Load Calculation Sheet for D.G. Set In High rise Building.

Tower 1 Tower 2 Tower 3 Tower 4 Tower 5 Tower


Fire Main Pump in HP 30 30 40 40 40
Jockey Pump in HP 10 10 10 10 10
Sump Pump in HP 15 15 25 25 25
Lift Per Block one Nos. 10 20 30 40 50
Total HP 65 75 105 115 125
Total Load In KW 48.425 55.875 78.225 85.675 93.125

Comman Parking & Stair Case


Light in KW Per Block 3 KW 3 6 9 12 15
Total in KW 51.425 61.875 87.225 97.675 108.125
Total IN KVA 64.28125 77.34375 109.03125 122.09375 135.15625
DG Set Capacity in KVA 82.50 82.50 125.00 160.00 160.00

Main Cable size Al Ar. 3.5 Core 120 Sqmm 120 Sqmm 150 Sqmm 150 Sqmm 150 Sqmm
Main MCCB Capacity 200 Amp 200 Amp 200Amp 250 Amp 250Amp
4.6 X 2.3 X 0.9 4.6 X 2.3 X 0.9 4.6 X 2.3 X 0.9 5.3 X 2.8 X 0.9 5.3 X 2.8 X 0.9 Mtr
Foundation Size Mtr (Depth) Mtr (Depth) Mtr (Depth) Mtr (Depth) (Depth)
DG SET [160 KVA]
Model no.KG160WS
PGVCL SUPPLY
Make :Kirloskar Green with canopy

3 1/2 * 150 sq. mm Al. 3 1/2 * 150 sq. mm


Conductor Al. Conductor
M
a 250 Amp. CHANGE OVER SWITCH
i 3 1/2 * 150 sq. mm Al.
n Conductor

P 250 Amp. FP MCCB


a
n
e 300 Amp. Panel mounting Busbar
l
i
n

P 63 Amp. FP 40 Amp. DP
u 63 Amp. FP MCCB 63 Amp. FP MCCB 63 Amp. FP MCCB 63 Amp. FP MCCB 63 Amp. FP MCCB 100 Amp. FP 63 Amp. FP 160 Amp. FP MCCB MCB
m SWITCH SWITCH SWITCH SWITCH SWITCH MCCB SWITCH MCCB SWITCH MCCB SWITCH SWITCH-2 SWITCH-2
p nos nos
R4 * 16.0 sq. mm 4 * 16.0 sq. mm armoured 4 * 16.0 sq. mm
oarmoured 4 * 16.0 sq. mm
armoured Aluminium copper Aluminium (2 pairs)
4 * 16.0 sq. mm armoured 4 * 16.0 sq. mm armoured
Aluminium cable (2 pairs)
4 * 35.0 sq. mm armoured
armoured
Aluminium cable (2 pairs) Aluminium cable 3.5*150.0 sq.
oAluminium
pairs)
cable (2
cable (2 pairs) Aluminium cable mm armoured
m Aluminium
cable

Tower -01 Tower -02 Tower -03 Tower -04 Tower -05

63 Amp.FP MCCB 63 Amp.FP MCCB 63 Amp.FP MCCB 63 Amp.FP MCCB 63 Amp.FP MCCB
Switch in Ele. Room Switch in Ele. Room Switch in Ele. Room Switch in Ele. Room Switch in Ele. Room
A
t

B
u 63 Amp. 32Amp
63 Amp. ICTP
32Amp
63 Amp. ICTP
32Amp
63 Amp. ICTP
32Amp
63 Amp. ICTP
32Amp
i ICTP (1 ICDP/
(1 Nos.)
ICDP/
(1 Nos.)
ICDP/
(1 Nos.)
ICDP/
(1 Nos.)
ICDP/
l Nos.) MCB MCB MCB MCB MCB
d
i
n 4 * 6.0 sq. mm 4 * 6.0 sq. mm
4 * 6.0 sq. mm 4 * 6.0 sq. mm 4 * 6.0 sq. mm
g armoured Copper armoured Copper
armoured Copper cable armoured Copper cable armoured Copper cable
cable cable
s
i Parking Parking
Parking Parking Parking
d &
&
&
& & Fire Hydrant
e Fire Lift
Comm
Fire Lift Comma Fire Lift
Comm
Fire Lift Comma Fire Lift Comman Pump panel (50
Sump Panel (15 45 KVAR
Spare Spare
an an HP) APFCR Panel
n Light n Light Light HP)
Light Light
suuply suuply suuply
suuply suuply
Measurment Of Cable
(D) 3 1/2 core 95
150 Sqmm 35 Sqmm Al 10 Sqmm Al Ar Sq. mm ( 50 Sq.
Sr. No Location 50mm Dwc Pipe Al Ar. Cable Ar Cable Cable mm 1/2 core
50mm
1 Energy Meter to C/o Switch 20
2 DG Set to C/o switch 20
3 C/o Switch to Panel 20
4 Panel To APFCR 20
5 Panel to Fire panel 30
6 Panel to Pump Panel 20
7 Panel To Tower-1 60X2=120.00 80X2=160
8 Panel To Tower-2 90X2=180.00 120X2=240
9 Panel To Tower-3 120X2=240 80X2=160
10 Panel To Tower-4 150X2=300 120X2=240
63Amp ICTP(ele rm) to Fire
12 lift (Machine rm)

63Amp ICTP(ele rm) to


13 General lift (Machine rm)
Section piller to ele.room
14 (B3) 2 pair 80 X 2 = 160
Section piller to ele.room
15 (B4) 2 pair 120 X 2 =240
Total 1200 80 30 820 400
Say Qty 1300 80 20 900 450