 P27 P28


ON PROGRESS

PILING FINISHED

FINAL SET
UN PILE ø 600, L 12M & 9M AREA STOCK PILE BRIDGE
10 APRIL 2019

Abutment 2
P29
LAY OUT PEMANCANGAN SPUN PILE ø 600, L 12M & 9M AREA STOC
10 APRIL 2019

Mess Bukit

Desa Sempayau

A P20 P21 P22 P23


B
C
D
E
F
G
H
I
J
K
32 33 34 35 36 37 38 39

ON PROGRESS

PILING FINISHED
UN PILE ø 600, L 12M & 9M AREA STOCK PILE BRIDGE
10 APRIL 2019

P24 P25
40 41 42 43
LAY OUT PEMANCANGAN SPUN PILE ø 600, L 12M & 9M AREA STOC
10 APRIL 2019

Mess Bukit

Desa Sempayau

A Abutment 2 P01 P02 P03


B
C
D
E
F
G
H
I
J
K

1 2 3 3' 3" 4 5 6 7
F
G
H
I
J
K

1 2 3 3' 3" 4 5 6 7

ON PROGRESS

PILING FINISHED

FINAL SET
UN PILE ø 600, L 12M & 9M AREA STOCK PILE BRIDGE
10 APRIL 2019

P03 P04 P05

4 5 6 7 8 9 10 11
4 5 6 7 8 9 10 11
Conctractor :

Consultant : LAPORAN HARIAN

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI / TANGGAL : Kamis,11 April 2019

I URAIAN KEGIATAN SAT VOL KETERAN


Pemancangan spun pile Ø600 stock pile bridge area Pier pont Final
1 Point 6 Finish, Final set
sheet 51H, 51B, 50J, 50H, 50D, 50B
Joint splacing ke 1 spun pile Ø600 stock pile bridge 50B,50D,50F, 50H,
2 Point 6 On Progress
50J, 51B
3 Piling Bottom Pier 35C, 34i, 34G, 34E, 34C, 33J, 33H, 33F, 33D Point 9 On Progress

4 Lean concrete application On Progress

II TENAGA UTAMA PERALATAN MATER


No. Posisi Jumlah No. Jenis Peralatan Quantity No. Material
A Staff / Karyawan A Peralatan Ringan Vol. Sat. A Material Alam
1 Project Manager 1 1 Webing sling 2 pcs
2 Site Manager 1 2 Segel 18 Ton
3 Site Engineering 2 3 Ladder 1 Unit
4 Project Control 1 4 Hammer 5,6T 1 Unit
5 HRD site 1 5 Trafo Las 4 Unit
6 Supervisor 2 6 Cutting tos 1 Set
7 HSE 2 7 Genset 250 1 Set
8 QA/QC 1 8 Hammer 4,5T 1 Unit
9 Logistick 3
10 Surveyor 2

B Tenaga Kerja B Peralatan Berat B Material Pabrikan by (


1 Ass Surveyor 1 1 Crane 45 T 1 Unit 1 Spun pile Ø 600;L12m
2 Formen 3 2 Crane 50 T 1 Unit
3 Formen Tukang 2 3 Crane 55 T 1 Unit
4 Fitter 1 5 Mobil Trailer 1 Unit
5 Welder 6 6 Exavator PC 200 1 Unit
6 Tukang 2
7 Operator crane 3
8 Rigger 1
9 Fitter 1
10 Semi skill 4
11 Driver Trailler 1
12 Operator exavator 1
13 Driver ELF dan LV 2
14 Helper 7
15 House Keeping/Office girls 3
III Rencana Kerja Jumat,12-04-2019 Kondisi C
1 Pemancangan bottom spun pile Ø600 stock pile bridge area Pier 18 s.d Pier 16 01.00
2 Join Spun Pile 02.00
3 Final Sheet 3 Poin 03.00
4 Leean Concrete application 04.00
05.00
06.00
07.00
08.00
09.00
10.00
11.00
12.00
13.00
Working Time

PT. BANGUN ARTA HUTAMA

Erikson Herman P S Bambang Suryo Frans M


Document Control Site Manager Project M
Project Owner :

AL (SPCT) PROJECT
RIDGE

KETERANGAN

Finish, Final set

On Progress

On Progress

On Progress

MATERIAL
Material Quantity
Material Alam Vol. Sat.

Material Pabrikan by (GAM)


Spun pile Ø 600;L12m 22 Batang

Kondisi Cuaca
13.00
14.00 Cerah
15.00
16.00 Hujan
17.00
18.00 Gerimis
19.00
20.00 Mendung
21.00
22.00
23.00
24.00
01.00
orking Time 07.00-21.00

Frans Mangatur
Project Manager
Conctractor :

DAFTAR ABSENSI KESELURUHAN


Consultant : PT. BANGUN ARTA HUTAMA

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI / TANGGAL : Kamis,11 April 2019
NO NAME POSITION ABSENCE
OFFICE
1 Frans Mangatur Project Manager 1
2 Bambang Suryo Site Manager 1
3 Hendrisman Project Control 1
4 Rajama Sahala Site HRD 1
5 Yuliadi Site Engineering 1
6 Urip Site Engineering 1
7 Erikson Herman Site Engineering 1
8 Tri Agus R Supervisor 1
9 Galang Jati Perkasa QC 1
12 Nataniel Manalu Logistic 1
13 M Indra Surveyor 1
13 Yayan Mulyana Surveyor 1
15 Erdi Mardianto Logistic 1
16 Dwi Beniawan Alpan HSE Officer 1
JUMLAH 14
SITE
1 Sudirman Fitter 1
2 Suroso Fitter 1
3 Saeful Bakri Fitter 1
4 Surya mualim Fitter 1
5 Agus Budi Fitter 1
6 Madropi Foreman 1
7 Hari Yolan Foreman 1
8 Suratman Foreman 1
9 Mugiono Carpenter Foreman 1
10 M. Hardi Ass. Surveyor 1
11 Egi Triana Ass. Surveyor 1
12 Sahroni Welder 1
13 Setiyono Welder 1
14 Ayib Sarifuddin Welder 1
15 Agus Rahayu C Welder 1
16 Sukirman Welder 1
17 Gunawan Suroso Welder 1
18 Dudi Suwandi Welder 1
19 Sutrisno Welder 1
20 Ahmad Pambudi Welder 1
21 Agus Tikno Welder 1
22 Suprapdi Welder 1
23 Soedjanitya Carpenter 1
24 Suprapdi Carpenter 1
25 Saifullah Operator Crane 45 T 1
26 Slamet Widodo Rigger 1
27 Saptanto A.N Semi Skill 1
28 Dede Yusuf Elektrikal 1
29 Bario Semi Skill 1
30 Nurul Fahmi Semi Skill 1
31 Iwan Kurniawan Semi Skill 1
32 Baeturahman Semi Fitter 1
JUMLAH 32
TOTAL 46

PT. BANGUN ARTA HUTAMA

Erikson Herman P S Bambang Suryo Fran


Document Control Site Manager Proj

Conctractor :

DAFTAR ABSENSI KESELURUHAN


Consultant : PT. BANGUN ARTA HUTAMA
DAFTAR ABSENSI KESELURUHAN
PT. BANGUN ARTA HUTAMA

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI / TANGGAL : Kamis,11 April 2019

NO NAME POSITION ABSENCE


SITE
1 Jery Operator Crane 50 T 1
2 Eko Budi Arno Operator Crane 55 T 1
3 Mursida Rigger 1
4 Yusfa Muhtar Ass Operator crane 1
5 Nanang Driver Trailler 1
6 Wawan Setiawan Operator exavator 1
7 Dede Yusuf Electrical 1
8 Amri Manurung Driver ELF 1
9 Adi Setyo Nugroho Driver LV 1
10 Rohmat Hadi Helper tukang 1
11 Hadi saputra Helper ME 1
12 Mulyadin Helper ME 1
13 Much. Abdinerasta Helper Pancang 1
14 Daviansyah House Keeping 1
15 Teguh Santoso House Keeping 1
16 Defri Helper ME 1
17 Reni Suherlina Office Girls 1
18 Hamzah Helper Pancang 1

JUMLAH 18
GRAND TOTAL 64

PT. BANGUN ARTA HUTAMA

Hendrisman Andreas Bambang Suryo Fran


Project Control Site Manager Proj
Project Owner :

LURUHAN
UTAMA

PCT) PROJECT

WORKING TIME REMARKS

10
10
10
10
10
10
10
10
10
10
10
10
10
10
140

10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
320
460

UTAMA

o Frans Mangatur
Project Manager

Project Owner :

LURUHAN
UTAMA
PCT) PROJECT

WORKING TIME REMARKS

10
10
10
10
10
10
10
10 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal

160
620

UTAMA

o Frans Mangatur
Project Manager
Conctractor :

Consultant : DOKUMENTASI

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI/TANGGAL : Kamis,11 April 2019

Piling area Pier pont Final sheet 3 Point Piling area Pier pont Bottom 19 Point
Piling area Pier pont Bottom 19 Point
fuel tank Pile area Pier

Lean concrete Area Fuel Tank Lean concrete Area Fuel Tank
Project Owner :

pont Bottom 19 Point


Pile area Pier

ncrete Area Fuel Tank


LAY OUT PEMANCANGAN SPUN PILE ø 600, L 12M & 9M AREA STOCK PIL
10 APRIL 2019

P26 P27 P28


ON PROGRESS

PILING FINISHED

FINAL SET
M & 9M AREA STOCK PILE BRIDGE

Abutment 2
P29
LAY OUT PEMANCANGAN SPUN PILE ø 600, L 12M & 9M AREA STOCK PILE B
10 APRIL 2019

Mess Bukit

Desa Sempayau

A P20 P21 P22 P23


B
C
D
E
F
G
H
I
J
K

32 33 34 35 36 37 38 39 40 41
32 33 34 35 36 37 38 39 40 41

ON PROGRESS

PILING FINISHED
9M AREA STOCK PILE BRIDGE

P24 P25

41 42 43
41 42 43
LAY OUT PEMANCANGAN SPUN PILE ø 600, L 12M & 9M AREA STOCK PIL
10 APRIL 2019

Mess Bukit

Desa Sempayau

A Abutment 2 P01 P02 P03


B
C
D
E
F
G
H
I
J
K

1 2 3 3' 3" 4 5 6 7 8
1 2 3 3' 3" 4 5 6 7 8

ON PROGRESS

PILING FINISHED

FINAL SET
M & 9M AREA STOCK PILE BRIDGE

P03 P04 P05

6 7 8 9 10 11
6 7 8 9 10 11
Conctractor :

Consultant : LAPORAN HARIAN

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI / TANGGAL : Jumat, 12 April 2019

I URAIAN KEGIATAN SAT VOL KETERAN


Pemancangan spun pile Ø600 stock pile bridge area Pier pont Final
1 Point 6 Finish, Final set
sheet 51H, 51B, 50J, 50H, 50D, 50B
Joint splacing ke 1 spun pile Ø600 stock pile bridge 50B,50D,50F, 50H,
2 Point 6 On Progress
50J, 51B
3 Piling Bottom Pier 35C, 34i, 34G, 34E, 34C, 33J, 33H, 33F, 33D Point 9 On Progress
4 Lean concrete application On Progress

5 Joining steel pipe Ø1016, Ø609,6, Ø812,8 Point 2 On Progress


II TENAGA UTAMA PERALATAN MATER
No. Posisi Jumlah No. Jenis Peralatan Quantity No. Material
A Staff / Karyawan A Peralatan Ringan Vol. Sat. A Material Alam
1 Project Manager 1 1 Webing sling 2 pcs
2 Site Manager 1 2 Segel 18 Ton
3 Site Engineering 2 3 Ladder 1 Unit
4 Project Control 1 4 Hammer 5,6T 1 Unit
5 HRD site 1 5 Trafo Las 4 Unit
6 Supervisor 2 6 Cutting tos 1 Set
7 HSE 2 7 Genset 250 1 Set
8 QA/QC 1 8 Hammer 4,5T 1 Unit
9 Logistick 3
10 Surveyor 2

B Tenaga Kerja B Peralatan Berat B Material Pabrikan by (


1 Ass Surveyor 1 1 Crane 45 T 1 Unit 1 Spun pile Ø 600;L12m
2 Formen 3 2 Crane 50 T 1 Unit
3 Formen Tukang 2 3 Crane 55 T 1 Unit
4 Fitter 1 5 Mobil Trailer 1 Unit
5 Welder 6 6 Exavator PC 200 1 Unit
6 Tukang 2
7 Operator crane 3
8 Rigger 1
9 Fitter 1
10 Semi skill 4
11 Driver Trailler 1
12 Operator exavator 1
13 Driver ELF dan LV 2
14 Helper 7
15 House Keeping/Office girls 3
III Rencana Kerja Jumat,12-04-2019 Kondisi C
1 Pemancangan bottom spun pile Ø600 stock pile bridge area Pier 18 s.d Pier 16 01.00
2 Join Spun Pile 02.00
3 Final Sheet 3 Poin 03.00
4 Lean Concrete application 04.00
5 Joining steel pipe Ø1016, Ø609,6, Ø812,8 05.00
06.00
07.00
08.00
09.00
10.00
11.00
12.00
13.00
Working Time

PT. BANGUN ARTA HUTAMA

Erikson Herman P S Bambang Suryo Frans M


Document Control Site Manager Project M
Project Owner :

AL (SPCT) PROJECT
RIDGE

KETERANGAN
Finish, Final set
On Progress

On Progress
On Progress

On Progress
MATERIAL
Material Quantity
Material Alam Vol. Sat.

Material Pabrikan by (GAM)


Spun pile Ø 600;L12m 22 Batang

Kondisi Cuaca
13.00
14.00 Cerah
15.00
16.00 Hujan
17.00
18.00 Gerimis
19.00
20.00 Mendung
21.00
22.00
23.00
24.00
01.00
orking Time 07.00-21.00

Frans Mangatur
Project Manager
Conctractor :

DAFTAR ABSENSI KESELURUHAN


Consultant : PT. BANGUN ARTA HUTAMA

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI / TANGGAL : Jumat, 12 April 2019
NO NAME POSITION ABSENCE
OFFICE
1 Frans Mangatur Project Manager 1
2 Bambang Suryo Site Manager 1
3 Hendrisman Project Control 1
4 Rajama Sahala Site HRD 1
5 Yuliadi Site Engineering 1
6 Urip Site Engineering 1
7 Erikson Herman Site Engineering 1
8 Tri Agus R Supervisor 1
9 Galang Jati Perkasa QC 1
12 Nataniel Manalu Logistic 1
13 M Indra Surveyor 1
13 Yayan Mulyana Surveyor 1
15 Erdi Mardianto Logistic 1
16 Dwi Beniawan Alpan HSE Officer 1
JUMLAH 14
SITE
1 Sudirman Fitter 1
2 Suroso Fitter 1
3 Saeful Bakri Fitter 1
4 Surya mualim Fitter 1
5 Agus Budi Fitter 1
6 Madropi Foreman 1
7 Hari Yolan Foreman 1
8 Suratman Foreman 1
9 Mugiono Carpenter Foreman 1
10 M. Hardi Ass. Surveyor 1
11 Egi Triana Ass. Surveyor 1
12 Sahroni Welder 1
13 Setiyono Welder 1
14 Ayib Sarifuddin Welder 1
15 Agus Rahayu C Welder 1
16 Sukirman Welder 1
17 Gunawan Suroso Welder 1
18 Dudi Suwandi Welder 1
19 Sutrisno Welder 1
20 Ahmad Pambudi Welder 1
21 Agus Tikno Welder 1
22 Suprapdi Welder 1
23 Soedjanitya Carpenter 1
24 Suprapdi Carpenter 1
25 Saifullah Operator Crane 45 T 1
26 Slamet Widodo Rigger 1
27 Saptanto A.N Semi Skill 1
28 Dede Yusuf Elektrikal 1
29 Bario Semi Skill 1
30 Nurul Fahmi Semi Skill 1
31 Iwan Kurniawan Semi Skill 1
32 Baeturahman Semi Fitter 1
JUMLAH 32
TOTAL 46

PT. BANGUN ARTA HUTAMA

Erikson Herman P S Bambang Suryo Fran


Document Control Site Manager Proj

Conctractor :

DAFTAR ABSENSI KESELURUHAN


Consultant : PT. BANGUN ARTA HUTAMA
DAFTAR ABSENSI KESELURUHAN
PT. BANGUN ARTA HUTAMA

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI / TANGGAL : Jumat, 12 April 2019

NO NAME POSITION ABSENCE


SITE
1 Jery Operator Crane 50 T 1
2 Eko Budi Arno Operator Crane 55 T 1
3 Mursida Rigger 1
4 Yusfa Muhtar Ass Operator crane 1
5 Nanang Driver Trailler 1
6 Wawan Setiawan Operator exavator 1
7 Dede Yusuf Electrical 1
8 Amri Manurung Driver ELF 1
9 Adi Setyo Nugroho Driver LV 1
10 Rohmat Hadi Helper tukang 1
11 Hadi saputra Helper ME 1
12 Mulyadin Helper ME 1
13 Much. Abdinerasta Helper Pancang 1
14 Daviansyah House Keeping 1
15 Teguh Santoso House Keeping 1
16 Defri Helper ME 1
17 Reni Suherlina Office Girls 1
18 Hamzah Helper Pancang 1

JUMLAH 18
GRAND TOTAL 64

PT. BANGUN ARTA HUTAMA

Erikson Herman P S Bambang Suryo Fran


Document Control Site Manager Proj
Project Owner :

LURUHAN
UTAMA

PCT) PROJECT

WORKING TIME REMARKS

10
10
10
10
10
10
10
10
10
10
10
10
10
10
140

10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
320
460

UTAMA

o Frans Mangatur
Project Manager

Project Owner :

LURUHAN
UTAMA
PCT) PROJECT

WORKING TIME REMARKS

10
10
10
10
10
10
10
10 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal
8 Lokal

160
620

UTAMA

o Frans Mangatur
Project Manager
Conctractor :

Consultant : DOKUMENTASI

NOMOR KONTRAK : 01/GAM-CONST/AGREEMENT/1/2019


NAMA PROYEK : 2ND STAGE SEMPAYAU PORT COAL TERMINAL (SPCT) PROJECT
PEKERJAAN : COAL HANDLING ONSHORE STOCK PILE BRIDGE
LOKASI : PELABUHAN PT GAM-SEMPAYAU
HARI/TANGGAL : Kamis,11 April 2019

Piling area Pier pont Final sheet 3 Point Joining pile area Pier pont Bottom 19 Point
Joining steel pipe Ø1016, Ø609,6, Ø812,8
Joining steel pipe Ø1016, Ø609,6, Ø812,8

Lean concrete Area Fuel Tank Lean concrete Area Fuel Tank
Project Owner :

ier pont Bottom 19 Point


1016, Ø609,6, Ø812,8

ncrete Area Fuel Tank


LAY OUT PEMANCANGAN SPUN PILE ø 6
10 APRIL

P26 P27

ON PROGRESS

PILING FINISHED

FINAL SET
N SPUN PILE ø 600, L 12M & 9M AREA STOCK PILE BRIDGE
10 APRIL 2019

Abutment 2
P27 P28 P29
LAY OUT PEMANCANGAN SPUN PILE ø 600, L
10 APRIL 2019

Mess Bukit

Desa Sempayau

A P20 P21
B
C
D
E
F
G
H
I
J
K

32 33 34 35

ON PROGRESS

PILING FINISHED
UN PILE ø 600, L 12M & 9M AREA STOCK PILE BRIDGE
10 APRIL 2019

P21 P22 P23 P24 P25

35 36 37 38 39 40 41 42 43
LAY OUT PEMANCANGAN SPUN PILE ø 60
10 APRIL

Mess Bukit

Desa Sempayau

A Abutment 2 P01
B
C
D
E
F
G
H
I
J
K

1 2 3 3' 3" 4

ON PROGRESS

PILING FINISHED

FINAL SET
N SPUN PILE ø 600, L 12M & 9M AREA STOCK PILE BRIDGE
10 APRIL 2019

P02 P03 P04 P05

3" 4 5 6 7 8 9 10 11
P05

10 11

You might also like