PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT

Appropriation Request (AR-DJT/RJP-03/1)


(Estimate based on revised construction drawing issued in …..)

Hussain Disty

Sr. Unit Rate Quantity as per Bid Revised Quantity as Per


Description Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-03/01

Qty Amount Qty Amount Qty Amount


1/1 Earthwork excavation in irrigation
channels, drains, etc. to designed
section, grades and profiles, excavated
material disposed off and dressed Quantity increased/decreased due
within 50 f. (15 m) lead in ordinary soil. ‰Cf 3000 981.216 2943648.000 1286.927 3860781.000 305.711 917,133.00 to change in existing levels

1/2 Borrowpit excavation undressed lead


‰Cf 3200 3519.020 11260864.000 3974.517 12718454.400 455.497 1,457,590.40 Quantity increased/decreased due
upto 1/4 Mile in ordinary soil to change in existing levels
1/3 Compaction of earthwork with power
road roller, including ploughing, mixing,
moistening earth to optimum moisture
content in layers, etc. complete: 90% ‰ Quantity increased/decreased due
600 1966.783 1180069.800 1963.124 1177874.400 (3.659) (2,195.40)
maximum modified AASHO dry density Cf to change in existing levels
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-03/1)
(Estimate based on revised construction drawing issued in …..)

Hussain Disty

Sr. Unit Rate Quantity as per Bid Revised Quantity as Per


Description Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-03/01

Qty Amount Qty Amount Qty Amount


1/4 Compaction of earthwork with power
road roller, including ploughing, mixing,
moistening earth to optimum moisture
content in layers, etc. complete: 85% ‰ Quantity increased/decreased due
500 1809.828 904914.000 2064.494 1032247.000 254.666 127,333.00
maximum modified AASHO dry density Cf to change in existing levels

1/5 Dressing & leveling of earthwork to ‰


(19,935.00) Quantity increased/decreased due
designed section in ordinary soil 2500 19.602 49005.000 11.628 29070.000 (7.974)
Cf to change in existing levels
1/6 Rehandling of earthwork: upto a lead of ‰
(656.416) (328,208.00) Quantity increased/decreased due
50 f. (15 m). 500 1366.086 683043.000 709.670 354835.000
Cf to change in existing levels
1/7 Cutting and removing trees with in
distance of 100 f. Quantity increased/decreased due
No 50 13.000 650.000 13.000 650.000 0.000 0.00
(a) 2.5 ' girth to change in existing levels

1/8 Cutting and removing trees with in


distance of 100 f. Quantity increased/decreased due
No 60 7.000 420.000 7.000 420.000 0.000 0.00
(b) 2.5' to 6' girth to change in existing levels

Total 17,022,613.80 19,173,261.80 2,151,718.00


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-03/1)
(Estimate based on revised construction drawing issued in …..)

Hussain Disty

Sr. Unit Rate Quantity as per Bid Revised Quantity as Per


Description Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-03/01

Qty Amount Qty Amount Qty Amount


2/1 Cement plaster 1.5" (40 mm) thick
ratio 1:6, in bed. Quantity increased/decreased due
% Sf 1500 1344.713 2017068.750 1984.805 2977207.500 640.093 960,138.75 increasing the length of lining.

2/2 Cement plaster 1.5" (40 mm) thick


1,131,617.57 Quantity
ratio 1:6, on slope. increased/decreased due
% Sf 1600 2645.188 4232300.000 3352.448 5363917.568 707.261 increasing the length of lining.

2/3 Cement concrete lining using


washed screened and graded % Cf 16000 333.720 5339520.000 522.375 8358000.000 188.655 3,018,480.00 Quantity increased/decreased due
stone aggregate, ratio 1:2:4 Type increasing the length of lining.
C, in bed.
2/4 Cement concrete lining using
washed screened and graded % Cf 18000 Quantity increased/decreased due
658.840 11859120.000 882.391 15883038.000 223.551 4,023,918.00 increasing the length of lining.
stone aggregate, ratio 1:2:4 Type
-C, in slope.
2/5 Filling expansion joints with
16,288.84 Quantity
bitumen. sand & saw dust in ratio Rf increased/decreased due
10 3989.900 39899.000 5618.784 56187.840 1628.884
1:2:2. increasing the length of lining.

2/6 Providing and placing cement


sand and bitumen in joint sealent
ratio 1:2:3, 1/2" wide and 1" Rf Quantity increased/decreased due
4 35909.100 143636.400 50569.056 202276.224 14659.956 58,639.82
thick. increasing the length of lining.
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-03/1)
(Estimate based on revised construction drawing issued in …..)

Hussain Disty

Sr. Unit Rate Quantity as per Bid Revised Quantity as Per


Description Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-03/01

Qty Amount Qty Amount Qty Amount


2/7 Cement concrete plain including
placing, compacting, finishing, and
curing complete in all respect in % Cf 16000 Quantity increased/decreased due
49.874 797979.200 70.383 1126122.080 20.509 328,142.88
pad and under joints increasing the length of lining.

2/8 Bitumen coating to plastered or


cement concrete surface.
20 lbs per 100 Sf ( 9.07 kg per Sq. % Sf 400 Quantity increased/decreased due
199.495 79798.000 281.531 112612.208 82.036 32,814.21
m.) increasing the length of lining.

2/9 Earthwork excavation in irrigation


channels, drains, etc. to designed
section, grades and profiles,
excavated material disposed off
and dressed within 50 f. (15 m) ‰Cf 3000 Quantity increased/decreased due
4.987 14962.110 3.519 10557.395 (1.468) (4,404.72)
lead in ordinary soil. increasing the length of lining.

Total 24,524,283.46 34,089,918.81 9,565,635.35


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT

CONCRETE LINING OF HUSSAIN DISTY FROM RD. 0+000 - 29+550 (TAIL)


ESTIMATE OF EARTHWORK

Sr.
Description Qty
#

1 Earthwork excavation in irrigation channels, drains, etc. to


designed section, grades and profiles, excavated material disposed
off and dressed within 50 ft. (15 m) lead in ordinary soil.

Quantity as per coloumn No. 10+22


(Cut of Channel Prism + Cut of Diversion) from detail
Rate as per item No. 10(i) of chapter No. 3 1286927
2 Borrowpit excavation undressed lead upto 1/4 Mile in ordinary
soil.
Quantity as per coloumn No. 29 from detail
Ch# 3 Serial No. 4 (a) + 18(b) + 17 a 3974517
3 Compaction of earthwork with power road roller, including
ploughing, mixing, moistening earth to optimum moisture content
in layers, etc. complete: 90% maximum modified AASHO dry
density
Quantity as per coloumn No. 6 from detail
Serial No. 25(ii) Ch# 3 1963124
4 Compaction of earthwork with power road roller, including
ploughing, mixing, moistening earth to optimum moisture content
in layers, etc. complete: 85% maximum modified AASHO dry
density.
Quantity as per coloumn No. 26 from detail.
Serial No. 25(iii) Ch# 3 2064494
5 Earthwork excavation undressed lead up to single throw of kassi,
phaorah, or showel in ordinary soil.
Qty as per Coloumn No. 18 from detail.
Ch# 3 Serial No. 1(b) 11628
0

6 Rehandling of earthwork: upto a lead of 50 ft. (15 m) and dressing


as per designed section.
Quantity as per coloumn No. (30) from detail
Ch# 3 Serial No. 13(b) 18 (b) 709670

G.Total
ESTIMATE OF EARTHWORK

Sub Divisional Officer Executive Eng


Kadra Sub Division Rajanpur Canal D
Rajanpur Rajanpur
ENT PROJECT

0+000 - 29+550 (TAIL)

Detailed Estimate

Unit Rate as per


MRS 2nd Amount
Qtr 2011

%0Cft 2283.05 2938119.0

%0Cft 3146.35 12505222

%0Cft 746.10 1464687

%0Cft 633.45 1307754

%0Cft 1283.05 14919


0.00

%0Cft 997.90 708180

18938881
Executive Engineer
Rajanpur Canal Division
Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
CONCRETE LINING OF HUSSAIN DISTY FROM RD. 0+000 - 33+15

Channel Prisim Bank


Fill Cut Fill Cut

R.D Length Total Mean Area Total Mean Total Mean


Area Quantity Total Mean Quantity Quantity Area Quantity
Area Area Area (Sft) Area Area Area Area
(Sft) (Cft) Area Area (Cft) (Cft) (Sft) (Cft)
(Sft) (Sft) (L+R) (Sft) (Sft) (Sft) (Sft)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15.00 16 17 18

0 0 32.01 32.01 16.01 0 53.38 53.38 26.69 0 27.77 27.77 13.89 0 0.90 0.90 0.45 0

250 250 38.32 70.33 35.17 8793 52.20 105.58 52.79 13198 28.84 56.61 28.31 7078 1.13 2.03 1.02 255

500 250 52.35 90.67 45.34 11335 48.01 100.21 50.11 12528 11.32 40.16 20.08 5020 1.40 2.53 1.27 318

750 250 37.87 90.22 45.11 11278 52.94 100.95 50.48 12620 1.46 12.78 6.39 1598 4.63 6.03 3.02 755

1000 250 43.04 80.91 40.46 10115 55.61 108.55 54.28 13570 0.38 1.84 0.92 230 9.65 14.28 7.14 1785

1250 250 46.86 89.90 44.95 11238 52.60 108.21 54.11 13528 0.00 0.38 0.19 48 12.62 22.27 11.14 2785

1500 250 47.76 94.62 47.31 11828 48.01 100.61 50.31 12578 8.22 8.22 4.11 1028 0.24 12.86 6.43 1608

1750 250 44.35 92.11 46.06 11515 51.64 99.65 49.83 12458 4.14 12.36 6.18 1545 7.86 8.10 4.05 1013

2000 250 57.99 102.34 51.17 12793 49.21 100.85 50.43 12608 15.60 19.74 9.87 2468 0.00 7.86 3.93 983

2250 250 58.73 116.72 58.36 14590 48.01 97.22 48.61 12153 13.05 28.65 14.33 3583 0.00 0.00 0.00 0

2500 250 65.28 124.01 62.01 15503 48.01 96.02 48.01 12003 18.82 31.87 15.94 3985 0.00 0.00 0.00 0

2750 250 84.20 149.48 74.74 18685 48.01 96.02 48.01 12003 19.53 38.35 19.18 4795 0.00 0.00 0.00 0

3000 250 66.86 151.06 75.53 18883 48.01 96.02 48.01 12003 21.55 41.08 20.54 5135 0.00 0.00 0.00 0

3250 250 63.36 130.22 65.11 16278 48.01 96.02 48.01 12003 12.46 34.01 17.01 4253 0.00 0.00 0.00 0

3500 250 66.95 130.31 65.16 16290 48.01 96.02 48.01 12003 32.03 44.49 22.25 5563 0.00 0.00 0.00 0

3750 250 54.55 121.50 60.75 15188 48.01 96.02 48.01 12003 34.90 66.93 33.47 8368 0.00 0.00 0.00 0

4000 250 66.16 120.71 60.36 15090 48.01 96.02 48.01 12003 14.68 49.58 24.79 6198 0.00 0.00 0.00 0

4250 250 70.85 137.01 68.51 17128 48.01 96.02 48.01 12003 13.52 28.20 14.10 3525 0.00 0.00 0.00 0
Channel Prisim Bank
Fill Cut Fill Cut

R.D Length Total Mean Area Total Mean Total Mean


Area Quantity Total Mean Quantity Quantity Area Quantity
Area Area Area (Sft) Area Area Area Area
(Sft) (Cft) Area Area (Cft) (Cft) (Sft) (Cft)
(Sft) (Sft) (L+R) (Sft) (Sft) (Sft) (Sft)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15.00 16 17 18
4500 250 68.01 138.86 69.43 17358 48.01 96.02 48.01 12003 10.21 23.73 11.87 2968 0.00 0.00 0.00 0

4750 250 64.03 132.04 66.02 16505 48.01 96.02 48.01 12003 13.99 24.20 12.10 3025 0.00 0.00 0.00 0

5000 250 62.66 126.69 63.35 15838 48.01 96.02 48.01 12003 6.02 20.01 10.01 2503 0.00 0.00 0.00 0

5250 250 57.88 120.54 60.27 15068 48.01 96.02 48.01 12003 7.38 13.40 6.70 1675 0.00 0.00 0.00 0

5500 250 65.98 123.86 61.93 15483 48.01 96.02 48.01 12003 24.41 31.79 15.90 3975 0.00 0.00 0.00 0

5750 250 63.69 129.67 64.84 16210 48.01 96.02 48.01 12003 7.59 32.00 16.00 4000 0.00 0.00 0.00 0

6000 250 60.62 124.31 62.16 15540 48.01 96.02 48.01 12003 14.89 22.48 11.24 2810 0.00 0.00 0.00 0

6250 250 64.54 125.16 62.58 15645 48.01 96.02 48.01 12003 21.06 35.95 17.98 4495 0.00 0.00 0.00 0

6500 250 64.33 128.87 64.44 16110 48.01 96.02 48.01 12003 28.82 49.88 24.94 6235 0.00 0.00 0.00 0

6750 250 51.85 116.18 58.09 14523 48.63 96.64 48.32 12080 2.68 31.50 15.75 3938 0.00 0.00 0.00 0

7000 250 52.21 104.06 52.03 13008 48.01 96.64 48.32 12080 12.36 15.04 7.52 1880 0.00 0.00 0.00 0

7250 250 60.88 113.09 56.55 14138 48.01 96.02 48.01 12003 10.41 22.77 11.39 2848 0.00 0.00 0.00 0

7500 250 54.43 115.31 57.66 14415 48.01 96.02 48.01 12003 10.66 21.07 10.54 2635 0.00 0.00 0.00 0

7750 250 57.89 112.32 56.16 14040 48.01 96.02 48.01 12003 12.61 23.27 11.64 2910 0.00 0.00 0.00 0

8050 300 61.62 119.51 59.76 17928 46.57 94.58 47.29 14187 17.98 30.59 15.30 4590 0.00 0.00 0.00 0

8250 200 59.30 120.92 60.46 12092 46.57 93.14 46.57 9314 15.00 32.98 16.49 3298 0.00 0.00 0.00 0

8500 250 53.45 112.75 56.38 14095 46.57 93.14 46.57 11643 20.57 35.57 17.79 4448 0.00 0.00 0.00 0

8750 250 58.93 112.38 56.19 14048 46.57 93.14 46.57 11643 9.05 29.62 14.81 3703 0.00 0.00 0.00 0

9000 250 69.62 128.55 64.28 16070 46.57 93.14 46.57 11643 25.03 34.08 17.04 4260 0.00 0.00 0.00 0

9250 250 52.27 121.89 60.95 15238 46.57 93.14 46.57 11643 21.74 46.77 23.39 5848 0.00 0.00 0.00 0

9500 250 53.18 105.45 52.73 13183 46.57 93.14 46.57 11643 25.56 47.30 23.65 5913 0.00 0.00 0.00 0
Channel Prisim Bank
Fill Cut Fill Cut

R.D Length Total Mean Area Total Mean Total Mean


Area Quantity Total Mean Quantity Quantity Area Quantity
Area Area Area (Sft) Area Area Area Area
(Sft) (Cft) Area Area (Cft) (Cft) (Sft) (Cft)
(Sft) (Sft) (L+R) (Sft) (Sft) (Sft) (Sft)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15.00 16 17 18
9750 250 53.72 106.90 53.45 13363 46.57 93.14 46.57 11643 15.74 41.30 20.65 5163 0.00 0.00 0.00 0

10000 250 53.52 107.24 53.62 13405 46.57 93.14 46.57 11643 15.74 31.48 15.74 3935 0.00 0.00 0.00 0

10250 250 61.58 115.10 57.55 14388 44.10 90.67 45.34 11335 23.43 39.17 19.59 4898 0.00 0.00 0.00 0

10500 250 55.18 116.76 58.38 14595 44.10 88.20 44.10 11025 32.08 55.51 27.76 6940 0.00 0.00 0.00 0

10750 250 53.46 108.64 54.32 13580 44.10 88.20 44.10 11025 28.68 60.76 30.38 7595 0.00 0.00 0.00 0

11000 250 51.67 105.13 52.57 13143 44.10 88.20 44.10 11025 33.16 61.84 30.92 7730 0.00 0.00 0.00 0

11250 250 54.16 105.83 52.92 13230 44.10 88.20 44.10 11025 27.41 60.57 30.29 7573 0.00 0.00 0.00 0

11500 250 54.27 108.43 54.22 13555 44.10 88.20 44.10 11025 42.47 69.88 34.94 8735 0.00 0.00 0.00 0

11750 250 53.46 107.73 53.87 13468 44.10 88.20 44.10 11025 22.65 65.12 32.56 8140 0.00 0.00 0.00 0

12000 250 51.97 105.43 52.72 13180 44.10 88.20 44.10 11025 29.29 51.94 25.97 6493 0.00 0.00 0.00 0

12250 250 54.79 106.76 53.38 13345 44.10 88.20 44.10 11025 35.33 64.62 32.31 8078 0.00 0.00 0.00 0

12500 250 61.26 116.05 58.03 14508 44.10 88.20 44.10 11025 22.56 57.89 28.95 7238 0.00 0.00 0.00 0

12750 250 41.37 102.63 51.32 12830 44.10 88.20 44.10 11025 44.45 67.01 33.51 8378 0.00 0.00 0.00 0

13000 250 63.19 104.56 52.28 13070 44.10 88.20 44.10 11025 19.48 63.93 31.97 7993 0.00 0.00 0.00 0

13250 250 59.05 122.24 61.12 15280 44.10 88.20 44.10 11025 23.42 42.90 21.45 5363 0.00 0.00 0.00 0

13500 250 56.33 115.38 57.69 14423 44.10 88.20 44.10 11025 11.95 35.37 17.69 4423 0.00 0.00 0.00 0

13750 250 38.18 94.51 47.26 11815 44.10 88.20 44.10 11025 39.13 51.08 25.54 6385 0.00 0.00 0.00 0

14000 250 53.19 91.37 45.69 11423 44.10 88.20 44.10 11025 21.03 60.16 30.08 7520 0.00 0.00 0.00 0

14250 250 52.17 105.36 52.68 13170 44.10 88.20 44.10 11025 22.99 44.02 22.01 5503 0.00 0.00 0.00 0

14500 250 46.73 98.90 49.45 12363 44.10 88.20 44.10 11025 12.54 35.53 17.77 4443 0.00 0.00 0.00 0

14750 250 46.48 93.21 46.61 11653 44.10 88.20 44.10 11025 18.78 31.32 15.66 3915 0.00 0.00 0.00 0
Channel Prisim Bank
Fill Cut Fill Cut

R.D Length Total Mean Area Total Mean Total Mean


Area Quantity Total Mean Quantity Quantity Area Quantity
Area Area Area (Sft) Area Area Area Area
(Sft) (Cft) Area Area (Cft) (Cft) (Sft) (Cft)
(Sft) (Sft) (L+R) (Sft) (Sft) (Sft) (Sft)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15.00 16 17 18
15000 250 48.38 94.86 47.43 11858 44.10 88.20 44.10 11025 26.47 45.25 22.63 5658 0.00 0.00 0.00 0

15200 200 50.56 98.94 49.47 9894 38.80 82.90 41.45 8290 53.68 80.15 40.08 8016 0.00 0.00 0.00 0

15500 300 48.48 99.04 49.52 14856 38.80 77.60 38.80 11640 29.13 82.81 41.41 12423 0.00 0.00 0.00 0

15750 250 43.01 91.49 45.75 11438 38.80 77.60 38.80 9700 25.07 54.20 27.10 6775 0.00 0.00 0.00 0

16000 250 41.95 84.96 42.48 10620 38.80 77.60 38.80 9700 26.08 51.15 25.58 6395 0.00 0.00 0.00 0

16250 250 48.63 90.58 45.29 11323 38.80 77.60 38.80 9700 46.85 72.93 36.47 9118 0.00 0.00 0.00 0

16500 250 54.79 103.42 51.71 12928 38.80 77.60 38.80 9700 34.99 81.84 40.92 10230 0.00 0.00 0.00 0

16750 250 48.75 103.54 51.77 12943 38.80 77.60 38.80 9700 45.06 80.05 40.03 10008 0.00 0.00 0.00 0

17000 250 56.17 104.92 52.46 13115 38.80 77.60 38.80 9700 38.14 83.20 41.60 10400 0.00 0.00 0.00 0

17250 250 49.77 105.94 52.97 13243 38.80 77.60 38.80 9700 32.43 70.57 35.29 8823 0.00 0.00 0.00 0

17500 250 55.52 105.29 52.65 13163 38.80 77.60 38.80 9700 37.36 69.79 34.90 8725 0.00 0.00 0.00 0

17750 250 50.41 105.93 52.97 13243 38.80 77.60 38.80 9700 40.26 77.62 38.81 9703 0.00 0.00 0.00 0

18000 250 53.57 103.98 51.99 12998 38.80 77.60 38.80 9700 33.95 74.21 37.11 9278 0.00 0.00 0.00 0

18250 250 48.49 102.06 51.03 12758 38.80 77.60 38.80 9700 43.63 77.58 38.79 9698 0.00 0.00 0.00 0

18500 250 53.80 102.29 51.15 12788 38.80 77.60 38.80 9700 51.63 95.26 47.63 11908 0.00 0.00 0.00 0

18750 250 46.71 100.51 50.26 12565 38.80 77.60 38.80 9700 43.78 95.41 47.71 11928 0.00 0.00 0.00 0

19000 250 48.62 95.33 47.67 11918 38.80 77.60 38.80 9700 40.87 84.65 42.33 10583 0.00 0.00 0.00 0

19250 250 45.73 94.35 47.18 11795 38.80 77.60 38.80 9700 36.62 77.49 38.75 9688 0.00 0.00 0.00 0

19500 250 52.74 98.47 49.24 12310 38.80 77.60 38.80 9700 44.90 81.52 40.76 10190 0.00 0.00 0.00 0

19750 250 50.21 102.95 51.48 12870 38.80 77.60 38.80 9700 42.51 87.41 43.71 10928 0.00 0.00 0.00 0

20050 300 49.49 99.70 49.85 14955 35.56 74.36 37.18 11154 42.10 84.61 42.31 12693 0.00 0.00 0.00 0
Channel Prisim Bank
Fill Cut Fill Cut

R.D Length Total Mean Area Total Mean Total Mean


Area Quantity Total Mean Quantity Quantity Area Quantity
Area Area Area (Sft) Area Area Area Area
(Sft) (Cft) Area Area (Cft) (Cft) (Sft) (Cft)
(Sft) (Sft) (L+R) (Sft) (Sft) (Sft) (Sft)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15.00 16 17 18
20250 200 56.65 106.14 53.07 10614 35.56 71.12 35.56 7112 48.92 91.02 45.51 9102 0.00 0.00 0.00 0

20500 250 54.65 111.30 55.65 13913 35.56 71.12 35.56 8890 45.60 94.52 47.26 11815 0.00 0.00 0.00 0

20750 250 54.26 108.91 54.46 13615 35.56 71.12 35.56 8890 48.26 93.86 46.93 11733 0.00 0.00 0.00 0

21000 250 59.04 113.30 56.65 14163 35.56 71.12 35.56 8890 38.60 86.86 43.43 10858 0.00 0.00 0.00 0

21250 250 60.28 119.32 59.66 14915 35.56 71.12 35.56 8890 38.91 77.51 38.76 9690 0.00 0.00 0.00 0

21500 250 63.48 123.76 61.88 15470 35.56 71.12 35.56 8890 51.76 90.67 45.34 11335 0.00 0.00 0.00 0

21750 250 68.82 132.30 66.15 16538 35.56 71.12 35.56 8890 45.08 96.84 48.42 12105 0.00 0.00 0.00 0

21950 200 72.96 141.78 70.89 14178 26.92 62.48 31.24 6248 76.51 121.59 60.80 12160 0.00 0.00 0.00 0

22250 300 67.72 140.68 70.34 21102 26.92 53.84 26.92 8076 73.81 150.32 75.16 22548 0.00 0.00 0.00 0

22500 250 67.18 134.90 67.45 16863 26.92 53.84 26.92 6730 67.78 141.59 70.80 17700 0.00 0.00 0.00 0

22750 250 69.39 136.57 68.29 17073 26.92 53.84 26.92 6730 80.89 148.67 74.34 18585 0.00 0.00 0.00 0

23000 250 66.38 135.77 67.89 16973 26.92 53.84 26.92 6730 65.34 146.23 73.12 18280 0.00 0.00 0.00 0

23250 250 76.06 142.44 71.22 17805 26.92 53.84 26.92 6730 75.99 141.33 70.67 17668 0.00 0.00 0.00 0

23500 250 72.42 148.48 74.24 18560 26.92 53.84 26.92 6730 83.64 159.63 79.82 19955 0.00 0.00 0.00 0

23750 250 72.39 144.81 72.41 18103 26.92 53.84 26.92 6730 93.30 176.94 88.47 22118 0.00 0.00 0.00 0

24000 250 68.99 141.38 70.69 17673 26.92 53.84 26.92 6730 80.25 173.55 86.78 21695 0.00 0.00 0.00 0

24250 250 82.07 151.06 75.53 18883 26.92 53.84 26.92 6730 160.26 240.51 120.26 30065 0.00 0.00 0.00 0

24500 250 95.07 177.14 88.57 22143 26.92 53.84 26.92 6730 122.40 282.66 141.33 35333 0.00 0.00 0.00 0

24750 250 86.40 181.47 90.74 22685 26.92 53.84 26.92 6730 94.12 216.52 108.26 27065 0.00 0.00 0.00 0

25000 250 92.43 178.83 89.42 22355 26.92 53.84 26.92 6730 120.40 214.52 107.26 26815 0.00 0.00 0.00 0

25250 250 86.77 179.20 89.60 22400 26.92 53.84 26.92 6730 83.69 204.09 102.05 25513 0.00 0.00 0.00 0
Channel Prisim Bank
Fill Cut Fill Cut

R.D Length Total Mean Area Total Mean Total Mean


Area Quantity Total Mean Quantity Quantity Area Quantity
Area Area Area (Sft) Area Area Area Area
(Sft) (Cft) Area Area (Cft) (Cft) (Sft) (Cft)
(Sft) (Sft) (L+R) (Sft) (Sft) (Sft) (Sft)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15.00 16 17 18
25500 250 83.69 170.46 85.23 21308 26.92 53.84 26.92 6730 89.86 173.55 86.78 21695 0.00 0.00 0.00 0

25750 250 78.35 162.04 81.02 20255 26.92 53.84 26.92 6730 81.23 171.09 85.55 21388 0.00 0.00 0.00 0

26000 250 74.80 153.15 76.58 19145 26.92 53.84 26.92 6730 88.75 169.98 84.99 21248 0.00 0.00 0.00 0

26250 250 80.52 155.32 77.66 19415 26.92 53.84 26.92 6730 89.96 178.71 89.36 22340 0.00 0.00 0.00 0

26500 250 86.55 167.07 83.54 20885 26.92 53.84 26.92 6730 99.79 189.75 94.88 23720 0.00 0.00 0.00 0

26750 250 86.84 173.39 86.70 21675 26.92 53.84 26.92 6730 92.86 192.65 96.33 24083 0.00 0.00 0.00 0

27000 250 80.11 166.95 83.48 20870 26.92 53.84 26.92 6730 94.06 186.92 93.46 23365 0.00 0.00 0.00 0

27250 250 80.11 160.22 80.11 20028 26.92 53.84 26.92 6730 90.64 184.70 92.35 23088 0.00 0.00 0.00 0

27500 250 79.00 159.11 79.56 19890 26.92 53.84 26.92 6730 86.53 177.17 88.59 22148 0.00 0.00 0.00 0

27750 250 77.10 156.10 78.05 19513 26.92 53.84 26.92 6730 76.96 163.49 81.75 20438 0.00 0.00 0.00 0

28000 250 72.46 149.56 74.78 18695 26.92 53.84 26.92 6730 76.89 153.85 76.93 19233 0.00 0.00 0.00 0

28250 250 62.60 135.06 67.53 16883 26.92 53.84 26.92 6730 88.36 165.25 82.63 20658 0.00 0.00 0.00 0

28500 250 70.91 133.51 66.76 16690 26.92 53.84 26.92 6730 94.55 182.91 91.46 22865 0.00 0.00 0.00 0

28750 250 73.92 144.83 72.42 18105 26.92 53.84 26.92 6730 83.76 178.31 89.16 22290 0.00 0.00 0.00 0

29000 250 64.93 138.85 69.43 17358 26.92 53.84 26.92 6730 84.58 168.34 84.17 21043 0.00 0.00 0.00 0

29250 250 71.64 136.57 68.29 17073 26.92 53.84 26.92 6730 81.44 166.02 83.01 20753 0.00 0.00 0.00 0

29600 350 48.02 119.66 59.83 20941 20.06 46.98 23.49 8222 53.75 135.19 67.60 23660 0.00 0.00 0.00 0

29750 150 65.23 113.25 56.63 8495 20.06 40.12 20.06 3009 49.87 103.62 51.81 7772 0.00 0.00 0.00 0

30000 250 68.71 133.94 66.97 16743 20.06 40.12 20.06 5015 46.86 96.73 48.37 12093 0.00 0.00 0.00 0

30250 250 18.52 87.23 43.62 10905 20.06 40.12 20.06 5015 40.20 87.06 43.53 10883 0.00 0.00 0.00 0

30500 250 21.09 39.61 19.81 4953 26.24 46.30 23.15 5788 54.74 94.94 47.47 11868 8.50 8.50 4.25 1063
Channel Prisim Bank
Fill Cut Fill Cut

R.D Length Total Mean Area Total Mean Total Mean


Area Quantity Total Mean Quantity Quantity Area Quantity
Area Area Area (Sft) Area Area Area Area
(Sft) (Cft) Area Area (Cft) (Cft) (Sft) (Cft)
(Sft) (Sft) (L+R) (Sft) (Sft) (Sft) (Sft)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15.00 16 17 18
30750 250 36.16 57.25 28.63 7158 20.06 46.30 23.15 5788 60.16 114.90 57.45 14363 0.00 8.50 4.25 1063

31000 250 49.18 85.34 42.67 10668 20.06 40.12 20.06 5015 76.74 136.90 68.45 17113 0.00 0.00 0.00 0

31250 250 51.95 101.13 50.57 12643 20.06 40.12 20.06 5015 89.09 165.83 82.92 20730 0.00 0.00 0.00 0

31500 250 48.25 100.20 50.10 12525 20.06 40.12 20.06 5015 76.30 165.39 82.70 20675 0.00 0.00 0.00 0

31750 250 53.79 102.04 51.02 12755 20.06 40.12 20.06 5015 90.58 166.88 83.44 20860 0.00 0.00 0.00 0

32000 250 51.25 105.04 52.52 13130 20.06 40.12 20.06 5015 100.61 191.19 95.60 23900 0.00 0.00 0.00 0

32250 250 53.56 104.81 52.41 13103 20.06 40.12 20.06 5015 93.56 194.17 97.09 24273 0.00 0.00 0.00 0

32500 250 58.51 112.07 56.04 14010 20.06 40.12 20.06 5015 107.72 201.28 100.64 25160 0.00 0.00 0.00 0

32750 250 52.78 111.29 55.65 13913 20.06 40.12 20.06 5015 97.66 205.38 102.69 25673 0.00 0.00 0.00 0

33000 250 50.77 103.55 51.78 12945 20.06 40.12 20.06 5015 105.34 203.00 101.50 25375 0.00 0.00 0.00 0

33150 150 55.79 106.56 53.28 7992 20.06 40.12 20.06 3009 108.99 214.33 107.17 16076 0.00 0.00 0.00 0

Total= 1963124 Total 1245454 Total 1524953 Total 11628


ROVEMENT PROJECT
ROM RD. 0+000 - 33+150 (TAIL)

Diversion
Excess Fill of
Cut Fill Excess Filling Bnk Over Prsm
Total Cut Total Fill
over Cutting Cut (E/Earth.
Total Mean Div+Bnk Div
Area Quantity Total Mean Quantity (E/Earth. Rehand from
Area Area Area 18+22 26
(Sft) (Cft) Area Area (Cft) B/Pit) Div Bank)
(Sft) (Sft) (14-10)
19 20 21 22 23 24 25 26 27 28 29 30

0.00 0.00 0.00 0 113.85 113.85 56.93 0 0 0 0 0

0.00 0.00 0.00 0 116.91 230.76 115.38 28845 255 37638 37383 0

0.00 0.00 0.00 0 112.00 228.91 114.46 28615 318 39950 39632 0

0.00 0.00 0.00 0 105.41 217.41 108.71 27178 755 38456 37701 0

0.00 0.00 0.00 0 89.85 195.26 97.63 24408 1785 34523 32738 0

0.00 0.00 0.00 0 86.69 176.54 88.27 22068 2785 33306 30521 0

0.00 0.00 0.00 0 87.04 173.73 86.87 21718 1608 33546 31938 0

0.00 0.00 0.00 0 103.89 190.93 95.47 23868 1013 35383 34370 0

0.00 0.00 0.00 0 96.80 200.69 100.35 25088 983 37881 36898 0

0.00 0.00 0.00 0 112.92 209.72 104.86 26215 0 40805 40805 0

0.00 0.00 0.00 0 113.05 225.97 112.99 28248 0 43751 43751 0

0.00 0.00 0.00 0 102.38 215.43 107.72 26930 0 45615 45615 0

0.00 0.00 0.00 0 101.25 203.63 101.82 25455 0 44338 44338 0

0.00 0.00 0.00 0 103.12 204.37 102.19 25548 0 41826 41826 0

0.00 0.00 0.00 0 107.07 210.19 105.10 26275 0 42565 42565 0

0.00 0.00 0.00 0 98.15 205.22 102.61 25653 0 40841 40841 0

0.00 0.00 0.00 0 108.62 206.77 103.39 25848 0 40938 40938 0

0.00 0.00 0.00 0 125.08 233.70 116.85 29213 0 46341 46341 0


Diversion
Excess Fill of
Cut Fill Excess Filling Bnk Over Prsm
Total Cut Total Fill
over Cutting Cut (E/Earth.
Total Mean Div+Bnk Div
Area Quantity Total Mean Quantity (E/Earth. Rehand from
Area Area Area 18+22 26
(Sft) (Cft) Area Area (Cft) B/Pit) Div Bank)
(Sft) (Sft) (14-10)
19 20 21 22 23 24 25 26 27 28 29 30
0.00 0.00 0.00 0 112.26 237.34 118.67 29668 0 47026 47026 0

0.00 0.00 0.00 0 116.64 228.90 114.45 28613 0 45118 45118 0

0.00 0.00 0.00 0 82.46 199.10 99.55 24888 0 40726 40726 0

0.00 0.00 0.00 0 66.86 149.32 74.66 18665 0 33733 33733 0

0.00 0.00 0.00 0 62.73 129.59 64.80 16200 0 31683 31683 0

0.00 0.00 0.00 0 61.85 124.58 62.29 15573 0 31783 31783 0

0.00 0.00 0.00 0 91.82 153.67 76.84 19210 0 34750 34750 0

0.00 0.00 0.00 0 38.49 130.31 65.16 16290 0 31935 31935 0

0.00 0.00 0.00 0 47.68 86.17 43.09 10773 0 26883 26883 0

0.00 0.00 0.00 0 63.83 111.51 55.76 13940 0 28463 28463 0

0.00 0.00 0.00 0 69.81 133.64 66.82 16705 0 29713 29713 0

0.00 0.00 0.00 0 92.81 162.62 81.31 20328 0 34466 34466 0

0.00 0.00 0.00 0 97.29 190.10 95.05 23763 0 38178 38178 0

0.00 0.00 0.00 0 72.70 169.99 85.00 21250 0 35290 35290 0

0.00 0.00 0.00 0 48.90 121.60 60.80 18240 0 36168 36168 0

0.00 0.00 0.00 0 72.42 121.32 60.66 12132 0 24224 24224 0

0.00 0.00 0.00 0 63.08 135.50 67.75 16938 0 31033 31033 0

0.00 0.00 0.00 0 74.13 137.21 68.61 17153 0 31201 31201 0

0.00 0.00 0.00 0 82.34 156.47 78.24 19560 0 35630 35630 0

0.00 0.00 0.00 0 54.35 136.69 68.35 17088 0 32326 32326 0

0.00 0.00 0.00 0 50.72 105.07 52.54 13135 0 26318 26318 0


Diversion
Excess Fill of
Cut Fill Excess Filling Bnk Over Prsm
Total Cut Total Fill
over Cutting Cut (E/Earth.
Total Mean Div+Bnk Div
Area Quantity Total Mean Quantity (E/Earth. Rehand from
Area Area Area 18+22 26
(Sft) (Cft) Area Area (Cft) B/Pit) Div Bank)
(Sft) (Sft) (14-10)
19 20 21 22 23 24 25 26 27 28 29 30
0.00 0.00 0.00 0 48.94 99.66 49.83 12458 0 25821 25821 0

0.00 0.00 0.00 0 48.89 97.83 48.92 12230 0 25635 25635 0

0.00 0.00 0.00 0 43.05 91.94 45.97 11493 0 25881 25881 0

0.00 0.00 0.00 0 43.93 86.98 43.49 10873 0 25468 25468 0

0.00 0.00 0.00 0 42.64 86.57 43.29 10823 0 24403 24403 0

0.00 0.00 0.00 0 41.63 84.27 42.14 10535 0 23678 23678 0

0.00 0.00 0.00 0 49.21 90.84 45.42 11355 0 24585 24585 0

0.00 0.00 0.00 0 50.14 99.35 49.68 12420 0 25975 25975 0

0.00 0.00 0.00 0 53.81 103.95 51.98 12995 0 26463 26463 0

0.00 0.00 0.00 0 48.99 102.80 51.40 12850 0 26030 26030 0

0.00 0.00 0.00 0 54.58 103.57 51.79 12948 0 26293 26293 0

0.00 0.00 0.00 0 61.56 116.14 58.07 14518 0 29026 29026 0

0.00 0.00 0.00 0 83.20 144.76 72.38 18095 0 30925 30925 0

0.00 0.00 0.00 0 59.51 142.71 71.36 17840 0 30910 30910 0

0.00 0.00 0.00 0 56.51 116.02 58.01 14503 0 29783 29783 0

0.00 0.00 0.00 0 50.32 106.83 53.42 13355 0 27778 27778 0

0.00 0.00 0.00 0 27.65 77.97 38.99 9748 0 21563 21563 0

24.58 24.58 12.29 3073 21.92 49.57 24.79 6198 3073 17621 14548 0

31.15 55.73 27.87 6968 17.44 39.36 19.68 4920 6968 18090 11122 0

21.44 52.59 26.30 6575 24.34 41.78 20.89 5223 6575 17586 11011 0

15.93 37.37 18.69 4673 29.15 53.49 26.75 6688 4673 18341 13668 0
Diversion
Excess Fill of
Cut Fill Excess Filling Bnk Over Prsm
Total Cut Total Fill
over Cutting Cut (E/Earth.
Total Mean Div+Bnk Div
Area Quantity Total Mean Quantity (E/Earth. Rehand from
Area Area Area 18+22 26
(Sft) (Cft) Area Area (Cft) B/Pit) Div Bank)
(Sft) (Sft) (14-10)
19 20 21 22 23 24 25 26 27 28 29 30
3.61 19.54 9.77 2443 43.18 72.33 36.17 9043 2443 20901 18458 0

0.00 3.61 1.81 362 72.38 115.56 57.78 11556 362 21450 21088 0

0.00 0.00 0.00 0 61.61 133.99 67.00 20100 0 34956 34956 783

0.00 0.00 0.00 0 47.02 108.63 54.32 13580 0 25018 25018 0

0.00 0.00 0.00 0 29.29 76.31 38.16 9540 0 20160 20160 0

10.14 10.14 5.07 1268 32.59 61.88 30.94 7735 1268 19058 17790 0

13.46 23.60 11.80 2950 29.42 62.01 31.01 7753 2950 20681 17731 530

11.22 24.68 12.34 3085 31.55 60.97 30.49 7623 3085 20566 17481 308

8.54 19.76 9.88 2470 34.61 66.16 33.08 8270 2470 21385 18915 700

0.00 8.54 4.27 1068 44.63 79.24 39.62 9905 1068 23148 22080 0

5.85 5.85 2.93 733 37.82 82.45 41.23 10308 733 23471 22738 0

7.50 13.35 6.68 1670 35.82 73.64 36.82 9205 1670 22448 20778 3

4.01 11.51 5.76 1440 40.19 76.01 38.01 9503 1440 22501 21061 0

0.00 4.01 2.01 503 42.83 83.02 41.51 10378 503 23136 22633 0

4.62 4.62 2.31 578 39.39 82.22 41.11 10278 578 23066 22488 2208

0.00 4.62 2.31 578 48.47 87.86 43.93 10983 578 23548 22970 2228

4.13 4.13 2.07 518 40.03 88.50 44.25 11063 518 22981 22463 883

0.00 4.13 2.07 518 47.89 87.92 43.96 10990 518 22785 22267 0

0.00 0.00 0.00 0 52.49 100.38 50.19 12548 0 24858 24858 490

0.00 0.00 0.00 0 54.11 106.60 53.30 13325 0 26195 26195 1228

0.00 0.00 0.00 0 47.50 101.61 50.81 15243 0 30198 30198 1539
Diversion
Excess Fill of
Cut Fill Excess Filling Bnk Over Prsm
Total Cut Total Fill
over Cutting Cut (E/Earth.
Total Mean Div+Bnk Div
Area Quantity Total Mean Quantity (E/Earth. Rehand from
Area Area Area 18+22 26
(Sft) (Cft) Area Area (Cft) B/Pit) Div Bank)
(Sft) (Sft) (14-10)
19 20 21 22 23 24 25 26 27 28 29 30
0.00 0.00 0.00 0 49.70 97.20 48.60 9720 0 20334 20334 1990

0.00 0.00 0.00 0 47.18 96.88 48.44 12110 0 26023 26023 2925

0.00 0.00 0.00 0 51.71 98.89 49.45 12363 0 25978 25978 2843

0.00 0.00 0.00 0 45.68 97.39 48.70 12175 0 26338 26338 1968

0.00 0.00 0.00 0 61.74 107.42 53.71 13428 0 28343 28343 800

0.00 0.00 0.00 0 55.05 116.79 58.40 14600 0 30070 30070 2445

0.00 0.00 0.00 0 44.64 99.69 49.85 12463 0 29001 29001 3215

0.00 0.00 0.00 0 73.45 118.09 59.05 11810 0 25988 25988 5912

0.00 0.00 0.00 0 66.84 140.29 70.15 21045 0 42147 42147 14472

0.00 0.00 0.00 0 73.00 139.84 69.92 17480 0 34343 34343 10970

0.00 0.00 0.00 0 81.42 154.42 77.21 19303 0 36376 36376 11855

0.00 0.00 0.00 0 70.67 152.09 76.05 19013 0 35986 35986 11550

0.00 0.00 0.00 0 76.12 146.79 73.40 18350 0 36155 36155 10938

0.00 0.00 0.00 0 113.29 189.41 94.71 23678 0 42238 42238 13225

0.00 0.00 0.00 0 102.85 216.14 108.07 27018 0 45121 45121 15388

0.00 0.00 0.00 0 110.41 213.26 106.63 26658 0 44331 44331 14965

0.00 0.00 0.00 0 84.37 194.78 97.39 24348 0 43231 43231 23335

0.00 0.00 0.00 0 80.76 165.13 82.57 20643 0 42786 42786 28603

0.00 0.00 0.00 0 68.90 149.66 74.83 18708 0 41393 41393 20335

0.00 0.00 0.00 0 76.23 145.13 72.57 18143 0 40498 40498 20085

0.00 0.00 0.00 0 57.39 133.62 66.81 16703 0 39103 39103 18783
Diversion
Excess Fill of
Cut Fill Excess Filling Bnk Over Prsm
Total Cut Total Fill
over Cutting Cut (E/Earth.
Total Mean Div+Bnk Div
Area Quantity Total Mean Quantity (E/Earth. Rehand from
Area Area Area 18+22 26
(Sft) (Cft) Area Area (Cft) B/Pit) Div Bank)
(Sft) (Sft) (14-10)
19 20 21 22 23 24 25 26 27 28 29 30
0.00 0.00 0.00 0 58.63 116.02 58.01 14503 0 35811 35811 14965

0.00 0.00 0.00 0 55.69 114.32 57.16 14290 0 34545 34545 14658

0.00 0.00 0.00 0 56.53 112.22 56.11 14028 0 33173 33173 14518

0.00 0.00 0.00 0 53.53 110.06 55.03 13758 0 33173 33173 15610

0.00 0.00 0.00 0 58.26 111.79 55.90 13975 0 34860 34860 16990

0.00 0.00 0.00 0 55.32 113.58 56.79 14198 0 35873 35873 17353

0.00 0.00 0.00 0 56.29 111.61 55.81 13953 0 34823 34823 16635

0.00 0.00 0.00 0 64.41 120.70 60.35 15088 0 35116 35116 16358

0.00 0.00 0.00 0 61.38 125.79 62.90 15725 0 35615 35615 15418

0.00 0.00 0.00 0 50.03 111.41 55.71 13928 0 33441 33441 13708

0.00 0.00 0.00 0 55.99 106.02 53.01 13253 0 31948 31948 12503

0.00 0.00 0.00 0 66.15 122.14 61.07 15268 0 32151 32151 13928

0.00 0.00 0.00 0 67.56 133.71 66.86 16715 0 33405 33405 16135

0.00 0.00 0.00 0 64.41 131.97 65.99 16498 0 34603 34603 15560

0.00 0.00 0.00 0 65.32 129.73 64.87 16218 0 33576 33576 14313

0.00 0.00 0.00 0 51.93 117.25 58.63 14658 0 31731 31731 14023

0.00 0.00 0.00 0 38.57 90.50 45.25 15838 0 36779 36779 15438

0.00 0.00 0.00 0 43.30 81.87 40.94 6141 0 14636 14636 4763

0.00 0.00 0.00 0 44.49 87.79 43.90 10975 0 27718 27718 7078

0.00 0.00 0.00 0 32.09 76.58 38.29 9573 0 20478 20478 5868

0.00 0.00 0.00 0 28.57 60.66 30.33 7583 1063 12536 11473 6080
Diversion
Excess Fill of
Cut Fill Excess Filling Bnk Over Prsm
Total Cut Total Fill
over Cutting Cut (E/Earth.
Total Mean Div+Bnk Div
Area Quantity Total Mean Quantity (E/Earth. Rehand from
Area Area Area 18+22 26
(Sft) (Cft) Area Area (Cft) B/Pit) Div Bank)
(Sft) (Sft) (14-10)
19 20 21 22 23 24 25 26 27 28 29 30
0.00 0.00 0.00 0 33.90 62.47 31.24 7810 1063 14968 13905 8575

0.00 0.00 0.00 0 35.04 68.94 34.47 8618 0 19286 19286 12098

0.00 0.00 0.00 0 38.53 73.57 36.79 9198 0 21841 21841 15715

0.00 0.00 0.00 0 44.35 82.88 41.44 10360 0 22885 22885 15660

0.00 0.00 0.00 0 42.47 86.82 43.41 10853 0 23608 23608 15845

0.00 0.00 0.00 0 39.01 81.48 40.74 10185 0 23315 23315 18885

0.00 0.00 0.00 0 36.51 75.52 37.76 9440 0 22543 22543 19258

0.00 0.00 0.00 0 47.07 83.58 41.79 10448 0 24458 24458 20145

0.00 0.00 0.00 0 47.72 94.79 47.40 11850 0 25763 25763 20658

0.00 0.00 0.00 0 41.61 89.33 44.67 11168 0 24113 24113 20360

0.00 0.00 0.00 0 43.14 84.75 42.38 6357 0 14349 14349 13067

Total 41473 Total 2064494 53101 4027618 3974517 709670

Sub Divisional Officer Executive Engineer


Kadra Sub Division Rajanpur Canal Division
Rajanpur Rajanpur
Hussain Disty.
Measurement Sheet Bill #2
Plaster in Bed & Shoulders
From RD To RD Reach Bed Slope Profile No. of plaster Profile Net Executed
Length width Length length Profiles Deduction Quantity
f f f f f f no.s sf sf %sf
00+000 08+050 8050 5.5 5.939 19.378 806 60375.000 3022.500 573.525
08+050 10+000 1950 5.25 5.911 19.072 196 14137.500 710.500 134.270
2/1 10+000 15+200 5200 5.25 5.67 18.59 521 37700.000 1888.625 358.114
15+200 20+050 4850 4.5 5.458 17.416 486 31525.000 1579.500 299.455
20+050 21+950 1900 4.25 5.218 16.686 191 11875.000 596.875 112.781
21+950 29+600 7650 3 4.765 14.53 766 38250.000 1915.000 363.350
29+600 33+150 3550 2.25 4.171 12.592 356 15087.500 756.500 143.310
Total 1984.805

Plaster on Slopes

From RD To RD Reach Bed Slope Profile No. of plaster Profile Net Executed
Length width Length length Profiles Deduction Quantity
f f f f f f no.s sf sf %sf
00+000 08+050 8050 5.5 5.939 19.378 806 95617.9 4786.834 908.31066
08+050 10+000 1950 5.25 5.911 19.072 196 23052.9 1158.556 218.94344
2/2
10+000 15+200 5200 5.25 5.67 18.59 521 58968 2954.07 560.1393
15+200 20+050 4850 4.5 5.458 17.416 486 52942.6 2652.588 502.90012
20+050 21+950 1900 4.25 5.218 16.686 191 19828.4 996.638 188.31762
21+950 29+600 7650 3 4.765 14.53 766 72904.5 3649.99 692.5451
29+600 33+150 3550 2.25 4.171 12.592 356 29614.1 1484.876 281.29224
Total 3352.448

Cement Conc. Lining in Bed

From RD To RD Reach Bed Slope Profile No. of Conc. Quantity Net Executed
Length width Length length Profiles Quantity
f f f f f f no.s cf %cf
00+000 08+050 8050 5.5 5.939 19.378 806 15093.750 150.938
08+050 10+000 1950 5.25 5.911 19.072 196 3534.375 35.344
2/3
10+000 15+200 5200 5.25 5.67 18.59 521 9425.000 94.250
15+200 20+050 4850 4.5 5.458 17.416 486 7881.250 78.813
20+050 21+950 1900 4.25 5.218 16.686 191 2968.750 29.688
21+950 29+600 7650 3 4.765 14.53 766 9562.500 95.625
29+600 33+150 3550 2.25 4.171 12.592 356 3771.875 37.719
Total 522.375

Cement Conc. Lining on Slope

Contractor Sub Divisional Officer Junior Engineer


M/S Nishan Engineers Kadara Sub Division Rajanpur PISIP Rajanpur
Hussain Disty.
Measurement Sheet Bill #2

From RD To RD Reach Bed Slope Profile No. of Conc. Quantity Net Executed
Length width Length length Profiles Quantity
f f f f f f no.s cf %cf
00+000 08+050 8050 5.5 5.939 19.378 806 23904.475 239.055
08+050 10+000 1950 5.25 5.911 19.072 196 5763.225 57.642
2/4
10+000 15+200 5200 5.25 5.67 18.59 521 14742.000 147.430
15+200 20+050 4850 4.5 5.458 17.416 486 13235.650 132.367
20+050 21+950 1900 4.25 5.218 16.686 191 4957.100 49.581
21+950 29+600 7650 3 4.765 14.53 766 18226.125 182.271
29+600 33+150 3550 2.25 4.171 12.592 356 7403.525 74.045
Total 882.391
Expansion Joints

No. of
From RD To RD Reach Bed Slope Profile Ex. Expansion. Joints Net Executed
Length width Length length Joints Quantity
f f f f f f no.s Rf Rf
00+000 08+050 8050 5.5 5.939 19.378 80.5 1559.929 1559.929
08+050 10+000 1950 5.25 5.911 19.072 19.5 371.904 371.904
2/5
10+000 15+200 5200 5.25 5.67 18.59 52 966.680 966.680
15+200 20+050 4850 4.5 5.458 17.416 48.5 844.676 844.676
20+050 21+950 1900 4.25 5.218 16.686 19 317.034 317.034
21+950 29+600 7650 3 4.765 14.53 76.5 1111.545 1111.545
29+600 33+150 3550 2.25 4.171 12.592 35.5 447.016 447.016
Total 5618.784

Construction Joints

No. of
From RD To RD Reach Bed Slope Profile Con. Constn. Joints Net Executed
Length width Length length Joint Quantity
f f f f f f no.s Rf Rf
00+000 08+050 8050 5.5 5.939 19.378 724.5 14039.361 14039.361
08+050 10+000 1950 5.25 5.911 19.072 175.5 3347.136 3347.136
2/6
10+000 15+200 5200 5.25 5.67 18.59 468 8700.120 8700.120
15+200 20+050 4850 4.5 5.458 17.416 436.5 7602.084 7602.084
20+050 21+950 1900 4.25 5.218 16.686 171 2853.306 2853.306
21+950 29+600 7650 3 4.765 14.53 688.5 10003.905 10003.905
29+600 33+150 3550 2.25 4.171 12.592 319.5 4023.144 4023.144
Total 50569.056

Cement Conc. Plain under Joints

From RD To RD Reach Bed Slope Profile No. of Conc. Quantity Net Executed
Length width Length length Profiles Quantity
f f f f f f no.s cf %cf

2/7

Contractor Sub Divisional Officer Junior Engineer


M/S Nishan Engineers Kadara Sub Division Rajanpur PISIP Rajanpur
Hussain Disty.
Measurement Sheet Bill #2
00+000 08+050 8050 5.5 5.939 19.378 806 1952.334 19.523
08+050 10+000 1950 5.25 5.911 19.072 196 467.264 4.673
2/7
10+000 15+200 5200 5.25 5.67 18.59 521 1210.674 12.107
15+200 20+050 4850 4.5 5.458 17.416 486 1058.022 10.580
20+050 21+950 1900 4.25 5.218 16.686 191 398.378 3.984
21+950 29+600 7650 3 4.765 14.53 766 1391.248 13.912
29+600 33+150 3550 2.25 4.171 12.592 356 560.344 5.603
Total 70.383

Bitumen Coating

From RD To RD Reach Bed Slope Profile No. of Bitumen Coating Net Executed
Length width Length length Profiles Quantity
f f f f f f no.s %sf %sf
00+000 08+050 8050 5.5 5.939 19.378 806 7809.334 78.093
08+050 10+000 1950 5.25 5.911 19.072 196 1869.056 18.691
2/8
10+000 15+200 5200 5.25 5.67 18.59 521 4842.695 48.427
15+200 20+050 4850 4.5 5.458 17.416 486 4232.088 42.321
20+050 21+950 1900 4.25 5.218 16.686 191 1593.513 15.935
21+950 29+600 7650 3 4.765 14.53 766 5564.990 55.650
29+600 33+150 3550 2.25 4.171 12.592 356 2241.376 22.414
Total 281.531

E/W in irrigation channel

From RD To RD Reach Bed Slope Profile No. of E/W Qty Net Executed
Length width Length length Profiles Quantity
f f f f f f no.s cf 1000Cf
00+000 08+050 8050 5.5 5.939 19.378 806 976.167 0.976
08+050 10+000 1950 5.25 5.911 19.072 196 233.632 0.234
2/9
10+000 15+200 5200 5.25 5.67 18.59 521 605.337 0.605
15+200 20+050 4850 4.5 5.458 17.416 486 529.011 0.529
20+050 21+950 1900 4.25 5.218 16.686 191 199.189 0.199
21+950 29+600 7650 3 4.765 14.53 766 695.624 0.696
29+600 33+150 3550 2.25 4.171 12.592 356 280.172 0.280
Total 3.519

Contractor Sub Divisional Officer Junior Engineer


M/S Nishan Engineers Kadara Sub Division Rajanpur PISIP Rajanpur