(c) Damp proof course 2.5 cm thick c.c. No. of Printed Pages : 04 Roll No. .......................

1:1.5:3
(d) Reinforced brick work.
G-144
Unit III B. Tech. EXAMINATION, May 2018
5. What are the benefits of doing Rate analysis (Seventh Semester)
in a construction project ? Explain the process
of doing Rate analysis of Highway works. 15 (B. Scheme) (Re-appear Only)

6. What are the components of a contract (CE)


document ? Briefly explain about different CE407B
stages of tendering for selection of contractor.
15 ESTIMATING AND COSTING

Unit IV Time : 3 Hours] [Maximum Marks : 75

7. What are the functions of Public Works Before answering the question-paper candidates
Department ? Classify Public Works should ensure that they have been supplied to correct
Department. Explain the process of and complete question-paper. No complaint, in this
administrative sanction for a project. 15 regard, will be entertained after the examination.

8. Why is it necessary to prepare DPR of a Note : Attempt Five questions in all, selecting at
Project ? What data is required to prepare a least one question from each Unit. Assume
DPR for a project ? 15 any data if necessary.

M-G-144 4 360 (2-43/3) M-G-144 P.T.O.


Unit I 2. The formation width of road is 6 m side slope
2 : 1 in banking and 1.5 : 1 in cutting.
1. Figure below shows a plan of a single room Calculate the quantity of earth work and
building 6 m × 5 m. Estimate the quantities estimate the cost @ Rs. 475 per cum for
banking and Rs. 550 per cum for cutting : 15
and cost of the following items using Long
Formation Natural Chainage
wall and Short wall method : 15
Level Strata Level
(a) Earthwork in excavation @ Rs. 7000 cum
211.00 209.00 0
(b) Concrete in foundation @ Rs. 6000 cum 210.00 208.50 30
(c) Brick work in foundation and plinth @ 209.00 207.60 60
Rs. 4000cum 208.00 210.00 90
(d) Brick work in superstructure @ Rs. 207.00 208.50 120
3000 cum.
Unit II

3. What are the different types of specifications


0.3m 0.3
used in buildings ? Explain the General
4.2 m specifications of all components of Second
PL class building. 15
6m 0.4
A A 0.3 0.4
5m G.L. 0.4 4. Write detailed specifications of the following
0.5 0.3
0.6 0.3 items : 15
Plan 0.7 0.3 (a) Wood work in doors and windows
D-1.2×2.1 0.2
Section A - A (b) Reinforced Cement concrete (1:2:4) in
column

M-G-144 2 (2-43/4) M-G-144 3 P.T.O.