Cover Sheet FMEA Number: WTNSO SI 2016 004

Failure Mode and Effects Analysis FMEA Pages: 31


Edition Number: 1
Update: 27/07/2016

ASSURANCE QUALITÉ
Distributor: Process: Montage/ C4.4.1/ Indices de modifications technique sous l'adresse suivante:
Mastouri Med Kamel_QM \\natn4001\infos\Boite_EngineeringSI\Modulliste\Modulliste.xlsx
El Ghali Mehdi_Engineering Product: FMEA-P-SI_TRW-WTNSO-Montage-Assembly-FR-EN-2016_06_21
Tamada Nabil_Process Engineering
ELLEUCH Mourad_FMEA Area of production: SI_TRW
Amairia Abderrazek_Technical Plant: WTNSO
Ben Jha Idriss_Production
Initial state of 16/11/2015:
Belaid, Jihene_Training
16/11/2015 : revision of corrective action for NCR 3009 PN - 34185100 B
10/12/2015 : revision of corrective action for NCR 3069 PN - 34185099B
31/12/2015 : revision of corrective action for NCR 3121 PN 34220159B
08/01/2016 : revision of corrective action for NCR 3128 PN 34185098B
19/02/2016 : revision of corrective action for NCR 3173 PN 34185099B
07/04/2016 : revision of corrective action for NCR 3291 PN 34220159C
10/05/2016 : revision of corrective action for NCR 3363 PN - 34195763B
15/07/2016 : revision of corrective action for NCR 3520 PN 34185097 F
15/07/2016 : revision of corrective action for NCR 3510 PN 34217662A
18/07/2016 : revision of corrective action for QCCAR 764199 34195763B
Original File: 27/07/2016 : revision of corrective action for QCCAR 756699 PN 34220159D
Z:\IQ-FMEA\003- FMEA & QM Plan PS SI\003-Data
SI_TRW

Work Group:
Ghezel Naoufel_QM;
Graa Naziha_Engineering;
Najeh Hamdi _Training;
Ben jha Idriss _Production; ;
Hmissa Bessem_PT;
Mohamed Draba_TD;
Houssine, Aloui_IE
Trimech Raouf_FMEA

1 page(s) suivante(s)
Build Approval Realization
Moderator Responsible Head of Depart-
Name: Trimech Raouf Dept.: Engineering Dept.: Technical Dept.: Quality ment:
Dept.: FMEA Date: 21/06/2016 Date: 21/06/2016 Date: 21/06/2016
Dept: Production
Date: 21/06/2016 Signature: Signature: Signature:
Signature: