Professional Documents
Culture Documents
Project Name
Address: Date:
Installation Co: Report by:
Outdoor model: Outdoor Qty:
Indoor Type: D type / H type Indoor Qty:
centralized control: Yes / No RESS: Yes / No
GENERAL NOTES
(1)Prepare piping and installation plan (diagram) Yes No
(2)Confirm centralized remote adress setting *option Yes No
OUTDOOR UNIT
(1)Check place of installation GL Roof flor
(2)Check maintenance space OK NG
GAS PIPING
(1)Check installation of Gas piping OK NG
(2)Confirm Pressure is between 1.0~2.5kpa Yes No Standard pressure 2.0KPa( Natural gas)