You are on page 1of 15

RESURFACING OF RUNWAY AND AIRCRAFT OPERATING AREAS AT AF STATION CHANDIGARH

BSCPL INFRASTRUCTURE LTD


Balance Work tobe Executed as per Contract Agreement

BOQ Executed Balance To be


S.no Description of Item BOQ Item No Unit Quantity Quantity upto Executed Rate (Rs) Amount (Rs) Remarks
RAR-37
1 Soil Stabilization 127 Cum 72149.4 60558 11592 506 5865462
2 Cement 128 Kg 6854193 4936654 1917539 7 13422775
3 GSB 94,95,98,99 Cum 59957 0 59957 2040

4 WMM 46,96,100 Cum 53810 46472 7338 2517 18468942

5 DLC 66 Cum 35002 26594 8408 4712 39616503

6 PQC 69 Cum 231285 132264 99021 6213 615215143

7 Recron 70 KG 231285 132264 99021 414 40994539

8 HDPE Sheet 68 Sqm 569755 569755 98 55835990

9 DBM 75,76,77 Cum 65251 49832 15419 10142 156379711

10 Soling for Service Road 33 Cum 7092 7092 2047 14514960

11 WBM 34 Cum 6000 4091 1909 2519 4807505

12 BM for Service Road 37 Cum 1750 1750 9251 16189250

13 S DAC for Service Road 40 Cum 3000 3000 11363 34087500


B
Name of Work: Resurfacing of Ru

TENTATIVE MATERIAL REQUIRED FOR BALANC

Item 6mm
Sr
Descriptio Unit Quantity
No:
n
MT

Kg/ Cum -
1 PQC 99021
Cum -

Kg/ Cum -
2 DLC 8408
Cum -
Item 6mm
Sr
Descriptio Unit Quantity
No:
n
MT

Kg/ Cum -

3 WMM
Cum 7338 -

MT 16957 -

Kg/ Cum - 558

4 DBM Cum 15,419 -


Item 6mm
Sr
Descriptio Unit Quantity
No:
4 DBM
n
MT

MT 36,081 8,604

Kg/ Cum - 211

BM For
7 Cum 1,750.00 -
service road

MT 3,853.50 370
Item 6mm
Sr
Descriptio Unit Quantity
No:
n
MT

Kg/ Cum - 244

Semi Dense
8 Asphalt Cum 3,000.00 -
concrete

MT 7,056.00 733

Total Quantity (MT)= 9,707


BSCPL Infrastructure Limited
esurfacing of Runway and Aircraft Operating Areas at AF Station Cha

ED FOR BALANCE QUANTITY TO BE EXECUTED (TENTATIVE) AS PER CO

10mm 20mm 26.5 mm 31.5 mm

MT MT MT MT

531 382 - 412

52580 37826 - 40796

770 - 726 -

6,474 - 6,104 -
10mm 20mm 26.5 mm 31.5 mm

MT MT MT MT

463 508 - -

- - - -

3,397 3,728 - -

469 380 - -

- - - -
10mm 20mm 26.5 mm 31.5 mm

MT MT MT MT

7,232 5,859 - -

782 846

- - - -

1,369 1,480 - -
10mm 20mm 26.5 mm 31.5 mm

MT MT MT MT

778 445

- - - -

2,334 1,334 - -

73,385 50,226 6,104 40,796


F Station Chandigarh

VE) AS PER CONTRACT AGREEMENT UPTO RAR-38

40mm St.Dust Coarse Sand Remarks

MT MT MT

- - 565

- - 55947

- - 704

- - 5,919
40mm St.Dust Coarse Sand Remarks

MT MT MT

693 647 -

- - -

5,085 4,747 - ###

- 827 - ###

- - - ###
40mm St.Dust Coarse Sand Remarks

MT MT MT

- 12,746 - ###

275 ###

- - - ###

- 481 - ###
40mm St.Dust Coarse Sand Remarks

MT MT MT

756 ###

- - - ###

- 2,267 - ###

5,085 20,242 61,866


BSCPL INFRASTRUCTURE LTD
NAME OF PROJECT : RESURFACING OF RUNWAY AND AIRCRAFT OPERATING AREAS AT AF STATION CHANDIGARH
Tentative Material Requirement for Balance Work as per Contract Agreement (Upto RAR-38)
Description of Required Quantity for Stock Available at Site As
S.no Aggeregate Unit Balance Work on 28.02.2019 Balance Quantity Required Remrks

1 6mm MT 9707 849 8858


2 10mm MT 73385 19986 53399
3 20/26.5 mm MT 56330 39905 16425
4 31.5 mm MT 40796 22003 18793
5 40mm MT 5085 13860 -
6 St.Dust MT 20242 14024 6218
7 Coarse Sand MT 61866 28992 32874
Total Quantity >>> MT 267411 139619 136567
BSCPL INFRASTRUCTURE LTD
NAME OF PROJECT : RESURFACING OF RUNWAY AND AIRCRAFT OPERATING AREAS AT AF STATION CHANDIGARH
Tentative Material Requirement for Balance Work as per Contract Agreement (Upto RAR-37)
Description of Required Quantity for Stock Available at Site As
S.no Unit Balance Quantity Required Remrks
Aggeregate Balance Work on 28.02.2019
1 6mm MT 9707 1152 8555
2 10mm MT 73385 25396 47989
3 20/26.5 mm MT 56330 44213 12117
4 31.5 mm MT 40796 24013 16783
5 40mm MT 5085 5085 -
6 St.Dust MT 20242 16467 3775
7 Coarse Sand MT 61866 31380 30485
Total Quantity >>> MT 267411 147707 119704