You are on page 1of 109

FORMULIR STANDAR

PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan kansteen 10 x 20 x 40 cm, K -300
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.0700 102,960.00 7,207.20
2. Tukang OH 0.0140 109,920.00 1,538.88
3. Mandor OH 0.0070 118,880.00 832.16
4.

B. BAHAN
1. Galian tanah biasa <1m m3 0.0100 52,100.00 521.00
2. Kansteen 10 x 20 x 40 cm m1 2.5000 50,880.00 127,200.00
3.
4.
5.
6.
7.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 139,799.24


E. KEUNTUNGAN + OVERHEAD (10%) 13,979.92
F. HARGA SATUAN PEKERJAAN (D+E) 153,779.16
G. DIBULATKAN 153,700.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan sumur resapan d=100 cm, h = 150 cm
SATUAN PEMBAYARAN : unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.3500 102,960.00 36,036.00
2. Tukang OH 0.0700 109,920.00 7,694.40
3. Mandor OH 0.0350 118,880.00 4,160.80
4.

B. BAHAN
1. Galian tanah biasa > 1m max.2 m m3 0.9420 109,400.00 103,054.80
2. Buis beton d = 100 cm, h = 50 cm Bh 3.0000 53,000.00 159,000.00
3. Pekerjaan Plat atau tangga site mix camp 1 :2:3 Unit 0.4522 3,816,100.00 1,725,640.42
4.
5.
6.
7.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 2,038,086.42


E. KEUNTUNGAN + OVERHEAD (10%) 203,808.64
F. HARGA SATUAN PEKERJAAN (D+E) 2,241,895.06
G. DIBULATKAN 2,241,800.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Topi uskup K-250
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.3500 102,960.00 36,036.00
2. Tukang OH 0.0700 109,920.00 7,694.40
3. Mandor OH 0.0350 118,880.00 4,160.80
4.

B. BAHAN
1. Topi uskup Tebal 6 cm m2 1.1000 72,080.00 79,288.00
2. Abu Bata (Filler) m3 0.0550 190,800.00 10,494.00
3.
4.
5.
6.
7.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 140,173.20


E. KEUNTUNGAN + OVERHEAD (10%) 14,017.32
F. HARGA SATUAN PEKERJAAN (D+E) 154,190.52
G. DIBULATKAN 154,100.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Paving Bata 6 cm K-250
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.3500 102,960.00 36,036.00
2. Tukang OH 0.0700 109,920.00 7,694.40
3. Mandor OH 0.0350 118,880.00 4,160.80
4.

B. BAHAN
1. Paving Block K-250 Tebal 6cm Type Bata m2 1.1000 40,280.00 44,308.00
2. Abu Bata (Filler) m3 0.0550 190,800.00 10,494.00
3.
4.
5.
6.
7.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 105,193.20


E. KEUNTUNGAN + OVERHEAD (10%) 10,519.32
F. HARGA SATUAN PEKERJAAN (D+E) 115,712.52
G. DIBULATKAN 115,700.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Saklar seri (setara broco)
SATUAN PEMBAYARAN : Set
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.0500 102,960.00 5,148.00
2. Tukang OH 0.0500 109,920.00 5,496.00
3.
4.

B. BAHAN
1. Saklar setara broco set 1.0000 22,260.00 22,260.00
2.
3.
4.
5.
6.
7.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 35,404.00


E. KEUNTUNGAN + OVERHEAD (10%) 3,540.40
F. HARGA SATUAN PEKERJAAN (D+E) 38,944.40
G. DIBULATKAN 38,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Saklar tunggal (setara broco)
SATUAN PEMBAYARAN : Set
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.0500 102,960.00 5,148.00
2. Tukang OH 0.0500 109,920.00 5,496.00
3.
4.

B. BAHAN
1. Saklar setara broco set 1.0000 22,260.00 22,260.00
2.
3.
4.
5.
6.
7.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 35,404.00


E. KEUNTUNGAN + OVERHEAD (10%) 3,540.40
F. HARGA SATUAN PEKERJAAN (D+E) 38,944.40
G. DIBULATKAN 38,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Stop Kontak (setara broco)
SATUAN PEMBAYARAN : Set
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.0500 102,960.00 5,148.00
2. Tukang OH 0.0500 109,920.00 5,496.00
3.
4.

B. BAHAN
1. Stop kontak setara broco set 1.0000 25,440.00 25,440.00
2.
3.
4.
5.
6.
7.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 38,584.00


E. KEUNTUNGAN + OVERHEAD (10%) 3,858.40
F. HARGA SATUAN PEKERJAAN (D+E) 42,442.40
G. DIBULATKAN 42,400.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Water Proofing Plat Dak beton dan Plat Kanopi beton (setara Aquaproof
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Pekerja OH 0.1000
2. Tukang OH 0.2000
3.
4.

B. BAHAN
1. Pre Treatment /Cleaning m2 1.0000
2. Curbing Sudut m1 0.4000
3. Bahan Waterproofing Coating Setara Aqua Proof kg 0.5000
4.
5.
6.
7.

C. PERALATAN
1. Perlengkapan Ls 1.0000
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
SATUAN

on (setara Aquaproof)

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

102,960.00 10,296.00
109,920.00 21,984.00

33,920.00 33,920.00
25,440.00 10,176.00
51,940.00 25,970.00

2,500.00 2,500.00

104,846.00
10,484.60
115,330.60
115,300.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pengecatan - cat minyak warna Warna Biru Tosca (Listplang) Setara Pta
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Pekerja OH 0.0700
2. Tukang OH 0.0090
3.
4.

B. BAHAN
1. Cat Meni kg 0.2000
2. Plamir kg 0.1500
3. Cat dasar kg 0.1700
4. Cat penutup 2 kali kg 0.2600
5. Kuas bh 0.0100
6. Tiner kg 0.03
7. Ampelas lbr 0.2

C. PERALATAN
1.
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
SATUAN

istplang) Setara Ptalit

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

102,960.00 7,207.20
109,920.00 989.28

19,080.00 3,816.00
30,740.00 4,611.00
50,880.00 8,649.60
45,283.20 11,773.63
12,720.00 127.20
6,890.00 206.70
6,529.60 1,305.92

38,686.53
3,868.65
42,555.19
42,500.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pengecatan Plafon dwarna putih setara Vinylex
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Pekerja OH 0.0200
2. Tukang OH 0.0630
3. Mandor OH 0.0030
4.

B. BAHAN
1.
2. Cat Dasar setara vinilex ltr 0.1000
3. Cat Penutup setara Vinilex ltr 0.2600
4. Amplas bh 0.5000
5. Roll Cat bh 0.0500
6.
7.

C. PERALATAN
1.
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
SATUAN

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

102,960.00 2,059.20
109,920.00 6,924.96
118,880.00 356.64

50,880.00 5,088.00
55,120.00 14,331.20
6,529.60 3,264.80
27,560.00 1,378.00

33,402.80
3,340.28
36,743.08
36,700.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pengecatan Dinding warna putih Gading (exterior) setara Dulux
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.0200 102,960.00
2. Tukang OH 0.0630 109,920.00
3. Mandor OH 0.0030 118,880.00
4.

B. BAHAN
1. Plamur kg 0.1000 38,160.00
2. Cat Dasar setara Dulux ltr 0.1000 61,480.00
3. Cat Penutup setara Dulux ltr 0.2600 82,680.00
4. Amplas bh 0.5 6,529.60
5. Roll Cat bh 0.05 27,560.00
6.
7.

C. PERALATAN
1.
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
UAN

ior) setara Dulux

JUMLAH HARGA
(Rp)

2,059.20
6,924.96
356.64

3,816.00
6,148.00
21,496.80
3,264.80
1,378.00

45,444.40
4,544.44
49,988.84
49,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pengecatan Dinding warna putih Gading (interior) setara Vinilex
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.0200 102,960.00
2. Tukang OH 0.0630 109,920.00
3. Mandor OH 0.0030 118,880.00
4.

B. BAHAN
1. Plamur kg 0.1000 38,160.00
2. Cat Dasar setara vinilex ltr 0.1000 50,880.00
3. Cat Penutup setara Vinilex ltr 0.2600 55,120.00
4. Amplas bh 0.5 6,529.60
5. Roll Cat bh 0.05 27,560.00
6.
7.

C. PERALATAN
1.
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
N

setara Vinilex

JUMLAH HARGA
(Rp)

2,059.20
6,924.96
356.64

3,816.00
5,088.00
14,331.20
3,264.80
1,378.00

37,218.80
3,721.88
40,940.68
40,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pasangan GRC motif kayu 20 cm x 12 mm (setara jaya board)
SATUAN PEMBAYARAN : m1
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.1000 102,960.00
2. Tukang OH 0.2000 109,920.00
3. Mandor OH 0.0050 118,880.00
4.

B. BAHAN
1. GRC motif kayu 20 cm x 12 mm m1 1.2000 93,280.00
2. Paku berbagai ukuran kg 0.0500 15,052.00
3.
4.
5.
6.
7.

C. PERALATAN
1.
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
TUAN

tara jaya board)

JUMLAH HARGA
(Rp)

10,296.00
21,984.00
594.40

111,936.00
752.60

145,563.00
14,556.30
160,119.30
160,100.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : PasanganList plank kayu, motif gigi balang 30 cm tebal 1,5 cm, kayu s
SATUAN PEMBAYARAN : m1
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Jasa Pembuatan List Plank kayu Ls 1.0000
2.
3.
4.

B. BAHAN
1. Papan kayu kamper m3 0.0068
2. Paku berbagai ukuran kg 0.0500
3. Finishing kayu Ls 1.0000
4.
5.
6.
7.

C. PERALATAN
1. Alat Bantu Ls 1.0000
2. Dudukan Baja ringan m1 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
ARGA SATUAN

ng 30 cm tebal 1,5 cm, kayu setara kamper

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

40,000.00 40,000.00

6,678,000.00 45,410.40
15,052.00 752.60
20,000.00 20,000.00

1,500.00 1,500.00
18,000.00 18,000.00

125,663.00
12,566.30
138,229.30
138,200.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pasangan nok Genteng Glazur(setara kanmuri)
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.1500 102,960.00 15,444.00
2. Tukang OH 0.0600 109,920.00 6,595.20
3. Mandor OH 0.0080 118,880.00 951.04
4.

B. BAHAN
1. Genteng bubung Glazur m1 4.0000 10,812.00 43,248.00
2.
3.
4.
5.
6.
7.

C. PERALATAN
1.
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 66,238.24


E. KEUNTUNGAN + OVERHEAD (10%) 6,623.82
F. HARGA SATUAN PEKERJAAN (D+E) 72,862.06
G. DIBULATKAN 72,800.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pasangan Genteng Glazur(setara type espanica medi orange, kanmuri)
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.1500 102,960.00
2. Tukang OH 0.0600 109,920.00
3. Mandor OH 0.0080 118,880.00
4.

B. BAHAN
1. Genteng Glazur m2 14.0000 4,770.00
2.
3.
4.
5.
6.
7.

C. PERALATAN
1.
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
ATUAN

nica medi orange, kanmuri)

JUMLAH HARGA
(Rp)

15,444.00
6,595.20
951.04

66,780.00

89,770.24
8,977.02
98,747.26
98,700.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pasangan Alumunium Foil (1 muka 1,2 x 60 m)
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.1500 102,960.00
2. Tukang OH 0.0500 109,920.00
3. Mandor OH 0.0080 118,880.00
4.

B. BAHAN
1. Allumunium Foil 1 Muka 1,2 x 60 m m2 0.8333 9,010.00
2.
3.
4.
5.
6.
7.

C. PERALATAN
1.
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
SATUAN

JUMLAH HARGA
(Rp)

15,444.00
5,496.00
951.04

7,508.03

29,399.07
2,939.91
32,338.98
32,300.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan rangka atap baja ringan Zinc Allumunium C 75 x 0,75 mm (be
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Jasa Pemasangan Ls 1.0000
2.
3.
4.

B. BAHAN
1. Rangka atap Baja Ringan Zincalume C 0,75 x 75 mm m2 1.0500
2.
3.
4.
5.
6.
7.

C. PERALATAN
1.
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
RGA SATUAN

lumunium C 75 x 0,75 mm (berikut reng)

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

45,000.00 45,000.00

137,800.00 144,690.00

189,690.00
18,969.00
208,659.00
208,600.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pengeboran air + Mesin Air Jet Pump 250 W + Tralis
SATUAN PEMBAYARAN : Unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Jasa Pengeboran Air "sampai ketemu air bersih" Ls 1.0000 2,000,000.00
2.
3.
4.

B. BAHAN
1. Mesin Air Jet Pump 250 W Unit 1.0000 1,250,000.00
2. Tralis besi Set 1.0000 450,000.00
3.
4.
5.
6.
7.

C. PERALATAN
1.
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
JUMLAH HARGA
(Rp)

2,000,000.00

1,250,000.00
450,000.00

3,700,000.00
370,000.00
4,070,000.00
4,070,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Water Torn 500 L (setara Penguin)
SATUAN PEMBAYARAN : Unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1.
2.
3.
4.

B. BAHAN
1. Water Torn 500 L(Penguin) Unit 1.0000 720,800.00 720,800.00
2.
3.
4.
5.
6.
7.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 723,300.00


E. KEUNTUNGAN + OVERHEAD (10%) 72,330.00
F. HARGA SATUAN PEKERJAAN (D+E) 795,630.00
G. DIBULATKAN 795,600.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan septi tank 2 x 1,5x1,5 m (ijuk krikil) Dinding Bata Merah d
SATUAN PEMBAYARAN : Unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1.
2.
3.
4.

B. BAHAN
1. Galian Tanah Biasa m3 4.5000
2. Pasir Urug m3 0.2140
3. Lantai Kerja Beton K-100 m3 0.3000
4. Pekerjaan dinding bata merah a.d.1:5 m2 15
5. Pekerjaan Plat atau Tangga Site Mix Camp. 1:2:3 m3 0.315
6. Pas.Ijuk kg 5.4
7. Urugan kerikil 3/5 m3 1.05

C. PERALATAN
1. Perlengkapan Ls 1.0000
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
SATUAN

Dinding Bata Merah dan tutup beton

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

52,100.00 234,450.00
400,700.00 85,749.80
609,200.00 182,760.00
103,000.00 1,545,000.00
3,816,100.00 1,202,071.50
2,332.00 12,592.80
215,731.20 226,517.76

2,500.00 2,500.00

3,491,641.86
349,164.19
3,840,806.05
3,840,800.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Floor Drain standard (Ø 3") Stainless steel
SATUAN PEMBAYARAN : Unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.0100 102,960.00
2. Tukang OH 0.1000 109,920.00
3. Mandor OH 0.0050 118,880.00
4.

B. BAHAN
1. Floor Drain allumunium Bh 1.0000 49,820.00
2.
3.
4.
5.
6.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
ATUAN

Stainless steel

JUMLAH HARGA
(Rp)

1,029.60
10,992.00
594.40

49,820.00

2,500.00

64,936.00
6,493.60
71,429.60
71,400.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan kran air standard (setara kran air (alloy Brass) 1/2 ")
SATUAN PEMBAYARAN : Unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.0100 102,960.00
2. Tukang OH 0.1000 109,920.00
3. Mandor OH 0.0050 118,880.00
4.

B. BAHAN
1. Kran Air (Alloy Brass) 1/2 Inch Bh 1.0000 68,900.00
2. Seal tape Unit 0.0250 4,770.00
3.
4.
5.
6.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
AN

(alloy Brass) 1/2 ")

JUMLAH HARGA
(Rp)

1,029.60
10,992.00
594.40

68,900.00
119.25

2,500.00

84,135.25
8,413.53
92,548.78
92,500.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Piva Pvc 3 " AW (setara wavin)
SATUAN PEMBAYARAN : m1
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.0360 102,960.00
2. Tukang OH 0.0600 109,920.00
3. Mandor OH 0.0020 118,880.00
4.

B. BAHAN
1. Pipa PVC Wavin standard dia 3 inch AW m1 1.2000 15,688.00
2.
3.
4.
5.
6.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
TUAN

JUMLAH HARGA
(Rp)

3,706.56
6,595.20
237.76

18,825.60

2,500.00

31,865.12
3,186.51
35,051.63
35,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Piva Pvc 2 " AW (setara wavin)
SATUAN PEMBAYARAN : m1
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.0360 102,960.00
2. Tukang OH 0.0600 109,920.00
3. Mandor OH 0.0020 118,880.00
4.

B. BAHAN
1. Pipa PVC Wavin standard dia 2 inch AW m1 1.2000 10,812.00
2.
3.
4.
5.
6.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
TUAN

JUMLAH HARGA
(Rp)

3,706.56
6,595.20
237.76

12,974.40

2,500.00

26,013.92
2,601.39
28,615.31
28,600.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Piva Pvc 3/4 " AW (setara wavin)
SATUAN PEMBAYARAN : m1
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.0360 102,960.00
2. Tukang OH 0.0600 109,920.00
3. Mandor OH 0.0020 118,880.00
4.

B. BAHAN
1. Pipa PVC Wavin standard dia 3/4 inch AW m1 1.2000 7,208.00
2.
3.
4.
5.
6.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
TUAN

JUMLAH HARGA
(Rp)

3,706.56
6,595.20
237.76

8,649.60

2,500.00

21,689.12
2,168.91
23,858.03
23,800.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Piva Pvc 1/2 " AW (setara wavin)
SATUAN PEMBAYARAN : m1
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.0360 102,960.00
2. Tukang OH 0.0600 109,920.00
3. Mandor OH 0.0020 118,880.00
4.

B. BAHAN
1. Pipa PVC Wavin standard dia 1/2 inch AW m1 1.2000 5,035.00
2.
3.
4.
5.
6.

C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
UAN

JUMLAH HARGA
(Rp)

3,706.56
6,595.20
237.76

6,042.00

2,500.00

19,081.52
1,908.15
20,989.67
20,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan Pagar Kayu Motif Betawi-Knock Down Kayu setara kamper + Plitur Natural Glos
SATUAN PEMBAYARAN : Unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Jasa Pembuatan Pagar Kayu Ls 1.0000
2.
3.
4.

B. BAHAN
1. Papan Kayu kamper m3 0.0220
2. Paku berbagai ukuran kg 0.2250
3. Finishing kayu Ls 1.0000
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
RGA SATUAN

tara kamper + Plitur Natural Glossy

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

450,000.00 450,000.00

6,678,000.00 146,916.00
15,052.00 3,386.70
45,000.00 45,000.00

1,500.00 1,500.00

646,802.70
64,680.27
711,482.97
711,400.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : PemasanganLampu Gantung Tradisional Betawi + Lampu PL 18 watt(setara philip)
SATUAN PEMBAYARAN : Unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Tukang Listrik OH 0.1000 109,920.00 10,992.00
2. Pembantu Instalator OH 0.2500 102,960.00 25,740.00
3.
4.

B. BAHAN
1. Lampu Philips Essential 18 Watt Bh 1.0000 50,880.00 50,880.00
2. Lampu Tradisional Betawi Bh 1.0000 475,000.00 475,000.00
3.
4.
5.
6.
7.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 564,112.00


E. KEUNTUNGAN + OVERHEAD (10%) 56,411.20
F. HARGA SATUAN PEKERJAAN (D+E) 620,523.20
G. DIBULATKAN 620,500.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Down Light 4" + Lampu PL 18 watt(setara philip)
SATUAN PEMBAYARAN : Unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Tukang Listrik OH 0.1000 109,920.00 10,992.00
2. Pembantu Instalator OH 0.2500 102,960.00 25,740.00
3.
4.

B. BAHAN
1. Lampu Philips Essential 18 Watt Bh 1.0000 50,880.00 50,880.00
2. Downlight 4 " Panasonic NLP72332(Silver Crom) Bh 1.0000 48,760.00 48,760.00
3.
4.
5.
6.
7.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 137,872.00


E. KEUNTUNGAN + OVERHEAD (10%) 13,787.20
F. HARGA SATUAN PEKERJAAN (D+E) 151,659.20
G. DIBULATKAN 151,600.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Fitting Lampu (setara broco) + Lampu PL 18 watt(setara philip)
SATUAN PEMBAYARAN : Unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Tukang Listrik OH 0.1000 109,920.00 10,992.00
2. Pembantu Instalator OH 0.2500 102,960.00 25,740.00
3.
4.

B. BAHAN
1. Lampu Philips Essential 18 Watt Bh 1.0000 50,880.00 50,880.00
2. Fitting plafon besar Lux (Broco Gracio 12101) Bh 1.0000 25,440.00 25,440.00
3.
4.
5.
6.
7.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 114,552.00


E. KEUNTUNGAN + OVERHEAD (10%) 11,455.20
F. HARGA SATUAN PEKERJAAN (D+E) 126,007.20
G. DIBULATKAN 126,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Instalasi Stop Kontak 2 x 2,5 mm (setara eterna)
SATUAN PEMBAYARAN : Unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Tukang Listrik OH 0.1050 109,920.00 11,541.60
2. Pembantu Instalator OH 0.2306 102,960.00 23,742.58
3. Mandor OH 0.0050 118,880.00 594.40
4.

B. BAHAN
1. Kabel Listrik NYM 300/500 V, eterna, 2 x 2,5 mm2 m1 5.0000 12,465.60 62,328.00
2. Klem t = 4 mm Pack 0.0500 12,720.00 636.00
3. Pipa PVC wavin standart dia 1/2 inch AW m1 4.0000 5,035.00 20,140.00
4.
5.
6.
7.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 120,482.58


E. KEUNTUNGAN + OVERHEAD (10%) 12,048.26
F. HARGA SATUAN PEKERJAAN (D+E) 132,530.83
G. DIBULATKAN 132,500.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Instalasi Titik Lampu 2 x 2,5 mm (setara eterna)
SATUAN PEMBAYARAN : Unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Tukang Listrik OH 0.1050 109,920.00 11,541.60
2. Pembantu Instalator OH 0.2306 102,960.00 23,742.58
3. Mandor OH 0.0050 118,880.00 594.40
4.

B. BAHAN
1. Kabel Listrik NYM 300/500 V, eterna, 2 x 2,5 mm2 m1 5.0000 12,465.60 62,328.00
2. Klem t = 4 mm Pack 0.0500 12,720.00 636.00
3. Pipa PVC wavin standart dia 1/2 inch AW m1 4.0000 5,035.00 20,140.00
4.
5.
6.
7.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 120,482.58


E. KEUNTUNGAN + OVERHEAD (10%) 12,048.26
F. HARGA SATUAN PEKERJAAN (D+E) 132,530.83
G. DIBULATKAN 132,500.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Listrik Kap. 1300Va
SATUAN PEMBAYARAN : Lump sum
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1.
2.
3.
4.

B. BAHAN
1. Pasang Baru PLN Va 1300.0000 1,696.00 2,204,800.00
2.
3.
4.
5.
6.
7.

C. PERALATAN
1. Biaya Lain-lain Ls 1.0000 120,000.00 120,000.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 2,324,800.00


E. KEUNTUNGAN + OVERHEAD (10%) 232,480.00
F. HARGA SATUAN PEKERJAAN (D+E) 2,557,280.00
G. DIBULATKAN 2,557,200.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Listrik Kap. 900 Va
SATUAN PEMBAYARAN : Lump sum
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1.
2.
3.
4.

B. BAHAN
1. Pasang Baru PLN Va 900.0000 1,696.00 1,526,400.00
2.
3.
4.
5.
6.
7.

C. PERALATAN
1. Biaya Lain-lain Ls 1.0000 120,000.00 120,000.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 1,646,400.00


E. KEUNTUNGAN + OVERHEAD (10%) 164,640.00
F. HARGA SATUAN PEKERJAAN (D+E) 1,811,040.00
G. DIBULATKAN 1,811,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pasangan List Plafon Gypsum 7 cm (setara jaya board )
SATUAN PEMBAYARAN : m1
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.0600 102,960.00 6,177.60
2. Tukang OH 0.0600 109,920.00 6,595.20
3. Mandor OH 0.0030 118,880.00 356.64
4.

B. BAHAN
1. Gypsum profil l = 7 cm btg 1.0500 7,950.00 8,347.50
2. Tepung Gypsum kg 0.1500 3,869.00 580.35
3.
4.
5.
6.
7.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 23,557.29


E. KEUNTUNGAN + OVERHEAD (10%) 2,355.73
F. HARGA SATUAN PEKERJAAN (D+E) 25,913.02
G. DIBULATKAN 25,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pasangan Penutup GRC t = 6 mm Rangka Hollow 20/40 dan 40/40 (Setara Jaya Board)
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.3000 102,960.00 30,888.00
2. Tukang OH 0.2500 109,920.00 27,480.00
3. Mandor OH 0.0150 118,880.00 1,783.20
4.

B. BAHAN
1. Hollow 4 x 4 cm btg 0.7500 82,680.00 62,010.00
2. Hollow 2 x 4 cm, t = 1,2 btg 0.5000 76,320.00 38,160.00
3. Drywall Screw 25 mm x 0,83 pc(s) 24.3056 1,060.00 25,763.94
4. Calcium cilicate t=6mm setara GRC Lembar 0.3640 82,680.00 30,095.52
5. Jointing Coumpound UB-10/20/888/CCL 20 kg /bag (s) bag(s) 0.0190 47,700.00 906.30
6. UB Tape 75 m/roll(s) roll(s) 0.0160 16,960.00 271.36
7.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 218,858.32


E. KEUNTUNGAN + OVERHEAD (10%) 21,885.83
F. HARGA SATUAN PEKERJAAN (D+E) 240,744.15
G. DIBULATKAN 240,700.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Kusen BV Jendela Bouvenlight dan kaca bening 5 mm (0,6x0,5 mm) tebal 10 cm+plitur natural glossy(kayu setara kamper)
SATUAN PEMBAYARAN : set
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.3500 102,960.00 36,036.00
2. Tukang kayu OH 1.0500 109,920.00 115,416.00
3. Mandor OH 0.0180 118,880.00 2,139.84
4.

B. BAHAN
1. Balok 5x10 (kayu kamper) m3 0.0145 6,042,000.00 87,609.00
2. Kaca 5 mm m2 0.3300 107,060.00 35,329.80
3. Cat kayu coklat standart ls 1.0000 38,160.00 38,160.00
4.
5.
6.
7.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 316,190.64


E. KEUNTUNGAN + OVERHEAD (10%) 31,619.06
F. HARGA SATUAN PEKERJAAN (D+E) 347,809.70
G. DIBULATKAN 347,800.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Kusen J1 Jendela dan DaunJendela krepyak (0,6x1,2m) tebal 10 cm+plitur natural glossy(kayu setara kamper)
SATUAN PEMBAYARAN : set
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.3500 102,960.00 36,036.00
2. Tukang kayu OH 1.0500 109,920.00 115,416.00
3. Mandor OH 0.0180 118,880.00 2,139.84
4.

B. BAHAN
1. Balok 5x10 (kayu kamper) m3 0.0238 6,042,000.00 143,799.60
2. Papan rangka daun 3 x 20 cm (kayu kamper) m3 0.0198 9,964,000.00 197,287.20
3. kayu krepyak (kayu kamper) m3 0.0044 6,678,000.00 29,383.20
4. Grendel jendela uk.3 cm standart set 1.0000 91,160.00 91,160.00
5. Engsel daun jendela ukuran 3 standart set 2.0000 42,400.00 84,800.00
6. Hak angin samping set 1.0000 29,680.00 29,680.00
7. Cat kayu coklat standart ls 1.0000 38,160.00 38,160.00

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 769,361.84


E. KEUNTUNGAN + OVERHEAD (10%) 76,936.18
F. HARGA SATUAN PEKERJAAN (D+E) 846,298.02
G. DIBULATKAN 846,200.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Kusen P2 Pintu dan Daun pintu Doble triplek 3mm+seng 0,02 cm(0,9cm)-single+ plitur natural glo
SATUAN PEMBAYARAN : set
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.3500 102,960.00
2. Tukang kayu OH 1.0500 109,920.00
3. Mandor OH 0.0180 118,880.00
4.

B. BAHAN
1. Balok 5x10 (kayu kamper) m3 0.0330 6,042,000.00
2. Reng 2 x 3 cm (kayu kamper)-4m m1 9.5700 68,900.00
3. Triplek 3 mm m3 3.6960 71,020.00
4. Handle pintu standart set 1.0000 93,280.00
5. Selinder anak kunci standart set 1.0000 103,880.00
6. Grendel pintu 6 cm standart set 1.0000 91,160.00
7. Engsel daun pintu ukuran 4 standart set 1.0000 47,700.00
8. cat kayu coklat standar ls 1.0000 38,160.00
9. seng 0,25 m2 1.8480 16,960.00

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
UAN

m)-single+ plitur natural glossy(kayu setara kamper)

JUMLAH HARGA
(Rp)

36,036.00
115,416.00
2,139.84

199,386.00
659,373.00
262,489.92
93,280.00
103,880.00
91,160.00
47,700.00
38,160.00
31,342.08

1,500.00

1,681,862.84
168,186.28
1,850,049.12
1,850,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Kusen P1 Pintu dan Daun pintu krepyak (1,8x2,1m)(Double) tebal 10 cm+plitur natural glossy(kayu
SATUAN PEMBAYARAN : set
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.7000 102,960.00
2. Tukang kayu OH 2.1000 109,920.00
3. Mandor OH 0.0360 118,880.00
4.

B. BAHAN
1. Balok 5x10 (kayu kamper) m3 0.0396 6,042,000.00
2. Papan rangka daun 3 x 20 cm (kayu kamper) m3 0.0700 9,964,000.00
3. kayu krepyak (kayu kamper) m3 0.0305 6,678,000.00
4. Handle pintu standart set 1.0000 93,280.00
5. Selinder anak kunci standart set 1.0000 103,880.00
6. Grendel pintu 6 cm standart set 1.0000 91,160.00
7. Engsel daun pintu ukuran 4 standart set 2.0000 47,700.00
8. cat kayu coklat standar ls 1.0000 38,160.00
9.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
litur natural glossy(kayu setara kamper)

JUMLAH HARGA
(Rp)

72,072.00
230,832.00
4,279.68

239,263.20
697,480.00
203,679.00
93,280.00
103,880.00
91,160.00
95,400.00
38,160.00

1,500.00

1,870,985.88
187,098.59
2,058,084.47
2,058,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pasangan Logo Tangsel 50x50 cm dan huruf timbul h= 15 cm (stainless steel)
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 1.0000 102,960.00
2.
3.
4.

B. BAHAN
1. Logo kota tangsel 50x50 cm set 1.0000 850,000.00
2. Huruf timbul h = 15 cm Hrf 14.0000 25,000.00
" BALAI WARGA RW --"

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
UAN

h= 15 cm (stainless steel)

JUMLAH HARGA
(Rp)

102,960.00

850,000.00
350,000.00

1,500.00

1,304,460.00
130,446.00
1,434,906.00
1,434,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan Kloset duduk lengkap termasuk flusher+selang semprot(warna putih)-
SATUAN PEMBAYARAN : unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 1.1000 102,960.00
2. Tukang Batu OH 0.3000 109,920.00
3. Mandor OH 0.1600 118,880.00
4.

B. BAHAN
1. Kloset duduk standart set 1.0000 1,855,000.00
2.
3.
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
UAN

elang semprot(warna putih)-setara lokal

JUMLAH HARGA
(Rp)

113,256.00
32,976.00
19,020.80

1,855,000.00

1,500.00

2,021,752.80
202,175.28
2,223,928.08
2,223,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan Keramik dinding 20x25 cm warna putih gading (tekstur)
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.7000 102,960.00
2. Mandor OH 0.0350 118,880.00
3.
4.

B. BAHAN
1. Keramik 20x25 cm Standar (tekstur) m2 1.0500 86,920.00
2. semen kg 9.3000 -
3. Pasir Pasang m3 0.0450 286,200.00
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
UAN

utih gading (tekstur)

JUMLAH HARGA
(Rp)

72,072.00
4,160.80

91,266.00
-
12,879.00

1,500.00

181,877.80
18,187.78
200,065.58
200,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan Lantai keramik 20x20 cm warna putih gading (tekstur)
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.7000 102,960.00
2. Mandor OH 0.0350 118,880.00
3.
4.

B. BAHAN
1. Keramik 20x20 cm Standar(No tekstur) m2 1.0600 92,220.00
2. semen kg 10.4000 -
3. Pasir Pasang m3 0.0450 286,200.00
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
UAN

h gading (tekstur)

JUMLAH HARGA
(Rp)

72,072.00
4,160.80

97,753.20
-
12,879.00

1,500.00

188,365.00
18,836.50
207,201.50
207,200.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan Lantai keramik 40x40 cm warna putih gading ( No tekstur)(te
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Pekerja OH 0.7000
2. Mandor OH 0.0350
3.
4.

B. BAHAN
1. Keramik 40x40 cm Standar(No tekstur) m2 1.0400
2. semen kg 9.8000
3. Pasir Pasang m3 0.0450
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
RGA SATUAN

utih gading ( No tekstur)(tekstur)

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

102,960.00 72,072.00
118,880.00 4,160.80

103,880.00 108,035.20
- -
286,200.00 12,879.00

1,500.00 1,500.00

198,647.00
19,864.70
218,511.70
218,500.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan plesteran + acian (pakai perekat jenis mortar)
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.1838 102,960.00
2. Tukang Batu OH 0.0525 109,920.00
3. Mandor OH 0.0026 118,880.00
4.

B. BAHAN
1. Semen/ mortar untuk plesteran dan acian kg 16.0000 -
2.
3.
4.
5.
6.

C. PERALATAN
1.
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
UAN

jenis mortar)

JUMLAH HARGA
(Rp)

18,924.05
5,770.80
309.09

25,003.94
2,500.39
27,504.33
27,500.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan plesteran 1:5 tebal 1,5 cm + acian 1: 5
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.3000 102,960.00
2. Tukang Batu OH 0.1500 109,920.00
3. Mandor OH 0.0150 118,880.00
4.

B. BAHAN
1. Semen kg 4.4160 -
2. Pasir pasang m3 0.0270 286,200.00
3.
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
ATUAN

cian 1: 5

JUMLAH HARGA
(Rp)

30,888.00
16,488.00
1,783.20

-
7,727.40

1,500.00

58,386.60
5,838.66
64,225.26
64,200.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan dinding bata ringan tebal 10 cm (setara hebel)
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.2100 102,960.00
2. Tukang Batu OH 0.0900 109,920.00
3. Mandor OH 0.0090 118,880.00
4.

B. BAHAN
1. Bata ringan setara Hebel m3 0.1010 663,560.00
2. Semen / mortar (PM-110) kg 4.6120 -
3.
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
ATUAN

m (setara hebel)

JUMLAH HARGA
(Rp)

21,621.60
9,892.80
1,069.92

67,019.56
-

1,500.00

101,103.88
10,110.39
111,214.27
111,200.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan dinding bata merah ad 1:5
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.3000 102,960.00
2. Tukang Batu OH 0.1000 109,920.00
3. Mandor OH 0.0150 118,880.00
4.

B. BAHAN
1. Bata Merah standart (5x11x22cm) bh 70.0000 508.80
2. Semen kg 9.6800 -
3. Pasir pasang m3 0.0450 286,200.00
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
ATUAN

JUMLAH HARGA
(Rp)

30,888.00
10,992.00
1,783.20

35,616.00
-
12,879.00

1,500.00

93,658.20
9,365.82
103,024.02
103,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan plat atau tangga ; Site Mix Camp 1:2:3 (besi tulangan Ø 12 - 150 mm)
SATUAN PEMBAYARAN : m3
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Tukang Besi OH 1.4000
2.
3.
4.

B. BAHAN
1. Pekerjaan Beton Site Mix Camp. 1:2:3 Tanpa Pompa m2 1.1000
2. Besi Tulangan polos kg 105.0000
3. Kawat bendrat kg 3.0000
4. Kayu Kelas III (kayu lokal) 2 x pakai m3 0.2500
5. Paku 5 cm -12 cm kg 3.0000
6. Minyak Bekisting liter 1.2000
7. Balok kayu kelas II (borneo) 2 x pakai m3 0.1050
8. Plywood tebal 12 mm -2x pakai lbr 2.5000
9. Dolken Kayu Galam Dia(8-10) cm panjang 4 m btg 14.0000
9.

C. PERALATAN
1. Alat Bantu Ls 1.0000
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
RGA SATUAN

gan Ø 12 - 150 mm)

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

109,920.00 153,888.00

629,800.00 692,780.00
7,950.00 834,750.00
11,872.00 35,616.00
2,862,000.00 715,500.00
13,250.00 39,750.00
5,830.00 6,996.00
3,710,000.00 389,550.00
91,160.00 227,900.00
26,500.00 371,000.00

1,500.00 1,500.00

3,469,230.00
346,923.00
3,816,153.00
3,816,100.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan Pondasi Telapak Uk. 70x70 cm; Site Mix Camp 1:2:3 (besi tulangan 6Ø12 mm dan sengkang Ø
SATUAN PEMBAYARAN : m3
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Tukang Besi OH 2.1000
2.
3.
4.

B. BAHAN
1. Pekerjaan Beton Site Mix Camp. 1:2:3 Tanpa Pompa m2 1.1000
2. Besi Tulangan polos kg 136.5000
3. Kawat bendrat kg 4.5000
4. Kayu Kelas III (kayu lokal) 2 x pakai m3 0.4000
5. Paku 5 cm -12 cm kg 4.0000
6. Minyak Bekisting liter 2.0000
7. Plywood tebal 12 mm -2x pakai lbr 3.5000
8. Dolken Kayu Galam Dia(8-10) cm panjang 4 m btg 20.0000
9.

C. PERALATAN
1. Alat Bantu Ls 1.0000
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
RGA SATUAN

(besi tulangan 6Ø12 mm dan sengkang Ø 8 - 200 mm)

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

109,920.00 230,832.00

629,800.00 692,780.00
7,950.00 1,085,175.00
11,872.00 53,424.00
2,862,000.00 1,144,800.00
13,250.00 53,000.00
5,830.00 11,660.00
91,160.00 319,060.00
26,500.00 530,000.00

1,500.00 1,500.00

4,122,231.00
412,223.10
4,534,454.10
4,534,400.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan Balok lintel Uk. 10x10 cm; Site Mix Camp 1:2:3 (besi tulangan 4Ø12 mm dan sengkang Ø 8 -
SATUAN PEMBAYARAN : m3
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Tukang Besi OH 1.4000
2.
3.
4.

B. BAHAN
1. Pekerjaan Beton Site Mix Camp. 1:2:3 Tanpa Pompa m2 1.1000
2. Besi Tulangan polos kg 294.0000
3. Kawat bendrat kg 4.5000
4. Kayu Kelas III (kayu lokal) 2 x pakai m3 0.4000
5. Paku 5 cm -12 cm kg 4.0000
6. Minyak Bekisting liter 2.0000
7. Plywood tebal 12 mm -2x pakai lbr 3.5000
8. Dolken Kayu Galam Dia(8-10) cm panjang 4 m btg 20.0000
9.

C. PERALATAN
1. Alat Bantu Ls 1.0000
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
HARGA SATUAN

(besi tulangan 4Ø12 mm dan sengkang Ø 8 - 200 mm)

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

109,920.00 153,888.00

629,800.00 692,780.00
7,950.00 2,337,300.00
11,872.00 53,424.00
2,862,000.00 1,144,800.00
13,250.00 53,000.00
5,830.00 11,660.00
91,160.00 319,060.00
26,500.00 530,000.00

1,500.00 1,500.00

5,297,412.00
529,741.20
5,827,153.20
5,827,100.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan Ring Balok Uk. 10x15 cm; Site Mix Camp 1:2:3 (besi tulangan 4Ø12 mm dan sengkang Ø 8 - 20
SATUAN PEMBAYARAN : m3
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Tukang Besi OH 2.1000
2.
3.
4.

B. BAHAN
1. Pekerjaan Beton Site Mix Camp. 1:2:3 Tanpa Pompa m2 1.1000
2. Besi Tulangan polos kg 294.0000
3. Kawat bendrat kg 3.0000
4. Kayu Kelas III (kayu lokal) 2 x pakai m3 0.3200
5. Paku 5 cm -12 cm kg 3.2000
6. Minyak Bekisting liter 1.6000
7. Plywood tebal 12 mm -2x pakai lbr 2.8000
8. Dolken Kayu Galam Dia(8-10) cm panjang 4 m btg 16.0000
9.

C. PERALATAN
1. Alat Bantu Ls 1.0000
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
RGA SATUAN

i tulangan 4Ø12 mm dan sengkang Ø 8 - 200 mm)

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

109,920.00 230,832.00

629,800.00 692,780.00
7,950.00 2,337,300.00
11,872.00 35,616.00
2,862,000.00 915,840.00
13,250.00 42,400.00
5,830.00 9,328.00
91,160.00 255,248.00
26,500.00 424,000.00

1,500.00 1,500.00

4,944,844.00
494,484.40
5,439,328.40
5,439,300.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan kolom Beton Uk. 10x15 cm; Site Mix Camp 1:2:3 (besi tulangan 4Ø12 mm dan sengkang Ø 8 - 20
SATUAN PEMBAYARAN : m3
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Tukang Besi OH 2.1000
2.
3.
4.

B. BAHAN
1. Pekerjaan Beton Site Mix Camp. 1:2:3 Tanpa Pompa m2 1.1000
2. Besi Tulangan polos kg 294.0000
3. Kawat bendrat kg 4.5000
4. Kayu Kelas III (kayu lokal) 2 x pakai m3 0.4000
5. Paku 5 cm -12 cm kg 4.0000
6. Minyak Bekisting liter 2.0000
7. Plywood tebal 12 mm -2x pakai lbr 3.5000
8. Dolken Kayu Galam Dia(8-10) cm panjang 4 m btg 20.0000
9.

C. PERALATAN
1. Alat Bantu Ls 1.0000
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
HARGA SATUAN

(besi tulangan 4Ø12 mm dan sengkang Ø 8 - 200 mm)

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

109,920.00 230,832.00

629,800.00 692,780.00
7,950.00 2,337,300.00
11,872.00 53,424.00
2,862,000.00 1,144,800.00
13,250.00 53,000.00
5,830.00 11,660.00
91,160.00 319,060.00
26,500.00 530,000.00

1,500.00 1,500.00

5,374,356.00
537,435.60
5,911,791.60
5,911,700.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan Balok Beton Uk. 15 x 20cm; Site Mix Camp 1:2:3 (besi tulangan 6Ø12 mm dan sengkang Ø 8 - 2
SATUAN PEMBAYARAN : m3
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS

A. TENAGA
1. Tukang Besi OH 1.4000
2.
3.
4.

B. BAHAN
1. Pekerjaan Beton Site Mix Camp. 1:2:3 Tanpa Pompa m2 1.1000
2. Besi Tulangan polos kg 220.5000
3. Kawat bendrat kg 3.0000
4. Kayu Kelas III (kayu lokal) 2 x pakai m3 0.3200
5. Paku 5 cm -12 cm kg 3.2000
6. Minyak Bekisting liter 1.6000
7. Plywood tebal 12 mm -2x pakai lbr 2.8000
8. Dolken Kayu Galam Dia(8-10) cm panjang 4 m btg 16.0000
9.

C. PERALATAN
1. Alat Bantu Ls 1.0000
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
HARGA SATUAN

(besi tulangan 6Ø12 mm dan sengkang Ø 8 - 200 mm)

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)

109,920.00 153,888.00

629,800.00 692,780.00
7,950.00 1,752,975.00
11,872.00 35,616.00
2,862,000.00 915,840.00
13,250.00 42,400.00
5,830.00 9,328.00
91,160.00 255,248.00
26,500.00 424,000.00

1,500.00 1,500.00

4,283,575.00
428,357.50
4,711,932.50
4,711,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan Beton Site Mix Campuran 1:2:3 Tanpa Pompa
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 1.6050 102,960.00
2. Tukang Batu OH 0.2050 109,920.00
3. Mandor OH 0.0780 118,880.00
4.

B. BAHAN
1. Semen kg 230.0000 -
2. Pasir pasang m3 0.5200 286,200.00
3. Kerikil 1-5 m3 0.7800 215,731.20
4. Air ltr 215.0000 265.00
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
ATUAN

Tanpa Pompa

JUMLAH HARGA
(Rp)

165,250.80
22,533.60
9,272.64

-
148,824.00
168,270.34
56,975.00

1,500.00

572,626.38
57,262.64
629,889.01
629,800.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan Beton Site Mix K- 100 Lantai Kerja
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 1.2000 102,960.00
2. Tukang Batu OH 0.2000 109,920.00
3. Mandor OH 0.0600 118,880.00
4.

B. BAHAN
1. Semen kg 230.0000 -
2. Pasir pasang m3 0.6379 286,200.00
3. Kerikil 1-5 m3 0.7607 215,731.20
4. Air ltr 200.0000 265.00
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
ATUAN

JUMLAH HARGA
(Rp)

123,552.00
21,984.00
7,132.80

-
182,566.98
164,106.72
53,000.00

1,500.00

553,842.50
55,384.25
609,226.75
609,200.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Urugan Tanah Kembali Bekas Galian
SATUAN PEMBAYARAN : m3
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.1920 102,960.00 19,768.32
2. Mandor OH 0.0190 118,880.00 2,258.72
3.
4.

B. BAHAN
1.
2.
3.
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 23,527.04


E. KEUNTUNGAN + OVERHEAD (10%) 2,352.70
F. HARGA SATUAN PEKERJAAN (D+E) 25,879.74
G. DIBULATKAN 25,800.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Urugan Pasir (Bawah Pondasi)
SATUAN PEMBAYARAN : m3
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.3000 102,960.00 30,888.00
2. Mandor OH 0.0100 118,880.00 1,188.80
3.
4.

B. BAHAN
1. Pasir Urug m3 1.2000 275,600.00 330,720.00
2.
3.
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 364,296.80


E. KEUNTUNGAN + OVERHEAD (10%) 36,429.68
F. HARGA SATUAN PEKERJAAN (D+E) 400,726.48
G. DIBULATKAN 400,700.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Galian Tanah Biasa > 1 m, max 2m
SATUAN PEMBAYARAN : m3
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.9000 102,960.00 92,664.00
2. Mandor OH 0.0450 118,880.00 5,349.60
3.
4.

B. BAHAN
1.
2.
3.
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 99,513.60


E. KEUNTUNGAN + OVERHEAD (10%) 9,951.36
F. HARGA SATUAN PEKERJAAN (D+E) 109,464.96
G. DIBULATKAN 109,400.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Galian Tanah Biasa max 1 m
SATUAN PEMBAYARAN : m3
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN JUMLAH HARGA


NO KETERANGAN SATUAN
KUANTITAS (Rp) (Rp)

A. TENAGA
1. Pekerja OH 0.4000 102,960.00 41,184.00
2. Mandor OH 0.0400 118,880.00 4,755.20
3.
4.

B. BAHAN
1.
2.
3.
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C) 47,439.20


E. KEUNTUNGAN + OVERHEAD (10%) 4,743.92
F. HARGA SATUAN PEKERJAAN (D+E) 52,183.12
G. DIBULATKAN 52,100.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pemasangan Papan Nama Proyek Uk. 60 x 90
SATUAN PEMBAYARAN : Unit
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.5000 102,960.00
2. Tukang Kayu OH 0.2500 109,920.00
3. Mandor OH 0.0050 118,880.00
4.

B. BAHAN
1. Multiplek (uk. 122 x 244 cm) 6 mm Lbr 0.1995 139,213.33
2. Digital printing 60 x 90 cm Lbr 0.5400 26,500.00
3. Kayu kaso 5/7 (meranti) m3 0.0228 3,604,000.00
4. Paku Segala Ukuran kg 0.1000 15,052.00
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
ATUAN

JUMLAH HARGA
(Rp)

51,480.00
27,480.00
594.40

27,773.06
14,310.00
82,171.20
1,505.20

1,500.00

206,813.86
20,681.39
227,495.25
227,400.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PROVINSI : BANTEN
JENIS PEKERJAAN : Pekerjaan Pengukuran Kembali (site) dan Pemasangan Bowplang
SATUAN PEMBAYARAN : m2
KETERANGAN : Analisa Harga Satuan Tahun 2016

PERKIRAAN HARGA SATUAN


NO KETERANGAN SATUAN
KUANTITAS (Rp)

A. TENAGA
1. Pekerja OH 0.1000 102,960.00
2. Tukang Kayu OH 0.1000 109,920.00
3. Mandor OH 0.0050 118,880.00
4.

B. BAHAN
1. Kayu Kaso 5/7 (Meranti) m3 0.0120 3,604,000.00
2. Paku biasa 2"-5" kg 0.0200 13,250.00
3. Kayu papan 3/20 borneo m3 0.0070 3,816,000.00
4.
5.
6.

C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN(A+B+C)


E. KEUNTUNGAN + OVERHEAD (10%)
F. HARGA SATUAN PEKERJAAN (D+E)
G. DIBULATKAN
TUAN

emasangan Bowplang

JUMLAH HARGA
(Rp)

10,296.00
10,992.00
594.40

43,248.00
265.00
26,712.00

1,500.00

93,607.40
9,360.74
102,968.14
102,900.00
DAFTAR HARGA SATUAN UPAH

KABUPATEN/KOTA : KOTA TANGERANG SELATAN


PEKERJAAN : PEMBANGUNAN BALAI WARGA
KEGIATAN :
TAHUN ANGGARAN : 2016

NO URAIAN SATUAN HARGA (Rp)

1. Pekerja OH 102,960.00
2. Pembantu Instalator OH 102,960.00
3. Instalator OH 109,920.00
4. Tukang OH 109,920.00
5. Tukang Kayu OH 109,920.00
6. Tukang Batu OH 109,920.00
7. Tukang Gali OH 109,920.00
8. Mandor OH 118,880.00
9. Tukang besi OH 109,920.00
10. Tukang Listrik OH 109,920.00
DAFTAR HARGA SATUAN BAHAN

KABUPATEN/KOTA : TANGERANG SELATAN


PEKERJAAN : PEMBANGUNAN BALAI WARGA
KEGIATAN :
TAHUN ANGGARAN : 2016

NO URAIAN SATUAN HARGA (Rp)


Dolken Kayu Galam Dia(8-10) cm panjang 4 m batang 26,500.00
Kayu Kaso 5/7 (Meranti) m3 3,604,000.00
Kayu papan 3/20 borneo m3 3,816,000.00
Kayu Kelas III (kayu lokal) 2 x pakai m3 2,862,000.00
Balok kayu kelas II (borneo) 2 x pakai m3 3,710,000.00
Balok 5x10 (kayu kamper) m3 6,042,000.00
Papan rangka daun 3 x 20 cm (kayu kamper) m3 9,964,000.00
kayu krepyak (kayu kamper) m3 6,678,000.00
Reng 2 x 3 cm (kayu kamper)-4m M1 68,900.00
Multiplek (uk. 122 x 244 cm) 6 mm lbr 139,213.33
Plywood tebal 12 mm -2x pakai lbr 91,160.00
Triplek 3 mm m3 71,020.00
Digital printing 60 x 90 cm lbr 26,500.00
Paku Segala Ukuran kg 15,052.00
Paku biasa 2"-5" kg 13,250.00
Paku 5 cm -12 cm kg 13,250.00
Semen / mortar (PM-110) kg -
Pasir Urug m3 275,600.00
Pasir pasang m3 286,200.00
Semen kg -
Kerikil 1-5 m3 215,731.20
Air ltr 265.00
Besi Tulangan polos kg 7,950.00
Kawat bendrat kg 11,872.00
Minyak Bekisting liter 5,830.00
Bata Merah standart (5x11x22cm) bh 508.80
Bata ringan setara Hebel m3 663,560.00
Keramik 40x40 cm Standar(No tekstur) m2 103,880.00
Keramik 20x20 cm Standar(No tekstur) m2 92,220.00
Keramik 20x25 cm Standar (tekstur) m2 86,920.00
Kloset duduk standart set 1,855,000.00
Handle pintu standart set 93,280.00
Selinder anak kunci standart set 103,880.00
Grendel pintu 6 cm standart set 91,160.00
Engsel daun pintu ukuran 4 standart set 47,700.00
cat kayu coklat standar ls 38,160.00
Engsel daun jendela ukuran 3 standart set 42,400.00
seng 0,25 m2 16,960.00
Hak angin samping set 29,680.00
Kaca 5 mm m2 107,060.00
Hollow 4 x 4 cm btg 82,680.00
Hollow 2 x 4 cm, t = 1,2 btg 76,320.00
Drywall Screw 25 mm x 0,83 pc(s) 1,060.00
Calcium cilicate t=6mm setara GRC Lembar 82,680.00
Jointing Coumpound UB-10/20/888/CCL 20 kg /bag (s) bag(s) 47,700.00
UB Tape 75 m/roll(s) roll(s) 16,960.00
Gypsum profil l = 7 cm btg 7,950.00
Tepung Gypsum kg 3,869.00
Pasang Baru PLN Va 1,696.00
Kabel Listrik NYM 300/500 V, eterna, 2 x 2,5 mm2 m1 12,465.60
Klem t = 4 mm Pack 12,720.00
Lampu Philips Essential 18 Watt Bh 50,880.00
Fitting plafon besar Lux (Broco Gracio 12101) Bh 25,440.00
Downlight 4 " Panasonic NLP72332(Silver Crom) Bh 48,760.00
Lampu Tradisional Betawi Bh 1,961,000.00
Finishing kayu Ls 190,800.00
Pipa PVC Wavin standard dia 1/2 inch AW m1 5,035.00
Pipa PVC Wavin standard dia 3/4 inch AW m1 7,208.00
Pipa PVC Wavin standard dia 2 inch AW m1 10,812.00
Pipa PVC Wavin standard dia 3 inch AW m1 15,688.00
Kran Air (Alloy Brass) 1/2 Inch Bh 68,900.00
Seal tape Unit 4,770.00
Floor Drain allumunium Bh 49,820.00
Pas.Ijuk kg 2,332.00
Water Torn 500 L(Penguin) Unit 720,800.00
Mesin Air Jet Pump 250 W Unit 1,314,400.00
Tralis besi Set 360,400.00
Rangka atap Baja Ringan Zincalume C 0,75 x 75 mm m2 137,800.00
Allumunium Foil 1 Muka 1,2 x 60 m m2 9,010.00
Genteng Glazur m2 4,770.00
Genteng bubung Glazur pcs 10,812.00
GRC motif kayu 20 cm x 12 mm pcs 93,280.00
Plamur kg 38,160.00
Cat Dasar setara vinilex ltr 50,880.00
Cat Penutup setara Vinilex ltr 55,120.00
Amplas bh 6,529.60
Roll Cat bh 27,560.00
Cat Dasar setara Dulux ltr 61,480.00
Cat Penutup setara Dulux ltr 82,680.00
Cat Meni kg 19,080.00
Plamir kg 30,740.00
Cat dasar kg 50,880.00
Kuas bh 12,720.00
Tiner kg 6,890.00
Cat penutup 2 kali kg 45,283.20
Pre Treatment /Cleaning m2 33,920.00
Curbing Sudut m1 25,440.00
Bahan Waterproofing Coating Setara Aqua Proof kg 51,940.00
Stop kontak setara broco set 25,440.00
Saklar setara broco set 22,260.00
Paving Block K-250 Tebal 6cm Type Bata m2 40,280.00
Abu Bata (Filler) m3 190,800.00
Topi uskup Tebal 6 cm m2 72,080.00
Buis beton d = 100 cm, h = 50 cm Bh 53,000.00
Kansteen 10 x 20 x 40 cm m1 50,880.00

You might also like