You are on page 1of 1

1 2 4 6

1 2 4 6
1 2 4 6 7.086
7.085 1.155
7.086

2 3
1 4 5
A
18.050 A
A

A S1
S1 S1
+ 700 S1

SB
BUILDING 2 + 940
SEPTIC TANK 2

8.000
B

8.000
B

8.000
B

BUILDING 1
8.550

S1
S1
S1
C
C
C

5
C

WALL
SQ.M.
ELECTRICAL PANEL
BORD

= 140
ACHED BUILDING 2 GROUND FLOOR PLAN BUILDING 2 2ND FLOOR PLAN BUILDING 2 2ND ROOF PLAN
BUILDING 1 FLOOR PLAN SCALE 1:100 M
SCALE 1:100 M SCALE 1:100 M
SCALE 1:100 M

D
B
A
10.100

D
B
A
7
10.100

2 3

7
1 4 5
18.050

BUILDING 3S1
S1
A

6
5

16.000
8.550

+ 900

16.000
S1
4

S1

+ 840
F
BAMBOO FENCE
C
3

4
S1

3
BUILDING 1 ROOF PLAN
SCALE 1:100 M

6
2

1.155
2.512

6
2
SEPTIC TANK 3
1

BUILDING 3 FLOOR PLAN BUILDING 3 ROOF PLAN


SCALE 1:100 M SCALE 1:100 M

Republic Act 9266


Drawings and specifications, duly signed, stamped or sealed PROJECT TITLE: APPROVED BY: SHEET CONTENTS: REVISIONS: DESIGNED BY: SHEET NO.
as instruments of service are the properties and documents
of the architect, whatever the object for which they are made
is executed or not. It shall be unlawful for any person,
AS BUILT BUILDING 1 CADD BY:

GROUND FLOOR , BUILDING 2


A
without the written consent of the Architect or author of said
documents to duplicate or to make copies of said documents
KESA HOTEL AS BUILT PLAN BORACAY ORIENTAL HOTEL INC. CHECKED BY:
ARCHITECT for use in the repetition of and for other projects or building,
whatever executed partly or in whole. BGY.CATANGNAN GENERAL LUNA, SIARGAO GROUND FLOOR, BUILDING 3
2
PTR No.: Presidential Decree No. 49 SURIGAO DEL NORTE OWNER
PRC No.:
IAPOA NO.:
"Protection of Intellectual Property" November 14, 1972. GROUND FLOOR, BUILDING 2 DATE STARTED:
Works of art, architecture, models and designs are

TIN NO.: Place:


creative works and considered as part of the intellectual
property of the author duly protected under PD 49.
2ND FLOOR DATE FINISHED:

GSPublisherVersion 0.8.100.100

You might also like